# Project Rainier, New Carlisle: Announced vs Built | $SIS

> Project Rainier, New Carlisle in New Carlisle, Indiana: no power figure stated; Epoch AI estimates 1,037 MW of IT power running as of Oct 19, 2026. Sourced.

Source: https://siscto.si/ledger/project-rainier-new-carlisle/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Project Rainier, New Carlisle

Gigawatt Ledger · Partly energized

# Project Rainier, New Carlisle, announced against built

Project Rainier, New Carlisle is an SI compute project in New Carlisle, Indiana, by Amazon and Anthropic. No source states a power figure for this project alone, so it is not in the Ledger's total. No power figure was announced. Epoch AI estimates 1,037 MW of IT power in operation (1,244 MW for the whole facility) as of October 19, 2026, with more capacity on its timeline. Its state today: partly energized.

Announced
:   Not stated

Energized
:   1,037 MW IT (Oct 19, 2026)

State
:   Partly energized

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Project Rainier, New Carlisle: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Jun 24, 2025**

Amazon

### [AWS's Project Rainier: the world's most powerful computer for training AI](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster)

Amazon describes Project Rainier and its site in St. Joseph County, Indiana, used by Anthropic. It counts chips and states no power figure.

> “nearly half a million Trainium2 chips”

> “Claude is expected to be on more than 1 million Trainium2 chips”

Power or capacity stated
:   None stated

Promised
:   More than 1 million Trainium2 chips by the end of the year

**Jul 4, 2025**

The New York Times, reported by The Register

### [Amazon Project Rainier: AI supercomputer for Anthropic](https://www.theregister.com/2025/07/04/project_rainier_deep_dive/)

The Register cites a New York Times report for the campus power and an Amazon director for the number of buildings. A press figure is listed, never counted.

> “consume upwards of 2.2 gigawatts of power”

> “will span thirty datacenters at 200,000 square feet apiece”

Power or capacity stated
:   Upwards of 2.2 GW (press report)

Promised
:   None stated

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

No power figure was announced. Epoch AI estimates 1,037 MW of IT power in operation (1,244 MW for the whole facility) as of October 19, 2026, with more capacity on its timeline.

**Oct 19, 2026**

Epoch AI · Power Map

### Anthropic-Amazon New Carlisle on the Power Map

Epoch AI counts 18 buildings operating at Anthropic-Amazon New Carlisle and estimates 1,037 MW of IT power (1,244 MW for the whole facility) as of October 19, 2026.

> Buildings 17-18 are operational. This is an estimate based on a rule of thumb of "operational 5 months after roof is complete", assuming the roofs took one more month after 2025-12-23. Also added four more months to account for commissioning and adjacent cooling units not being complete yet.

IT power running
:   1,037 MW

Whole facility
:   1,244 MW

Epoch AI projects 1,925 MW of IT power by March 17, 2028. A projection, not a fact yet.

Seen from orbit · Compute Watch

### The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/anthropic-amazon-new-carlisle/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Jun 24, 2025**

Amazon: no power figure stated. Promised: more than 1 million Trainium2 chips by the end of the year. (Announcement · [About Amazon](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster))

**Jul 4, 2025**

The New York Times, reported by The Register: Upwards of 2.2 GW (press report). (Announcement · [The Register](https://www.theregister.com/2025/07/04/project_rainier_deep_dive/))

**Feb 9, 2026**

Anthropic-Amazon New Carlisle: 11 buildings operating, 626 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/anthropic-amazon-new-carlisle/))

**Mar 23, 2026**

Anthropic-Amazon New Carlisle: 16 buildings operating, 910 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/anthropic-amazon-new-carlisle/))

**Jun 3, 2026**

Anthropic-Amazon New Carlisle: 16 buildings operating, 910 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/anthropic-amazon-new-carlisle/))

**Oct 19, 2026**

Anthropic-Amazon New Carlisle: 18 buildings operating, 1,037 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/anthropic-amazon-new-carlisle/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [AWS's Project Rainier: the world's most powerful computer for training AI](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster), About Amazon, Jun 24, 2025

- [Amazon Project Rainier: AI supercomputer for Anthropic](https://www.theregister.com/2025/07/04/project_rainier_deep_dive/), The Register, Jul 4, 2025

- [Anthropic-Amazon New Carlisle on the Power Map](https://siscto.si/power-map/anthropic-amazon-new-carlisle/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW

### Meta Hyperion

Richland Parish, Louisiana

2 GW announced · nothing confirmed

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed