# Stargate Wisconsin: Announced vs Built | $SIS

> Stargate Wisconsin (Port Washington, Lighthouse) in Port Washington, Wisconsin: 902 MW announced, nothing confirmed energized as of Jul 24, 2026. Sourced.

Source: https://siscto.si/ledger/stargate-port-washington/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Wisconsin

Gigawatt Ledger · Under construction

# Stargate Wisconsin, announced against built

Stargate Wisconsin (Port Washington, Lighthouse) is an SI compute project in Port Washington, Wisconsin, by OpenAI, Oracle and Vantage Data Centers. The announced figure is 902 MW across four data centers, from Vantage Data Centers (Nov 11, 2026 (undated page, read on this date)). Epoch AI tracks the site as under construction, with no building operating as of July 24, 2026. Its state today: under construction.

Announced
:   902 MW

Energized
:   None (Jul 24, 2026)

State
:   Under construction

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Stargate Wisconsin: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank

### [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/)

OpenAI announces a Midwest site with Oracle. An update on the same page dated October 22, 2025 places it in Wisconsin, developed with Vantage.

> “can deliver over 5.5 gigawatts of capacity”

> “which we expect to announce soon”

Power or capacity stated
:   Over 5.5 GW for three Oracle sites and an Abilene expansion together

Promised
:   None stated

**Nov 11, 2026**

Vantage Data Centers

### [Port Washington (Lighthouse) Data Center Campus](https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin)

The developer's campus page states the capacity of the four data centers, labeled as critical IT load, and the completion year.

> “totaling 902MW across 2.5 million square feet.”

> “is scheduled to be completed in 2028.”

Power or capacity stated
:   902 MW of critical IT load across four data centers

Promised
:   Completed in 2028

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of July 24, 2026.

**Jul 24, 2026**

Epoch AI · Power Map

### OpenAI Stargate Wisconsin on the Power Map

Epoch AI tracks OpenAI Stargate Wisconsin as under construction: no building is operating as of July 24, 2026.

> Construction continues, Buildings 1 and 2 appear roughly halfway roofed, and building 3 foundation is halfway done.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 902 MW of IT power by December 31, 2028. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-wisconsin/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank: Over 5.5 GW for three Oracle sites and an Abilene expansion together. (Announcement · [OpenAI](https://openai.com/index/five-new-stargate-sites/))

**Jan 2, 2026**

OpenAI Stargate Wisconsin: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-wisconsin/))

**Feb 14, 2026**

OpenAI Stargate Wisconsin: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-wisconsin/))

**Jul 24, 2026**

OpenAI Stargate Wisconsin: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-wisconsin/))

**Nov 11, 2026**

Vantage Data Centers: 902 MW of critical IT load across four data centers. Promised: completed in 2028. (Announcement · [Vantage Data Centers](https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/), OpenAI, Sep 23, 2025

- [Port Washington (Lighthouse) Data Center Campus](https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin), Vantage Data Centers, Nov 11, 2026 (undated page, read on this date)

- [OpenAI Stargate Wisconsin on the Power Map](https://siscto.si/power-map/openai-stargate-wisconsin/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW