# Stargate UAE, announced against built

Stargate UAE is an SI compute project in Abu Dhabi, United Arab Emirates, by OpenAI, G42 and Oracle. The announced figure is 1 GW cluster, from OpenAI (Nov 11, 2026 (undated page, read on this date)). Epoch AI tracks the site as under construction, with no building operating as of November 16, 2025. Its state today: under construction.

Announced
:   1 GW

Energized
:   None (Nov 16, 2025)

State
:   Under construction

Source links
:   4

Announced

## What was said, and when

Each row is one public announcement about Stargate UAE: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

**May 22, 2025**

OpenAI, reported by TechCrunch

### [OpenAI teams up with Cisco, Oracle to build UAE data center](https://techcrunch.com/2025/05/22/openai-teams-up-with-cisco-oracle-to-build-uae-data-center)

TechCrunch reports the announcement on the day it was made, with G42, Oracle, Nvidia, Cisco and SoftBank as partners.

> “which will bring a 1GW data center cluster to Abu Dhabi”

> “OpenAI expects 200MW will go live in 2026.”

Power or capacity stated
:   1 GW cluster; 200 MW first

Promised
:   200 MW live in 2026

**Oct 16, 2025**

Khazna Data Centers, reported by Khaleej Times

### [Watch: 3,500 people work on Stargate UAE as phase 1 set to be done in 2 years](https://www.khaleejtimes.com/uae/stargate-uae-phase-1-in-two-years)

Khazna executives describe construction on site and repeat the first delivery date.

> “Stargate UAE is a 1-gigawatt compute cluster”

> “200MW of the 1GW project is scheduled to be delivered in 2026”

> “There's about 3,500 workforce on site already.”

Power or capacity stated
:   1 GW cluster; 200 MW first

Promised
:   200 MW delivered in 2026

**Nov 11, 2026**

OpenAI

### [Introducing Stargate UAE](https://openai.com/index/introducing-stargate-uae)

OpenAI's own page for the project.

> “A 1GW Stargate UAE cluster in Abu Dhabi”

> “200MW expected to go live in 2026”

Power or capacity stated
:   1 GW cluster; 200 MW first

Promised
:   200 MW live in 2026

Built

## What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Epoch AI tracks the site as under construction, with no building operating as of November 16, 2025.

**Nov 16, 2025**

Epoch AI · Power Map

### OpenAI Stargate UAE on the Power Map

Epoch AI tracks OpenAI Stargate UAE as under construction: no building is operating as of November 16, 2025.

> Building 1 and 2 are partly constructed. No clear evidence of more buildings starting construction.

IT power running
:   None

Whole facility
:   None

Epoch AI projects 1,000 MW of IT power by January 1, 2028. A projection, not a fact yet.

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-uae/)

## Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

**May 22, 2025**

OpenAI, reported by TechCrunch: 1 GW cluster; 200 MW first. Promised: 200 MW live in 2026. (Announcement · [TechCrunch](https://techcrunch.com/2025/05/22/openai-teams-up-with-cisco-oracle-to-build-uae-data-center))

**Jun 9, 2025**

OpenAI Stargate UAE: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-uae/))

**Oct 16, 2025**

Khazna Data Centers, reported by Khaleej Times: 1 GW cluster; 200 MW first. Promised: 200 MW delivered in 2026. (Announcement · [Khaleej Times](https://www.khaleejtimes.com/uae/stargate-uae-phase-1-in-two-years))

**Nov 16, 2025**

OpenAI Stargate UAE: 0 buildings operating, no IT power yet. (Evidence · [Epoch AI, on the Power Map](https://siscto.si/power-map/openai-stargate-uae/))

**Nov 11, 2026**

OpenAI: 1 GW cluster; 200 MW first. Promised: 200 MW live in 2026. (Announcement · [OpenAI](https://openai.com/index/introducing-stargate-uae), undated page read on this date)

Corrections

## See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

### File a correction

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

Sources

## Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.

- [OpenAI teams up with Cisco, Oracle to build UAE data center](https://techcrunch.com/2025/05/22/openai-teams-up-with-cisco-oracle-to-build-uae-data-center), TechCrunch, May 22, 2025

- [Introducing Stargate UAE](https://openai.com/index/introducing-stargate-uae), OpenAI, Nov 11, 2026 (undated page, read on this date)

- [Watch: 3,500 people work on Stargate UAE as phase 1 set to be done in 2 years](https://www.khaleejtimes.com/uae/stargate-uae-phase-1-in-two-years), Khaleej Times, Oct 16, 2025

- [OpenAI Stargate UAE on the Power Map](https://siscto.si/power-map/openai-stargate-uae/), from [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers" (CC BY 4.0), retrieved November 10, 2026

More projects

## Keep reading the Ledger

Three more projects, the same operator first.

[The whole Ledger](https://siscto.si/ledger/)

### Stargate Shackelford County (Frontier)

Shackelford County, Texas

1.4 GW announced · nothing confirmed

### Stargate Michigan (Saline Township)

Saline Township, Michigan

1.38 GW announced · nothing confirmed

### Stargate Abilene

Abilene, Texas

1.2 GW announced · 1.15 GW