# Stargate Abilene: Announced vs Built | Gigawatt Ledger

> Stargate Abilene in Abilene, Texas: 1.2 GW announced, 1.15 GW confirmed energized as of Nov 1, 2026. Every announcement and the evidence, with sources.

Source: https://siscto.si/ledger/stargate-abilene/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Abilene

Gigawatt Ledger · Energized

# Stargate Abilene, announced against built

Stargate Abilene is an SI compute project in Abilene, Texas, by OpenAI, Oracle and Crusoe. The announced figure is 1.2 GW total power capacity, from Crusoe (Mar 18, 2025). Public evidence puts 1.15 GW in operation as of November 1, 2026, against 1.2 GW announced: 96%. The announcement states total power, so it is set against the power of the whole facility. Its state today: energized.

Announced
:   1.2 GW

Energized
:   1.15 GW (Nov 1, 2026)

State
:   Energized

Source links
:   6

Announced

## What was said, and when

Each row is one public announcement about Stargate Abilene: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Jan 21, 2025**

OpenAI

### [Announcing The Stargate Project](https://openai.com/index/announcing-the-stargate-project/)

OpenAI announces the Stargate Project with SoftBank, Oracle and MGX and says the buildout starts in Texas. No power figure is stated.

> “intends to invest $500 billion over the next four years”

> “The buildout is currently underway, starting in Texas”

Power or capacity stated
:   None stated

Promised
:   $500 billion invested over the next four years

**Mar 18, 2025**

Crusoe

### [Crusoe expands Abilene AI campus to 1.2 GW](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts)

Crusoe says the Abilene campus grows to eight buildings and 1.2 GW of total power capacity.

> “a total power capacity of 1.2 gigawatts (GW)”

> “The initial phase, comprising two buildings at 980,000 square feet and 200+ megawatts”

> “expected to be energized in the first half of 2025”

> “expected to be completed in mid-2026”

Power or capacity stated
:   1.2 GW total power capacity (first phase: 200+ MW)

Promised
:   First two buildings energized in the first half of 2025; six more buildings completed in mid-2026

**Sep 23, 2025**

OpenAI, Oracle and SoftBank

### [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/)

OpenAI names five more Stargate sites and says a further 600 MW could be added near the Abilene flagship.

> “brings Stargate to nearly 7 gigawatts of planned capacity”

> “an additional potential expansion of 600 megawatts near the flagship Stargate site”

Power or capacity stated
:   Potential expansion of 600 MW near the flagship site

Promised
:   None stated

**Mar 27, 2026**

Crusoe

### [Crusoe builds 900 MW Abilene campus for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)

In a release about a second Abilene campus, Crusoe restates the first campus at 1.2 GW and gives a new date for its second phase.

> “to bring total campus capacity to 1.2 GW”

> “is expected to reach completion by the end of 2026”

Power or capacity stated
:   1.2 GW total campus capacity

Promised
:   Second phase complete by the end of 2026

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Public evidence puts 1.15 GW in operation as of November 1, 2026, against 1.2 GW announced: 96%. The announcement states total power, so it is set against the power of the whole facility.

**Nov 1, 2026**

Epoch AI · Power Map

### OpenAI Stargate Abilene on the Power Map

Epoch AI counts 8 buildings operating at OpenAI Stargate Abilene and estimates 824 MW of IT power (1,154 MW for the whole facility) as of November 1, 2026.

> Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests Building 8 will be operational by early November, 7 months after March 24. Oracle gave no date for the last two buildings on its September 10 call.

IT power running
:   824 MW

Whole facility
:   1,154 MW

**Nov 11, 2026**

Mortenson

### [Abilene AI Data Center & Power Delivery](https://www.mortenson.com/projects/abilene-data-center-development)

The power contractor says the 1 GW, 345 kV substation for the second phase was fully energized by March 10, 2026.

> “construction of a 12.5-acre, 1 GW, 345 kV greenfield substation”

> “fully energized by March 10, 2026”

Power confirmed
:   No figure stated

Used in the total
:   No, shown as history

Crusoe first said the six buildings of the second phase were expected to be completed in mid-2026. Its March 27, 2026 release says the second phase is expected to reach completion by the end of 2026.

Seen from orbit · Compute Watch

### The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-abilene/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Jan 21, 2025**

OpenAI: no power figure stated. Promised: $500 billion invested over the next four years. (Announcement · [OpenAI](https://openai.com/index/announcing-the-stargate-project/))

**Mar 18, 2025**

Crusoe: 1.2 GW total power capacity (first phase: 200+ MW). Promised: first two buildings energized in the first half of 2025; six more buildings completed in mid-2026. (Announcement · [Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts))

**Sep 23, 2025**

OpenAI, Oracle and SoftBank: Potential expansion of 600 MW near the flagship site. (Announcement · [OpenAI](https://openai.com/index/five-new-stargate-sites/))

**Mar 27, 2026**

Crusoe: 1.2 GW total campus capacity. Promised: second phase complete by the end of 2026. (Announcement · [Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))

**May 23, 2026**

OpenAI Stargate Abilene: 4 buildings operating, 412 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-abilene/))

**Jul 28, 2026**

OpenAI Stargate Abilene: 4 buildings operating, 412 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-abilene/))

**Sep 10, 2026**

OpenAI Stargate Abilene: 6 buildings operating, 618 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-abilene/))

**Nov 1, 2026**

OpenAI Stargate Abilene: 8 buildings operating, 824 MW of IT power. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-abilene/))

**Nov 11, 2026**

The power contractor says the 1 GW, 345 kV substation for the second phase was fully energized by March 10, 2026. (Evidence · [Mortenson](https://www.mortenson.com/projects/abilene-data-center-development), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Announcing The Stargate Project](https://openai.com/index/announcing-the-stargate-project/), OpenAI, Jan 21, 2025

- [Crusoe expands Abilene AI campus to 1.2 GW](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), Crusoe, Mar 18, 2025

- [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/), OpenAI, Sep 23, 2025

- [Crusoe builds 900 MW Abilene campus for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), Crusoe, Mar 27, 2026

- [Abilene AI Data Center & Power Delivery](https://www.mortenson.com/projects/abilene-data-center-development), Mortenson, Nov 11, 2026 (undated page, read on this date)

- [OpenAI Stargate Abilene on the Power Map](https://siscto.si/power-map/openai-stargate-abilene/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Milam County

Milam County, Texas

1.2 GW announced · nothing confirmed