# SI data centers in Texas

Texas has 14 SI data centers on the Power Map, 5 of them under construction, with 1.73 GW of IT power running per Epoch AI. Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA). Grid operators in Texas: ERCOT (about 90% of the state's electric load); MISO (all or part of the state); Southwest Power Pool (part of the state).

SI data centers
:   14

Being built
:   5

IT power running
:   1,730 MW

Home price ¢/kWh
:   15.91

Near you

## Look up your ZIP code

The full answer for one ZIP code: the sites nearest you, what is being built, hearings, prices and alerts. Your ZIP code stays in your browser.

On the Power Map

## SI data centers in Texas

Each site with its status and the IT power running, from Epoch AI's public tracker read November 10, 2026, and the Gigawatt Ledger's announced and confirmed figures where it has them.

[The Power Map](https://siscto.si/power-map/)

Operating

Abilene, Texas · Oracle

824 MW of IT power running as of Nov 1, 2026

Announced 1.2 GWConfirmed energized 1.15 GW[Ledger](https://siscto.si/ledger/stargate-abilene/)

[Site page](https://siscto.si/power-map/openai-stargate-abilene/)[Heat Watch -0.7 °C](https://siscto.si/heat-watch/openai-stargate-abilene/)

Operating, expanding

Denton, Texas · CoreWeave

262 MW of IT power running as of Sep 1, 2026

Announced 260 MWConfirmed energized 262 MW[Ledger](https://siscto.si/ledger/denton/)

[Site page](https://siscto.si/power-map/coreweave-denton-tx/)[Heat Watch -0.7 °C](https://siscto.si/heat-watch/coreweave-denton-tx/)

Operating

Temple, Texas · Meta

178 MW of IT power running as of Sep 30, 2026

[Site page](https://siscto.si/power-map/meta-temple/)[Heat Watch +0.5 °C](https://siscto.si/heat-watch/meta-temple/)

Operating, expanding

Afton, Texas · CoreWeave

132 MW of IT power running as of Aug 30, 2026

Running 132 MWPlanned 528 MWEpoch AI

[Site page](https://siscto.si/power-map/coreweave-helios/)[Heat Watch -0.5 °C](https://siscto.si/heat-watch/coreweave-helios/)

Operating

Midlothian, Texas · Google

103 MW of IT power running as of Jul 1, 2026

[Site page](https://siscto.si/power-map/google-midlothian/)[Heat Watch +0.3 °C](https://siscto.si/heat-watch/google-midlothian/)

Operating, expanding

Red Oak, Texas · Google

77 MW of IT power running as of Feb 6, 2026

Running 77 MWPlanned 154 MWEpoch AI

[Site page](https://siscto.si/power-map/google-red-oak/)[Heat Watch +0.8 °C](https://siscto.si/heat-watch/google-red-oak/)

Operating

San Antonio, Texas · Microsoft

75 MW of IT power running as of Feb 4, 2026

[Site page](https://siscto.si/power-map/microsoft-sat40/)[Heat Watch -1.1 °C](https://siscto.si/heat-watch/microsoft-sat40/)

Operating

San Antonio, Texas · Microsoft

47 MW of IT power running as of Mar 31, 2026

[Site page](https://siscto.si/power-map/microsoft-sat14/)[Heat Watch -0.3 °C](https://siscto.si/heat-watch/microsoft-sat14/)

Operating, expanding

San Antonio, Texas

32 MW of IT power running as of Feb 15, 2026

Running 32 MWPlanned 128 MWEpoch AI

[Site page](https://siscto.si/power-map/vantage-tx1/)[Heat Watch -0.3 °C](https://siscto.si/heat-watch/vantage-tx1/)

Under construction

Colorado City, Texas · Cipher Mining

No building running yet as of Jul 30, 2026

Announced 207 MWConfirmed energized none yet[Ledger](https://siscto.si/ledger/barber-lake/)

[Site page](https://siscto.si/power-map/anthropic-barber-lake/)[Heat Watch +0.5 °C](https://siscto.si/heat-watch/anthropic-barber-lake/)

Under construction

Abilene, Texas · Microsoft

No building running yet as of Jan 15, 2026

Announced 900 MWConfirmed energized none yet[Ledger](https://siscto.si/ledger/abilene-microsoft-campus/)

[Site page](https://siscto.si/power-map/crusoe-abilene-expansion/)[Heat Watch -0.4 °C](https://siscto.si/heat-watch/crusoe-abilene-expansion/)

Under construction

Claude, Texas · Google

No building running yet as of Apr 16, 2026

Running none yetPlanned 1.01 GWEpoch AI

[Site page](https://siscto.si/power-map/goodnight/)[Heat Watch +1.3 °C](https://siscto.si/heat-watch/goodnight/)

Under construction

Burlington, Texas · Softbank

No building running yet as of Mar 23, 2026

Announced 1.2 GWConfirmed energized none yet[Ledger](https://siscto.si/ledger/stargate-milam-county/)

[Site page](https://siscto.si/power-map/openai-stargate-milam/)[Heat Watch -0.1 °C](https://siscto.si/heat-watch/openai-stargate-milam/)

Under construction

Abilene, Texas · Oracle

No building running yet as of Sep 4, 2026

Announced 1.4 GWConfirmed energized none yet[Ledger](https://siscto.si/ledger/stargate-shackelford-county/)

[Site page](https://siscto.si/power-map/openai-stargate-shackelford/)[Heat Watch +0.7 °C](https://siscto.si/heat-watch/openai-stargate-shackelford/)

Power prices

## What homes in Texas pay

Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA).

Average residential price, cents per kWh, by month. Source: U.S. Energy Information Administration (series ELEC.PRICE.TX-RES.M), through August 2026, published October 22, 2026.

Grid and bills

## Texas's grid, and what data centers add

Only figures a market monitor, a state commission or a utility filing published, each with its link and date. They describe a grid region, not one home.

Grid operators in Texas: ERCOT (about 90% of the state's electric load); MISO (all or part of the state); Southwest Power Pool (part of the state). Sources: [ERCOT, About](https://www.ercot.com/about), [Wikipedia, Midcontinent Independent System Operator (revision of Sep 26, 2026)](https://en.wikipedia.org/wiki/Midcontinent_Independent_System_Operator), [Wikipedia, Southwest Power Pool (revision of Aug 17, 2026)](https://en.wikipedia.org/wiki/Southwest_Power_Pool), read November 17, 2026.

No market monitor, state commission or utility filing that puts a number on what data center demand adds to power costs in Texas has been read and verified for this page yet, so none is shown. Nationally, [Pew Research Center](https://www.pewresearch.org/short-reads/2026/05/06/many-americans-hold-utility-companies-responsible-for-their-rising-home-energy-bills/) found in 2026 that 43% of the US adults whose energy costs went up call data centers a major reason.

Neighbor reports

## Hearings, proposals and sightings in Texas

Filed by neighbors with an SI Passport, approved by the team against a public source, and sealed on Solana.

[Report something](https://siscto.si/next-door/#report)

- Loading the approved reports.

[Every upcoming hearing in Texas as a calendar file](https://sicto.si/api/sis-nextdoor.php?a=ics&state=TX)

Questions

## Texas, answered

The short version, with the sources.

[How SI Next Door works](https://siscto.si/next-door/method/)

### How many SI data centers are in Texas?

Texas has 14 SI data centers on the Power Map, 5 of them under construction, with 1.73 GW of IT power running per Epoch AI. The list comes from the [Power Map](https://siscto.si/power-map/), which draws on Epoch AI's public tracker.

### How much does electricity cost for homes in Texas?

Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA). The series is the U.S. Energy Information Administration's average residential price, published October 22, 2026.

### Are data centers raising power bills in Texas?

No source this page could verify has put a number on it for Texas. SI Next Door shows only figures a market monitor, a state commission or a utility filing published, with the link and the date.

Join the takeover

## Know what is coming to your town

Look up your ZIP code, follow it on Telegram and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)