# SI Data Centers in Nevada: Sites, Prices, Bills | $SIS

> 1 SI data center in Nevada, home power at 12.72 cents per kWh (up 1.4% in a year), grid operators and sourced facts on what data centers add to bills. Free.

Source: https://siscto.si/next-door/nevada/
Updated: 2026-11-17

1. [Home](https://siscto.si/)
2. [SI Next Door](https://siscto.si/next-door/)
3. Nevada

SI Next Door · Nevada

# SI data centers in Nevada

Nevada has 1 SI data center on the Power Map, with 161 MW of IT power running per Epoch AI. Homes paid an average of 12.72 cents per kWh in August 2026, up 1.4% from a year before and up 15.8% from five years before (EIA). No ISO or RTO runs a wholesale power market across Nevada: its utilities trade power mostly through bilateral contracts, the way much of the Southeast and the West do.

SI data centers
:   1

Being built
:   0

IT power running
:   161 MW

Home price ¢/kWh
:   12.72

Near you

## Look up your ZIP code

The full answer for one ZIP code: the sites nearest you, what is being built, hearings, prices and alerts. Your ZIP code stays in your browser.

On the Power Map

## SI data centers in Nevada

Each site with its status and the IT power running, from Epoch AI's public tracker read November 10, 2026, and the Gigawatt Ledger's announced and confirmed figures where it has them.

[The Power Map](https://siscto.si/power-map/)

Operating, expanding

Clark, Nevada · Google

161 MW of IT power running as of Apr 13, 2026

Running 161 MWPlanned 300 MWEpoch AI

[Site page](https://siscto.si/power-map/google-storey-county/)[Heat Watch +1.4 °C](https://siscto.si/heat-watch/google-storey-county/)

Power prices

## What homes in Nevada pay

Homes paid an average of 12.72 cents per kWh in August 2026, up 1.4% from a year before and up 15.8% from five years before (EIA).

Average residential price, cents per kWh, by month. Source: U.S. Energy Information Administration (series ELEC.PRICE.NV-RES.M), through August 2026, published October 22, 2026.

Grid and bills

## Nevada's grid, and what data centers add

Only figures a market monitor, a state commission or a utility filing published, each with its link and date. They describe a grid region, not one home.

No ISO or RTO runs a wholesale power market across Nevada: its utilities trade power mostly through bilateral contracts, the way much of the Southeast and the West do. Sources: [Wikipedia, Regional transmission organization (North America) (revision of Oct 26, 2026)](https://en.wikipedia.org/wiki/Regional_transmission_organization_(North_America)), read November 17, 2026.

No market monitor, state commission or utility filing that puts a number on what data center demand adds to power costs in Nevada has been read and verified for this page yet, so none is shown. Nationally, [Pew Research Center](https://www.pewresearch.org/short-reads/2026/05/06/many-americans-hold-utility-companies-responsible-for-their-rising-home-energy-bills/) found in 2026 that 43% of the US adults whose energy costs went up call data centers a major reason.

Neighbor reports

## Hearings, proposals and sightings in Nevada

Filed by neighbors with an SI Passport, approved by the team against a public source, and sealed on Solana.

[Report something](https://siscto.si/next-door/#report)

- Loading the approved reports.

[Every upcoming hearing in Nevada as a calendar file](https://sicto.si/api/sis-nextdoor.php?a=ics&state=NV)

Questions

## Nevada, answered

The short version, with the sources.

[How SI Next Door works](https://siscto.si/next-door/method/)

### How many SI data centers are in Nevada?

Nevada has 1 SI data center on the Power Map, with 161 MW of IT power running per Epoch AI. The list comes from the [Power Map](https://siscto.si/power-map/), which draws on Epoch AI's public tracker.

### How much does electricity cost for homes in Nevada?

Homes paid an average of 12.72 cents per kWh in August 2026, up 1.4% from a year before and up 15.8% from five years before (EIA). The series is the U.S. Energy Information Administration's average residential price, published October 22, 2026.

### Are data centers raising power bills in Nevada?

No source this page could verify has put a number on it for Nevada. SI Next Door shows only figures a market monitor, a state commission or a utility filing published, with the link and the date.

Join the takeover

## Know what is coming to your town

Look up your ZIP code, follow it on Telegram and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)
