> Stargate Norway (Narvik) in Narvik, Norway: 230 MW announced, nothing confirmed energized as of Jul 5, 2026. Every announcement and the evidence, with sources.

Source: https://siscto.si/ledger/stargate-norway-narvik/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Norway

Gigawatt Ledger · Under construction

# Stargate Norway, announced against built

Stargate Norway (Narvik) is an SI compute project in Narvik, Nordland, Norway, by Nscale, Aker, OpenAI and Microsoft. The announced figure is 230 MW campus, from Nscale (Apr 14, 2026). Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026. Its state today: under construction.

Announced
:   230 MW

Energized
:   None (Jul 5, 2026)

State
:   Under construction

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Stargate Norway: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Aug 14, 2025**

Nscale

### [Stargate Norway: Laying the foundation for the future of AI](https://www.nscale.com/blog/stargate-norway-laying-the-foundation-for-the-future-of-ai)

Nscale describes Stargate Norway, a joint venture with Aker, with OpenAI as a partner.

> “230MW of initial capacity powered by renewable hydropower”

> “ambitions to scale by an additional 290MW”

> “will target to deliver 100,000 NVIDIA GPUs”

Power or capacity stated
:   230 MW initial capacity; ambition for 290 MW more

Promised
:   None stated

**Apr 14, 2026**

Nscale

### [Nscale announces expanded deal with Microsoft in Norway](https://www.nscale.com/press-releases/nscale-microsoft-norway)

Nscale expands its Microsoft deal at the Narvik campus and says it will manage the campus alone.

> “230 MW Nscale Narvik campus”

> “will add more than 30,000 NVIDIA Rubin GPUs in deployment”

> “deliver even more high-performance AI compute capacity in Norway in 2027”

Power or capacity stated
:   230 MW campus

Promised
:   More capacity in 2027

The larger figure, 230 MW with ambitions for 290 MW more (Nscale, Aug 14, 2025), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026.

**Jul 5, 2026**

Epoch AI · Power Map

### Microsoft Narvik Norway on the Power Map

Epoch AI tracks Microsoft Narvik Norway as under construction: no building is operating as of July 5, 2026.

> Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 92 MW of IT power by December 31, 2026. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/microsoft-narvik-norway/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Jun 27, 2025**

Microsoft Narvik Norway: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-narvik-norway/))

**Aug 1, 2025**

Microsoft Narvik Norway: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-narvik-norway/))

**Aug 14, 2025**

Nscale: 230 MW initial capacity; ambition for 290 MW more. (Announcement · [Nscale](https://www.nscale.com/blog/stargate-norway-laying-the-foundation-for-the-future-of-ai))

**Apr 14, 2026**

Nscale: 230 MW campus. Promised: more capacity in 2027. (Announcement · [Nscale](https://www.nscale.com/press-releases/nscale-microsoft-norway))

**May 31, 2026**

Microsoft Narvik Norway: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-narvik-norway/))

**Jul 5, 2026**

Microsoft Narvik Norway: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/microsoft-narvik-norway/))

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [Stargate Norway: Laying the foundation for the future of AI](https://www.nscale.com/blog/stargate-norway-laying-the-foundation-for-the-future-of-ai), Nscale, Aug 14, 2025

- [Nscale announces expanded deal with Microsoft in Norway](https://www.nscale.com/press-releases/nscale-microsoft-norway), Nscale, Apr 14, 2026

- [Microsoft Narvik Norway on the Power Map](https://siscto.si/power-map/microsoft-narvik-norway/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Colossus (Memphis and Southaven)

Memphis, Tennessee

2 GW announced · 1 to 1.7 GW

### Meta Hyperion

Richland Parish, Louisiana

2 GW announced · nothing confirmed

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed