> Nebius Mäntsälä in Mäntsälä, Finland: 75 MW announced, 75 to 90 MW confirmed energized as of Jun 29, 2026. Every announcement and the evidence, with sources.

Source: https://siscto.si/ledger/nebius-mantsala/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Nebius Mäntsälä

Gigawatt Ledger · Energized

# Nebius Mäntsälä, announced against built

Nebius Mäntsälä is an SI compute project in Mäntsälä, Uusimaa, Finland, by Nebius. The announced figure is 75 MW, from Nebius (Oct 8, 2024). Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means. Its state today: energized.

Announced
:   75 MW

Energized
:   75 to 90 MW (Jun 29, 2026)

State
:   Energized

Source links
:   2

Announced

## What was said, and when

Each row is one public announcement about Nebius Mäntsälä: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Oct 8, 2024**

Nebius

### [Nebius to triple capacity at Finland data center to 75 MW](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw)

Nebius says it will triple its Mäntsälä data center.

> “Nebius to triple capacity at Finland data center to 75 MW”

> “place up to 60,000 GPUs at the Mäntsälä location alone”

Power or capacity stated
:   75 MW

Promised
:   None stated

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

**Jun 29, 2026**

Epoch AI · Power Map

### Nebius Mantsala on the Power Map

Epoch AI counts 3 buildings operating at Nebius Mantsala and estimates 75 MW of IT power (90 MW for the whole facility) as of June 29, 2026.

> All three buildings in the first phase are operational.

IT power running
:   75 MW

Whole facility
:   90 MW

Epoch AI projects 145 MW of IT power by December 31, 2027. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day, a change of +0.1 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/nebius-mantsala/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Oct 8, 2024**

Nebius: 75 MW. (Announcement · [Nebius](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw))

**Oct 8, 2024**

Nebius Mantsala: 2 buildings operating, 40 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/nebius-mantsala/))

**Nov 14, 2025**

Nebius Mantsala: 2 buildings operating, 40 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/nebius-mantsala/))

**Mar 31, 2026**

Nebius Mantsala: 3 buildings operating, 75 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/nebius-mantsala/))

**Jun 29, 2026**

Nebius Mantsala: 3 buildings operating, 75 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/nebius-mantsala/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Nebius to triple capacity at Finland data center to 75 MW](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw), Nebius, Oct 8, 2024

- [Nebius Mantsala on the Power Map](https://siscto.si/power-map/nebius-mantsala/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW

### Meta Hyperion

Richland Parish, Louisiana

2 GW announced · nothing confirmed

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed