# Meta Hyperion: Announced vs Built | Gigawatt Ledger

> Meta Hyperion in Richland Parish, Louisiana: 2 GW announced, nothing confirmed energized as of Apr 19, 2026. Every announcement and the evidence, with sources.

Source: https://siscto.si/ledger/meta-hyperion/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Meta Hyperion

Gigawatt Ledger · Under construction

# Meta Hyperion, announced against built

Meta Hyperion is an SI compute project in Richland Parish, Louisiana, by Meta. The announced figure is over two gigawatts of compute capacity, from Meta (Nov 11, 2026 (undated page, read on this date)). Epoch AI tracks the site as under construction, with no building operating as of April 19, 2026. Its state today: under construction.

Announced
:   2 GW

Energized
:   None (Apr 19, 2026)

State
:   Under construction

Source links
:   4

Announced

## What was said, and when

Each row is one public announcement about Meta Hyperion: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Jul 14, 2025**

Mark Zuckerberg and Meta, reported by TechCrunch

### [Mark Zuckerberg says Meta is building a 5GW AI data center](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center)

TechCrunch reports Mark Zuckerberg's Threads post and a Meta spokesperson's dates for Hyperion.

> “bring two gigawatts of data center capacity online by 2030”

> “would scale to five gigawatts in several years”

Power or capacity stated
:   2 GW, scaling to 5 GW

Promised
:   2 GW online by 2030

**Sep 29, 2025**

Meta

### [Meta's Infrastructure Evolution and the Advent of AI](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/)

Meta's engineering blog describes Hyperion and when it starts to come online.

> “will have the ability to scale up to a capacity of 5 gigawatts”

> “expected to come online beginning in 2028”

Power or capacity stated
:   Ability to scale up to 5 GW

Promised
:   Online beginning in 2028

**Nov 11, 2026**

Meta

### [The largest Meta data center yet brings big impact to Louisiana](https://datacenters.atmeta.com/richland-parish-data-center/)

Meta's page for the Richland Parish data center, first announced in December 2024.

> “The data center will deliver over two gigawatts of compute capacity to train future open-source large language models.”

> “delivering 5 gigawatts of compute capacity to house Hyperion, our largest multi-gigawatt AI cluster”

Power or capacity stated
:   Over 2 GW of compute capacity; 5 GW for Hyperion

Promised
:   None stated

The larger figure, scale up to 5 gigawatts (Meta, Sep 29, 2025), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of April 19, 2026.

**Apr 19, 2026**

Epoch AI · Power Map

### Meta Hyperion on the Power Map

Epoch AI tracks Meta Hyperion as under construction: no building is operating as of April 19, 2026.

> Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 1,632 MW of IT power by January 1, 2028. A projection, not a fact yet.

Seen from orbit · Compute Watch

### The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.6 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-hyperion/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Dec 20, 2024**

Meta Hyperion: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-hyperion/))

**Jul 14, 2025**

Mark Zuckerberg and Meta, reported by TechCrunch: 2 GW, scaling to 5 GW. Promised: 2 GW online by 2030. (Announcement · [TechCrunch](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center))

**Sep 29, 2025**

Meta: Ability to scale up to 5 GW. Promised: online beginning in 2028. (Announcement · [Engineering at Meta](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/))

**Oct 19, 2025**

Meta Hyperion: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-hyperion/))

**Apr 19, 2026**

Meta Hyperion: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-hyperion/))

**Nov 11, 2026**

Meta: Over 2 GW of compute capacity; 5 GW for Hyperion. (Announcement · [Meta Data Centers](https://datacenters.atmeta.com/richland-parish-data-center/), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Mark Zuckerberg says Meta is building a 5GW AI data center](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center), TechCrunch, Jul 14, 2025

- [Meta's Infrastructure Evolution and the Advent of AI](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/), Engineering at Meta, Sep 29, 2025

- [The largest Meta data center yet brings big impact to Louisiana](https://datacenters.atmeta.com/richland-parish-data-center/), Meta Data Centers, Nov 11, 2026 (undated page, read on this date)

- [Meta Hyperion on the Power Map](https://siscto.si/power-map/meta-hyperion/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Meta Prometheus

New Albany, Ohio

1 GW announced · 471 to 612 MW

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed