Gigawatt Ledger · Partly energized

# Meta Prometheus, announced against built

Meta Prometheus is an SI compute project in New Albany, Ohio, by Meta. The announced figure is 1 gigawatt cluster, from Meta (Sep 29, 2025). Public evidence puts 471 to 612 MW in operation as of August 31, 2026, against 1 GW announced: 47% to 61%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means. Its state today: partly energized.

Announced
:   1 GW

Energized
:   471 to 612 MW (Aug 31, 2026)

State
:   Partly energized

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Meta Prometheus: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Jul 14, 2025**

Mark Zuckerberg, reported by TechCrunch

### [Mark Zuckerberg says Meta is building a 5GW AI data center](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center)

TechCrunch reports Mark Zuckerberg's Threads post. A Meta spokesperson places Prometheus in New Albany, Ohio.

> “bring a 1 GW super cluster, called Prometheus, online in 2026”

Power or capacity stated
:   1 GW

Promised
:   Online in 2026

**Sep 29, 2025**

Meta

### [Meta's Infrastructure Evolution and the Advent of AI](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/)

Meta's engineering blog describes Prometheus as a cluster spread over several buildings, tents and colocation halls in one region.

> “will be a 1-gigawatt cluster spanning across multiple data center buildings”

Power or capacity stated
:   1 GW cluster

Promised
:   None stated

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Public evidence puts 471 to 612 MW in operation as of August 31, 2026, against 1 GW announced: 47% to 61%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

**Aug 31, 2026**

Epoch AI · Power Map

### Meta Prometheus on the Power Map

Epoch AI counts 10 buildings operating at Meta Prometheus and estimates 471 MW of IT power (612 MW for the whole facility) as of August 31, 2026.

> Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.

IT power running
:   471 MW

Whole facility
:   612 MW

Epoch AI projects 1,022 MW of IT power by July 1, 2028. A projection, not a fact yet.

Seen from orbit · Compute Watch

### The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-prometheus/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Jul 14, 2025**

Mark Zuckerberg, reported by TechCrunch: 1 GW. Promised: online in 2026. (Announcement · [TechCrunch](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center))

**Sep 29, 2025**

Meta: 1 GW cluster. (Announcement · [Engineering at Meta](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/))

**Jan 18, 2026**

Meta Prometheus: 6 buildings operating, 368 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-prometheus/))

**Mar 12, 2026**

Meta Prometheus: 6 buildings operating, 368 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-prometheus/))

**May 18, 2026**

Meta Prometheus: 6 buildings operating, 368 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-prometheus/))

**Aug 31, 2026**

Meta Prometheus: 10 buildings operating, 471 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/meta-prometheus/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Mark Zuckerberg says Meta is building a 5GW AI data center](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center), TechCrunch, Jul 14, 2025

- [Meta's Infrastructure Evolution and the Advent of AI](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/), Engineering at Meta, Sep 29, 2025

- [Meta Prometheus on the Power Map](https://siscto.si/power-map/meta-prometheus/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Meta Hyperion

Richland Parish, Louisiana

2 GW announced · nothing confirmed

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed