# Stargate Michigan (Saline Township): Announced vs Built

> Stargate Michigan (Saline Township) in Saline Township, Michigan: 1.38 GW announced, nothing confirmed energized as of Mar 12, 2026. With every source.

Source: https://siscto.si/ledger/stargate-michigan/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Michigan

Gigawatt Ledger · Under construction

# Stargate Michigan, announced against built

Stargate Michigan (Saline Township) is an SI compute project in Saline Township, Michigan, by OpenAI, Oracle and Related Digital. The announced figure is 1,383 MW data center, from Michigan Public Service Commission (Dec 18, 2025). Epoch AI tracks the site as under construction, with no building operating as of March 12, 2026. Its state today: under construction.

Announced
:   1.38 GW

Energized
:   None (Mar 12, 2026)

State
:   Under construction

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Stargate Michigan: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Dec 18, 2025**

Michigan Public Service Commission

### [MPSC approves DTE Electric energy contracts for data center with conditions to strengthen protections for other customers](https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center)

The state regulator approves DTE Electric's contracts for the data center and states its size. The customer is Green Chile Ventures LLC, a subsidiary of Oracle.

> “the 1,383- megawatt (MW) data center in Saline Township”

> “develop 1,383 MW of energy storage facilities to match the data center's contracted demand”

Power or capacity stated
:   1,383 MW data center (contracted demand)

Promised
:   None stated

**Nov 11, 2026**

Related Digital

### [Vertically integrated data center development](https://www.related-digital.com/michigan)

The developer's page for the Saline Township campus.

> “will deliver over 1 GW of capacity”

Power or capacity stated
:   Over 1 GW of capacity

Promised
:   None stated

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of March 12, 2026.

**Mar 12, 2026**

Epoch AI · Power Map

### OpenAI Stargate Michigan on the Power Map

Epoch AI tracks OpenAI Stargate Michigan as under construction: no building is operating as of March 12, 2026.

> Groundwork is visible for Building 1, at the left end of the site.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 988 MW of IT power by December 31, 2028. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.8 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-michigan/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Dec 4, 2025**

OpenAI Stargate Michigan: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-michigan/))

**Dec 18, 2025**

Michigan Public Service Commission: 1,383 MW data center (contracted demand). (Announcement · [State of Michigan](https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center))

**Jan 20, 2026**

OpenAI Stargate Michigan: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-michigan/))

**Mar 12, 2026**

OpenAI Stargate Michigan: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-michigan/))

**Nov 11, 2026**

Related Digital: Over 1 GW of capacity. (Announcement · [Related Digital](https://www.related-digital.com/michigan), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Vertically integrated data center development](https://www.related-digital.com/michigan), Related Digital, Nov 11, 2026 (undated page, read on this date)

- [MPSC approves DTE Electric energy contracts for data center with conditions to strengthen protections for other customers](https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center), State of Michigan, Dec 18, 2025

- [OpenAI Stargate Michigan on the Power Map](https://siscto.si/power-map/openai-stargate-michigan/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW

### Stargate Milam County

Milam County, Texas

1.2 GW announced · nothing confirmed