# Microsoft Fairwater Wisconsin: Announced vs Built | $SIS

> Microsoft Fairwater Wisconsin in Mount Pleasant, Wisconsin: no power figure stated; Epoch AI estimates 369 MW of IT power running as of May 15, 2026. Sourced.

Source: https://siscto.si/ledger/microsoft-fairwater-wisconsin/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Microsoft Fairwater Wisconsin

Gigawatt Ledger · Partly energized

# Microsoft Fairwater Wisconsin, announced against built

Microsoft Fairwater Wisconsin is an SI compute project in Mount Pleasant, Wisconsin, by Microsoft. No source states a power figure for this project alone, so it is not in the Ledger's total. No power figure was announced. Epoch AI estimates 369 MW of IT power in operation (442 MW for the whole facility) as of May 15, 2026, with more capacity on its timeline. Its state today: partly energized.

Announced
:   Not stated

Energized
:   369 MW IT (May 15, 2026)

State
:   Partly energized

Source links
:   2

Announced

## What was said, and when

Each row is one public announcement about Microsoft Fairwater Wisconsin: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Sep 18, 2025**

Microsoft

### [Made in Wisconsin: The world's most powerful AI datacenter](https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/)

Microsoft announces the Fairwater datacenter in Mount Pleasant and a second one. It states money and a date, and no power figure.

> “bring this AI datacenter online in early 2026”

> “an additional $4 billion to be spent in the next three years”

Power or capacity stated
:   None stated

Promised
:   Online in early 2026; a second datacenter within three years

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

No power figure was announced. Epoch AI estimates 369 MW of IT power in operation (442 MW for the whole facility) as of May 15, 2026, with more capacity on its timeline.

**May 15, 2026**

Epoch AI · Power Map

### Microsoft Fairwater Wisconsin on the Power Map

Epoch AI counts 1 building operating at Microsoft Fairwater Wisconsin and estimates 369 MW of IT power (442 MW for the whole facility) as of May 15, 2026.

> The main shell of Building 2 looks almost completed. In Area 2 (northwest of Buildings 1-2), the grading for the original design has been replaced with grading for the new [9-building design](https://www.mtpleasantwi.gov/AgendaCenter/ViewFile/Agenda/_01212026-1292), making way for Buildings 3-11. Work continues on the northern substation in Area 2.

IT power running
:   369 MW

Whole facility
:   442 MW

Epoch AI projects 2,263 MW of IT power by May 13, 2028. A projection, not a fact yet.

Seen from orbit · Compute Watch

### The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/microsoft-fairwater-wisconsin/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Sep 18, 2025**

Microsoft: no power figure stated. Promised: online in early 2026; a second datacenter within three years. (Announcement · [Microsoft On the Issues](https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/))

**Sep 26, 2025**

Microsoft Fairwater Wisconsin: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-fairwater-wisconsin/))

**Jan 28, 2026**

Microsoft Fairwater Wisconsin: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-fairwater-wisconsin/))

**Apr 16, 2026**

Microsoft Fairwater Wisconsin: 1 building operating, 369 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-fairwater-wisconsin/))

**May 15, 2026**

Microsoft Fairwater Wisconsin: 1 building operating, 369 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-fairwater-wisconsin/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Made in Wisconsin: The world's most powerful AI datacenter](https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/), Microsoft On the Issues, Sep 18, 2025

- [Microsoft Fairwater Wisconsin on the Power Map](https://siscto.si/power-map/microsoft-fairwater-wisconsin/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Abilene campus for Microsoft

Abilene, Texas

900 MW announced · nothing confirmed

### Microsoft Fairwater Atlanta

Fayetteville, Georgia

No power figure stated · 636 MW IT

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW