# Stargate Milam County, announced against built

Stargate Milam County is an SI compute project in Milam County, Texas, by OpenAI, SoftBank and SB Energy. The announced figure is 1.2 GW data center site, from SB Energy (Mar 19, 2026). Epoch AI tracks the site as under construction, with no building operating as of March 23, 2026. Its state today: under construction.

Announced
:   1.2 GW

Energized
:   None (Mar 23, 2026)

State
:   Under construction

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Stargate Milam County: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank

### [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/)

OpenAI names Milam County, Texas as a site built with SB Energy, a SoftBank Group company.

> “can scale to 1.5 gigawatts over the next 18 months”

Power or capacity stated
:   1.5 GW for Lordstown and Milam County together, as a "can scale to" figure

Promised
:   Over the next 18 months

**Mar 19, 2026**

SB Energy

### [OpenAI and SoftBank Group Partner with SB Energy](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/)

SB Energy says OpenAI signed a 1.2 GW data center lease and chose SB Energy to build and operate the Milam County site.

> “OpenAI signs 1.2 GW data center lease for initial data center buildout”

> “1.2 GW data center site in Milam County”

Power or capacity stated
:   1.2 GW data center lease

Promised
:   None stated

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of March 23, 2026.

**Mar 23, 2026**

Epoch AI · Power Map

### OpenAI Stargate Milam on the Power Map

Epoch AI tracks OpenAI Stargate Milam as under construction: no building is operating as of March 23, 2026.

> Steel framing and roofing is underway for Building 1.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 857 MW of IT power by December 31, 2028. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-milam/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank: 1.5 GW for Lordstown and Milam County together, as a "can scale to" figure. Promised: over the next 18 months. (Announcement · [OpenAI](https://openai.com/index/five-new-stargate-sites/))

**Sep 27, 2025**

OpenAI Stargate Milam: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-milam/))

**Jan 4, 2026**

OpenAI Stargate Milam: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-milam/))

**Mar 19, 2026**

SB Energy: 1.2 GW data center lease. (Announcement · [SB Energy](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/))

**Mar 23, 2026**

OpenAI Stargate Milam: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-milam/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/), OpenAI, Sep 23, 2025

- [OpenAI and SoftBank Group Partner with SB Energy](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/), SB Energy, Mar 19, 2026

- [OpenAI Stargate Milam on the Power Map](https://siscto.si/power-map/openai-stargate-milam/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW