{"api":{"list":"https://sicto.si/api/sis-onsite.php?a=list","plant":"https://sicto.si/api/sis-onsite.php?a=plant&p=<slug>"},"built_by":"The $SIS community (siscto.si), built by Codeflex","name":"Onsite Power Watch","plants":{"apollo":{"city":"Middleton Township, Wood County","connection":"On site, behind the meter or beside the campus","facts":["The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).","Epoch AI's record of Meta Bowling Green, which the Power Map uses, lists the Apollo project and the Siting Board announcement among its sources."],"filing":"Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026","fuel":"gas","mw":350,"mw_text":"350 MW, plus about 120 MW of batteries","name":"Apollo Power Generation Facility","power_map_site":"https://siscto.si/power-map/meta-bowling-green/","serves":"The data center campus of Liames, LLC, beside the plant in Wood County, Ohio","slug":"apollo","sources":[{"date":"2026-02-03","publisher":"Ohio Power Siting Board","read":"2026-11-23","title":"OPSB authorizes construction of Wood County power plant","url":"https://content.govdelivery.com/accounts/OHPUC/bulletins/4077fa5"}],"state":"OH","status":"permitted","status_date":"2026-02-03","tech":"Gas generation with about 120 MW of battery storage","url":"https://siscto.si/onsite-power/apollo/"},"clinton-meta":{"city":"Clinton","connection":"An existing or restarting nuclear plant under an agreement","facts":["Meta will buy 1,121 MW from the Clinton plant in Illinois for 20 years from June 2027, including 30 MW from uprates (Constellation, June 3, 2025)."],"filing":"Constellation's announcement of June 3, 2025: a 20 year agreement starting June 2027","fuel":"nuclear","mw":1121,"mw_text":"1,121 MW under the agreement","name":"Clinton Clean Energy Center, Meta agreement","power_map_site":null,"serves":"Meta, under a power purchase agreement (no single data center named)","slug":"clinton-meta","sources":[{"date":"2025-06-03","publisher":"Constellation","read":"2026-11-23","title":"Constellation, Meta Sign 20-Year Deal for Clean, Reliable Nuclear Energy in Illinois","url":"https://www.constellationenergy.com/newsroom/2025/constellation-meta-sign-20-year-deal-for-clean-reliable-nuclear-energy-in-illinois.html"}],"state":"IL","status":"running","status_date":"2025-06-03","tech":"Existing nuclear plant; 20 year power purchase agreement","url":"https://siscto.si/onsite-power/clinton-meta/"},"colossus-1-turbines":{"city":"Memphis","connection":"On site, behind the meter or beside the campus","facts":["The Shelby County Health Department issued the permit on July 2, 2025, for 15 Solar SMT-130 turbines with up to 247 MW (TechCrunch, July 3, 2025).","Epoch AI's record of the site, which the Power Map uses, lists the July 2025 turbine permit among its sources."],"filing":"Air permit from the Shelby County Health Department, issued July 2, 2025, for 15 turbines","fuel":"gas","mw":247,"mw_text":"up to 247 MW","name":"Colossus 1 gas turbines","power_map_site":"https://siscto.si/power-map/colossus-1/","serves":"xAI's Colossus 1 data center, Memphis, Tennessee","slug":"colossus-1-turbines","sources":[{"date":"2025-07-03","publisher":"TechCrunch","read":"2026-11-23","title":"xAI gets permits for 15 natural gas generators at Memphis data center","url":"https://techcrunch.com/2025/07/03/xai-gets-permits-for-15-natural-gas-generators-at-memphis-data-center"}],"state":"TN","status":"permitted","status_date":"2025-07-02","tech":"15 Solar SMT-130 gas turbines","url":"https://siscto.si/onsite-power/colossus-1-turbines/"},"crane-microsoft":{"city":"Middletown","connection":"An existing or restarting nuclear plant under an agreement","facts":["Constellation is restoring the 835 MW unit for Microsoft under what it calls its largest power purchase agreement, with the plant expected online in 2027 (Constellation, plant page read November 23, 2026).","The restart needs Nuclear Regulatory Commission approval and state and local permits."],"filing":"Constellation's plant page: restart expected in 2027, subject to Nuclear Regulatory Commission approval","fuel":"nuclear","mw":835,"mw_text":"835 MW","name":"Crane Clean Energy Center, Microsoft agreement","power_map_site":null,"serves":"Microsoft, under a power purchase agreement (no single data center named)","slug":"crane-microsoft","sources":[{"date":"2026-11-23","publisher":"Constellation","read":"2026-11-23","title":"Crane Clean Energy Center","url":"https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html"}],"state":"PA","status":"building","status_date":"2026-11-23","tech":"Restart of the former Three Mile Island Unit 1","url":"https://siscto.si/onsite-power/crane-microsoft/"},"entergy-evest":{"city":"Richland Parish and Pointe Coupee Parish","connection":"Utility plants on the grid, certified to serve one customer","facts":["In March 2026 Entergy Louisiana signed a service agreement with Evest LLC, a Meta subsidiary, and applied to build seven combined cycle units totaling 5,278 MW, four near the customer site in Richland Parish and three in Pointe Coupee Parish (Entergy, Form 10-Q, November 2, 2026).","A settlement with the LPSC staff and one intervenor recommends certification. Entergy expects the decision in December 2026 and in service dates in 2030 and 2031."],"filing":"Entergy Louisiana application to the LPSC of March 2026; a settlement recommends certification; LPSC decision expected in December 2026","fuel":"gas","mw":5278,"mw_text":"5,278 MW of gas units","name":"Richland Parish 1 to 4 and Pointe Coupee 1 to 3","power_map_site":null,"serves":"A second Meta data center in north Louisiana, to be developed by Evest LLC","slug":"entergy-evest","sources":[{"date":"2026-11-02","publisher":"Entergy","read":"2026-11-23","title":"Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)","url":"https://www.sec.gov/Archives/edgar/data/65984/000006598426000325/etr-20260930.htm"}],"state":"LA","status":"proposed","status_date":"2026-11-02","tech":"Seven combined cycle gas units and three battery systems","url":"https://siscto.si/onsite-power/entergy-evest/"},"entergy-meta-hyperion":{"city":"Richland Parish and Killona","connection":"Utility plants on the grid, certified to serve one customer","facts":["Entergy Louisiana asked the LPSC in October 2024 to certify three combined cycle units totaling 2,262 MW to serve a new data center of a Meta subsidiary in north Louisiana; the LPSC accepted a settlement in August 2025 (Entergy, Form 10-K for 2025).","Entergy expects Franklin Farms Units 1 and 2 in service in 2028 and Waterford 5 in 2029. These are utility plants on the grid, built for one customer.","Epoch AI's record of Meta Hyperion ties the site to three gas units with 2,262 MW."],"filing":"Louisiana Public Service Commission order of August 2025 accepting a settlement and certifying the units","fuel":"gas","mw":2262,"mw_text":"2,262 MW","name":"Franklin Farms 1 and 2 and Waterford 5","power_map_site":"https://siscto.si/power-map/meta-hyperion/","serves":"A Meta data center in north Louisiana (the Power Map's Meta Hyperion)","slug":"entergy-meta-hyperion","sources":[{"date":"2026-02-19","publisher":"Entergy","read":"2026-11-23","title":"Annual report for 2025 (SEC Form 10-K)","url":"https://www.sec.gov/Archives/edgar/data/65984/000006598426000174/etr-20251231.htm"}],"state":"LA","status":"permitted","status_date":"2025-08-31","tech":"Three combined cycle gas units built by the utility","url":"https://siscto.si/onsite-power/entergy-meta-hyperion/"},"homer-city":{"city":"Homer City","connection":"On site, behind the meter or beside the campus","facts":["The Pennsylvania DEP lists final Air Quality Plan Approval 32-00457A of November 18, 2025 for the redevelopment of the site into a gas powered data center campus (DEP page, updated November 12, 2026).","The developer says the approval covers up to 4.4 GW from seven GE Vernova 7HA.02 turbines, with first power expected in 2027 (Homer City Generation, November 20, 2025)."],"filing":"Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025","fuel":"gas","mw":4400,"mw_text":"up to 4,400 MW","name":"Homer City Energy Campus","power_map_site":null,"serves":"A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania","slug":"homer-city","sources":[{"date":"2026-11-12","publisher":"Pennsylvania DEP","read":"2026-11-23","title":"Homer City Generation Site Redevelopment","url":"https://pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment"},{"date":"2025-11-20","publisher":"Homer City Generation","read":"2026-11-23","title":"Homer City Generation Receives Air Quality Plan Approval from PA DEP","url":"https://www.businesswire.com/news/home/20251120696816/en"}],"state":"PA","status":"permitted","status_date":"2025-11-18","tech":"Seven GE Vernova 7HA.02 gas turbines","url":"https://siscto.si/onsite-power/homer-city/"},"meta-el-paso-gas":{"city":"El Paso","connection":"A plant planned for one data center","facts":["The report lists a planned 366 MW gas plant for a Meta data center in El Paso (The Texas Tribune and Floodlight, July 9, 2026). The permit is on the monthly recheck list."],"filing":"Planned; no permit named in the source read","fuel":"gas","mw":366,"mw_text":"366 MW","name":"Gas plant for Meta in El Paso","power_map_site":null,"serves":"A Meta data center in El Paso, Texas","slug":"meta-el-paso-gas","sources":[{"date":"2026-07-09","publisher":"The Texas Tribune and Floodlight","read":"2026-11-23","title":"Planned Texas data centers could emit more greenhouse gases than many countries","url":"https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/"}],"state":"TX","status":"proposed","status_date":"2026-07-09","tech":"Gas plant","url":"https://siscto.si/onsite-power/meta-el-paso-gas/"},"socrates":{"city":"New Albany","connection":"On site, behind the meter or beside the campus","facts":["The Ohio Power Siting Board approved Socrates South, a 200 MW gas plant built by a Williams subsidiary, behind the meter and not connected to the grid, for an adjacent data center of Sidecat, LLC, a Meta affiliate (OPSB, June 9, 2025).","Williams' fact sheet lists Socrates North and South at 200 MW each, targeting service in the third quarter of 2026.","On May 5, 2026 Williams said the Socrates project was under construction in Ohio and nearing completion."],"filing":"Ohio Power Siting Board approval of Socrates South (case 25-0185-EL-BLN), announced June 9, 2025","fuel":"gas","mw":400,"mw_text":"400 MW (200 MW each)","name":"Socrates North and South","power_map_site":"https://siscto.si/power-map/meta-prometheus/","serves":"A data center of Sidecat, LLC, an affiliate of Meta Platforms, in New Albany, Ohio","slug":"socrates","sources":[{"date":"2025-06-09","publisher":"Ohio Power Siting Board","read":"2026-11-23","title":"OPSB approves construction of Licking County natural gas-fired power plant","url":"https://content.govdelivery.com/accounts/OHPUC/bulletins/3e43bed"},{"date":"2025-08-01","publisher":"Williams","read":"2026-11-23","title":"Socrates North and South fact sheet","url":"https://www.williams.com/wp-content/uploads/sites/8/2025/08/1355-Socrates-North-Fact-Sheet_v6.pdf"},{"date":"2026-05-05","publisher":"Williams","read":"2026-11-23","title":"Q1 earnings recap: data centers accelerate new growth paths for Williams","url":"https://www.williams.com/2026/05/05/q1-earnings-recap-data-centers-accelerate-new-growth-paths-for-williams/"}],"state":"OH","status":"building","status_date":"2026-05-05","tech":"Gas turbines and engines, two 200 MW sites","url":"https://siscto.si/onsite-power/socrates/"},"southaven-turbines":{"city":"Southaven","connection":"On site, behind the meter or beside the campus","facts":["The Mississippi Environmental Quality Permit Board approved the construction permit for 41 permanent gas turbines on March 10, 2026 (Mississippi Free Press, March 10, 2026).","The plant site is in Southaven, Mississippi. The report says the turbines power Colossus 2 in neighboring Memphis."],"filing":"Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech","fuel":"gas","mw":null,"mw_text":"not stated in the sources read (41 turbines)","name":"Southaven gas turbines for Colossus 2","power_map_site":"https://siscto.si/power-map/colossus-2/","serves":"xAI's Colossus 2 data center in Memphis, Tennessee, across the state line","slug":"southaven-turbines","sources":[{"date":"2026-03-10","publisher":"Mississippi Free Press","read":"2026-11-23","title":"Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center","url":"https://www.mississippifreepress.org/mississippi-permit-board-grants-xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-center/"}],"state":"MS","status":"permitted","status_date":"2026-03-10","tech":"41 permanent gas turbines","url":"https://siscto.si/onsite-power/southaven-turbines/"},"stargate-abilene-onsite":{"city":"Abilene","connection":"On site, behind the meter or beside the campus","facts":["The report describes a 360 MW onsite gas plant with 10 turbines built under minor permits from 2024, and an expansion of 41 turbines and 18 generators sought under a major air permit application (The Texas Tribune and Floodlight, July 9, 2026).","Epoch AI's record of the site notes gas turbines in place beside the buildings."],"filing":"Minor state permits of 2024 (permits by rule and standard permits) for 10 turbines and 62 backup diesel generators; a major air permit application for the expansion","fuel":"gas","mw":360,"mw_text":"360 MW","name":"Stargate Abilene onsite gas plant","power_map_site":"https://siscto.si/power-map/openai-stargate-abilene/","serves":"The OpenAI Stargate campus built by Crusoe in Abilene, Texas","slug":"stargate-abilene-onsite","sources":[{"date":"2026-07-09","publisher":"The Texas Tribune and Floodlight","read":"2026-11-23","title":"Planned Texas data centers could emit more greenhouse gases than many countries","url":"https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/"}],"state":"TX","status":"running","status_date":"2026-07-09","tech":"10 gas turbines built; 41 more turbines and 18 generators proposed","url":"https://siscto.si/onsite-power/stargate-abilene-onsite/"},"susquehanna-amazon":{"city":"Salem Township","connection":"An existing or restarting nuclear plant under an agreement","facts":["Talen will supply 1,920 MW of nuclear power from Susquehanna to Amazon through 2042, ramping to the full amount no later than 2032 (Talen Energy, June 11, 2025).","The earlier co-located arrangement moves to front of the meter after transmission work expected in spring 2026: the plant supplies the PJM grid and Talen is Amazon's retail supplier.","Epoch AI's record of AWS Berwick, which the Power Map uses, cites Talen's sale of the Susquehanna data center campus to AWS."],"filing":"Talen Energy's announcement of June 11, 2025: a power purchase agreement through 2042","fuel":"nuclear","mw":1920,"mw_text":"1,920 MW under the agreement","name":"Susquehanna nuclear plant, Amazon agreement","power_map_site":"https://siscto.si/power-map/aws-berwick/","serves":"Amazon's data center campus beside the Susquehanna plant, Pennsylvania","slug":"susquehanna-amazon","sources":[{"date":"2025-06-11","publisher":"Talen Energy","read":"2026-11-23","title":"Talen Energy Expands Nuclear Energy Relationship with Amazon","url":"https://www.globenewswire.com/news-release/2025/06/11/3097385/0/en/Talen-Energy-Expands-Nuclear-Energy-Relationship-with-Amazon.html"}],"state":"PA","status":"running","status_date":"2025-06-11","tech":"Existing nuclear plant; power purchase agreement","url":"https://siscto.si/onsite-power/susquehanna-amazon/"}},"recheck":[{"how":"State air permits for data center plants (the Texas Tribune counted at least 15 planned gas plants), the GW Ranch permit in Pecos County and Meta El Paso.","url":"https://www.tceq.texas.gov/permitting/air","what":"Texas"},{"how":"The capacity of the 41 Southaven turbines and any new Memphis permits.","url":"https://www.shelbycountytn.gov/","what":"xAI"},{"how":"Ohio Power Siting Board cases for behind the meter plants serving data centers.","url":"https://opsb.ohio.gov/","what":"Ohio"},{"how":"The LPSC decision on the Evest units, expected in December 2026.","url":"https://lpsc.louisiana.gov/","what":"Louisiana"},{"how":"The Crane restart schedule and new nuclear agreements with data center owners.","url":"https://www.nrc.gov/","what":"Nuclear"},{"how":"Whether its tracker data may be reused here (its license was not confirmed from its pages on November 23, 2026, so none of its project data is used).","url":"https://globalenergymonitor.org/","what":"Global Energy Monitor"}],"totals":{"by_fuel":{"gas":9,"nuclear":3},"by_status":{"building":2,"permitted":5,"proposed":2,"running":3},"gas_mw_stated":13663,"gas_plants_with_size":8,"note":"Capacity is added only for gas plants whose size a source states. Nuclear agreements are never added.","plants":12,"with_batteries":2},"updated":"2026-11-23","url":"https://siscto.si/onsite-power/"}