# SI data centers in Ohio

Ohio has 7 SI data centers on the Power Map, 2 of them under construction, with 1.46 GW of IT power running per Epoch AI. Homes paid an average of 19.38 cents per kWh in August 2026, up 10.4% from a year before and up 48.7% from five years before (EIA). Grid operators in Ohio: PJM Interconnection (all or part of the state).

SI data centers
:   7

Being built
:   2

IT power running
:   1,457 MW

Home price ¢/kWh
:   19.38

Near you

## Look up your ZIP code

The full answer for one ZIP code: the sites nearest you, what is being built, hearings, prices and alerts. Your ZIP code stays in your browser.

On the Power Map

## SI data centers in Ohio

Each site with its status and the IT power running, from Epoch AI's public tracker read November 10, 2026, and the Gigawatt Ledger's announced and confirmed figures where it has them.

[The Power Map](https://siscto.si/power-map/)

Operating, expanding

New Albany, Ohio · Meta

471 MW of IT power running as of Aug 31, 2026

Announced 1 GWConfirmed energized 471 to 612 MW[Ledger](https://siscto.si/ledger/meta-prometheus/)

[Site page](https://siscto.si/power-map/meta-prometheus/)[Heat Watch +2.3 °C](https://siscto.si/heat-watch/meta-prometheus/)

Operating

New Albany, Ohio · Google

333 MW of IT power running as of May 18, 2026

[Site page](https://siscto.si/power-map/google-new-albany/)[Heat Watch -0.6 °C](https://siscto.si/heat-watch/google-new-albany/)

Operating, expanding

Columbus, Ohio · Google

303 MW of IT power running as of Aug 5, 2026

Running 303 MWPlanned 386 MWEpoch AI

[Site page](https://siscto.si/power-map/google-columbus/)[Heat Watch -2.6 °C](https://siscto.si/heat-watch/google-columbus/)

Operating, expanding

New Albany, Ohio · Amazon

213 MW of IT power running as of May 18, 2026

Running 213 MWPlanned 338 MWEpoch AI

[Site page](https://siscto.si/power-map/aws-new-albany/)[Heat Watch +1.3 °C](https://siscto.si/heat-watch/aws-new-albany/)

Operating

Lancaster, Ohio · Google

137 MW of IT power running as of Mar 12, 2026

[Site page](https://siscto.si/power-map/google-lancaster/)[Heat Watch -0.3 °C](https://siscto.si/heat-watch/google-lancaster/)

Under construction

Bowling Green, Ohio · Meta

No building running yet as of Jul 30, 2026

Running none yetPlanned 422 MWEpoch AI

[Site page](https://siscto.si/power-map/meta-bowling-green/)[Heat Watch +0.4 °C](https://siscto.si/heat-watch/meta-bowling-green/)

Under construction

Lordstown, Ohio · Softbank

No building running yet as of Jul 30, 2026

Announced not statedConfirmed energized none yet[Ledger](https://siscto.si/ledger/stargate-lordstown/)

[Site page](https://siscto.si/power-map/openai-stargate-lordstown/)[Heat Watch +2.2 °C](https://siscto.si/heat-watch/openai-stargate-lordstown/)

Power prices

## What homes in Ohio pay

Homes paid an average of 19.38 cents per kWh in August 2026, up 10.4% from a year before and up 48.7% from five years before (EIA).

Average residential price, cents per kWh, by month. Source: U.S. Energy Information Administration (series ELEC.PRICE.OH-RES.M), through August 2026, published October 22, 2026.

Grid and bills

## Ohio's grid, and what data centers add

Only figures a market monitor, a state commission or a utility filing published, each with its link and date. They describe a grid region, not one home.

Grid operators in Ohio: PJM Interconnection (all or part of the state). Sources: [PJM, Territory Served](https://www.pjm.com/about-pjm/who-we-are/territory-served), read November 17, 2026.

+$9.95/MWh

PJM's independent market monitor found that in the first nine months of 2026 the total cost of wholesale power rose by $9.95 per MWh (9.8%), from $101.66 to $111.61, as a result of including data center load in the capacity market. That is about 1 cent per kWh of wholesale power; how much of it reaches a home bill depends on each utility and state. [Monitoring Analytics, Market Monitor Report to the PJM Members Committee](https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-item-04---market-monitoring-report---presentation.pdf), Oct 28, 2026.

+76%

The total cost of wholesale power in PJM was $136.53 per MWh in the first quarter of 2026, up from $77.78 a year before, almost 76%, per the market monitor. The report put the data center load in PJM's last two capacity auctions at a $13 billion cost increase for customers. PJM covers more than 67 million people in all or part of 13 states and DC. [E&E News, "Data centers drive 76% surge in PJM power prices"](https://www.eenews.net/articles/data-centers-drive-76-surge-in-pjm-power-prices/), May 15, 2026.

Neighbor reports

## Hearings, proposals and sightings in Ohio

Filed by neighbors with an SI Passport, approved by the team against a public source, and sealed on Solana.

[Report something](https://siscto.si/next-door/#report)

- Loading the approved reports.

[Every upcoming hearing in Ohio as a calendar file](https://sicto.si/api/sis-nextdoor.php?a=ics&state=OH)

Questions

## Ohio, answered

The short version, with the sources.

[How SI Next Door works](https://siscto.si/next-door/method/)

### How many SI data centers are in Ohio?

Ohio has 7 SI data centers on the Power Map, 2 of them under construction, with 1.46 GW of IT power running per Epoch AI. The list comes from the [Power Map](https://siscto.si/power-map/), which draws on Epoch AI's public tracker.

### How much does electricity cost for homes in Ohio?

Homes paid an average of 19.38 cents per kWh in August 2026, up 10.4% from a year before and up 48.7% from five years before (EIA). The series is the U.S. Energy Information Administration's average residential price, published October 22, 2026.

### Are data centers raising power bills in Ohio?

Published figures cover the grid, not single homes. PJM's independent market monitor found that in the first nine months of 2026 the total cost of wholesale power rose by $9.95 per MWh (9.8%), from $101.66 to $111.61, as a result of including data center load in the capacity market. That is about 1 cent per kWh of wholesale power; how much of it reaches a home bill depends on each utility and state. [Monitoring Analytics, Market Monitor Report to the PJM Members Committee](https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-item-04---market-monitoring-report---presentation.pdf), Oct 28, 2026. The total cost of wholesale power in PJM was $136.53 per MWh in the first quarter of 2026, up from $77.78 a year before, almost 76%, per the market monitor. The report put the data center load in PJM's last two capacity auctions at a $13 billion cost increase for customers. PJM covers more than 67 million people in all or part of 13 states and DC. [E&E News, "Data centers drive 76% surge in PJM power prices"](https://www.eenews.net/articles/data-centers-drive-76-surge-in-pjm-power-prices/), May 15, 2026.

Join the takeover

## Know what is coming to your town

Look up your ZIP code, follow it on Telegram and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)