# Stargate Lordstown: Announced vs Built | Gigawatt Ledger

> Stargate Lordstown in Lordstown, Ohio: no power figure stated, and nothing confirmed energized as of Jul 30, 2026. Announcements, evidence and sources.

Source: https://siscto.si/ledger/stargate-lordstown/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Lordstown

Gigawatt Ledger · Under construction

# Stargate Lordstown, announced against built

Stargate Lordstown is an SI compute project in Lordstown, Ohio, by OpenAI and SoftBank. No source states a power figure for this project alone, so it is not in the Ledger's total. Epoch AI tracks the site as under construction, with no building operating as of July 30, 2026. Its state today: under construction.

Announced
:   Not stated

Energized
:   None (Jul 30, 2026)

State
:   Under construction

Source links
:   2

Announced

## What was said, and when

Each row is one public announcement about Stargate Lordstown: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank

### [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/)

OpenAI names Lordstown, Ohio as a SoftBank site. The power figure covers Lordstown and Milam County together, so no figure is counted for Lordstown alone.

> “can scale to 1.5 gigawatts over the next 18 months”

> “on track to be operational next year”

Power or capacity stated
:   1.5 GW for Lordstown and Milam County together, as a "can scale to" figure

Promised
:   Operational in 2026

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of July 30, 2026.

**Jul 30, 2026**

Epoch AI · Power Map

### OpenAI Stargate Lordstown on the Power Map

Epoch AI tracks OpenAI Stargate Lordstown as under construction: no building is operating as of July 30, 2026.

> Active construction visible on and around the datacenter, with the roofing mostly in place. This is based on satellite imagery. No buildings operational yet.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 214 MW of IT power by March 1, 2027. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.2 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-lordstown/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank: 1.5 GW for Lordstown and Milam County together, as a "can scale to" figure. Promised: operational in 2026. (Announcement · [OpenAI](https://openai.com/index/five-new-stargate-sites/))

**Oct 12, 2025**

OpenAI Stargate Lordstown: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-lordstown/))

**Feb 27, 2026**

OpenAI Stargate Lordstown: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-lordstown/))

**Jul 30, 2026**

OpenAI Stargate Lordstown: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-lordstown/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/), OpenAI, Sep 23, 2025

- [OpenAI Stargate Lordstown on the Power Map](https://siscto.si/power-map/openai-stargate-lordstown/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW