# Stargate Shackelford County (Frontier): Announced vs Built

> Stargate Shackelford County (Frontier) in Shackelford County, Texas: 1.4 GW announced, nothing confirmed energized as of Sep 4, 2026. With every source.

Source: https://siscto.si/ledger/stargate-shackelford-county/
Updated: 2026-11-11

1. [Home](https://siscto.si/)
2. [Gigawatt Ledger](https://siscto.si/ledger/)
3. Stargate Shackelford County

Gigawatt Ledger · Under construction

# Stargate Shackelford County, announced against built

Stargate Shackelford County (Frontier) is an SI compute project in Shackelford County, Texas, by OpenAI, Oracle and Vantage Data Centers. The announced figure is 1.4 GW of critical IT capacity, from Vantage Data Centers (Nov 11, 2026 (undated page, read on this date)). Epoch AI tracks the site as under construction, with no building operating as of September 4, 2026. Its state today: under construction.

Announced
:   1.4 GW

Energized
:   None (Sep 4, 2026)

State
:   Under construction

Source links
:   3

Announced

## What was said, and when

Each row is one public announcement about Stargate Shackelford County: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**Sep 23, 2025**

OpenAI, Oracle and SoftBank

### [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/)

OpenAI names Shackelford County, Texas as one of three new sites built with Oracle. The power figure covers the three Oracle sites and an Abilene expansion together.

> “can deliver over 5.5 gigawatts of capacity”

Power or capacity stated
:   Over 5.5 GW for three Oracle sites and an Abilene expansion together

Promised
:   None stated

**Nov 11, 2026**

Vantage Data Centers

### [Shackelford County (Frontier)](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx)

The developer's campus page states the capacity, the number of buildings and the date of the first one.

> “deliver 1.4GW of critical IT capacity across 10 single-story data centers”

> “The first data center is scheduled for delivery in the second half of 2026.”

Power or capacity stated
:   1.4 GW of critical IT capacity across 10 data centers

Promised
:   First data center delivered in the second half of 2026

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of September 4, 2026.

**Sep 4, 2026**

Epoch AI · Power Map

### OpenAI Stargate Shackelford on the Power Map

Epoch AI tracks OpenAI Stargate Shackelford as under construction: no building is operating as of September 4, 2026.

> Buildings 1-5 shells complete and fully roofed. Buildings 1-3 appear to be actively installing cooling and backup generators nearby. The pads for Buildings 6-10 to the north have also been visibly cleared, with foundations for Buildings 6 and 7 underway.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 1,400 MW of IT power by November 11, 2028. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-shackelford/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**Aug 1, 2025**

OpenAI Stargate Shackelford: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-shackelford/))

**Sep 23, 2025**

OpenAI, Oracle and SoftBank: Over 5.5 GW for three Oracle sites and an Abilene expansion together. (Announcement · [OpenAI](https://openai.com/index/five-new-stargate-sites/))

**Jan 18, 2026**

OpenAI Stargate Shackelford: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-shackelford/))

**Apr 14, 2026**

OpenAI Stargate Shackelford: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-shackelford/))

**Sep 4, 2026**

OpenAI Stargate Shackelford: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-shackelford/))

**Nov 11, 2026**

Vantage Data Centers: 1.4 GW of critical IT capacity across 10 data centers. Promised: first data center delivered in the second half of 2026. (Announcement · [Vantage Data Centers](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites](https://openai.com/index/five-new-stargate-sites/), OpenAI, Sep 23, 2025

- [Shackelford County (Frontier)](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx), Vantage Data Centers, Nov 11, 2026 (undated page, read on this date)

- [OpenAI Stargate Shackelford on the Power Map](https://siscto.si/power-map/openai-stargate-shackelford/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW

### Stargate Milam County

Milam County, Texas

1.2 GW announced · nothing confirmed