# Meta Kuna Heat Watch: Seen From Space | $SIS

> Meta Kuna: summer land heat from NASA satellites, +3.0 °C by day and -0.8 °C by night against the land 5 to 10 km around it, with built and announced power.

Source: https://siscto.si/heat-watch/meta-kuna/
Updated: 2026-11-17

1. [Home](https://siscto.si/)
2. [Heat Watch](https://siscto.si/heat-watch/)
3. Meta Kuna

Heat Watch · Kuna, Idaho

# Meta Kuna: heat from space

In the summer of 2026, NASA's MODIS satellite read the ground at Meta Kuna in Kuna, Idaho 3.0 °C warmer than the land 5 to 10 km around it by day, and 0.4 °C cooler than it by night. The first building has not run long enough for a before and after: the Power Map dates work from Jul 1, 2022 and the first building from Jun 1, 2026. It ranks 3 of 96 sites on Heat Watch. Heat is one public signal, never proof a site is running.

Day gap
:   +3.0 °C

Night gap
:   -0.8 °C

Since built
:   Not yet

Summers read
:   15

Every summer

## The site against the land around it

Summer land surface temperature at the site pixel and the average of the 5 to 10 km ring, and the gap between them, by day and by night.

- Site pixel

- Ring, 5 to 10 km

- Gap

- Power Map dates

NASA MOD11A2 v061 (MODIS on Terra, 8-day land surface temperature, 1 km) via the ORNL DAAC MODIS web service, ten composites from about June 9 to August 28 each summer, read November 17, 2026. Cloud: fewer than three clear composites that summer. Dates: the Power Map's timeline from Epoch AI.

Next to the Ledger

## Heat, and what is built

The heat is one signal. These are the others, each from its own public source.

Built and announced

On the [Power Map](https://siscto.si/power-map/meta-kuna/): operating, 152 MW of IT power running in 2 buildings as of Jun 1, 2026, per Epoch AI.

This site is not one of the Gigawatt Ledger's projects yet, so it has no announced figure there.

Before and after

There are not yet two clear summers on both sides of the Power Map's dates for this site, so no before and after is shown.

The dates are the first step and the first running building on the Power Map's timeline from Epoch AI; some sites had older buildings before them. New roofs, paving and cleared ground warm land on their own, so a rise after construction does not by itself show heat from computing.

The numbers

## Summer by summer

Means of the clear 8-day composites, in degrees Celsius. The gap is the site minus the ring.

Join the takeover

## Watch the heat with us

Share this chart and bring what you find to the $SIS Telegram.
