# Apollo Power Generation Facility: Onsite Power Watch

> Apollo Power Generation Facility: 350 MW, plus about 120 MW of batteries of gas power for The data center campus of Liames, permitted. Sources linked.

Source: https://siscto.si/onsite-power/apollo/
Updated: 2026-11-26

1. [Home](https://siscto.si/)
2. [Onsite Power Watch](https://siscto.si/onsite-power/)
3. Apollo Power Generation Facility

Onsite Power Watch · Gas

# Apollo Power Generation Facility

Apollo Power Generation Facility: gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries. It serves the data center campus of Liames, LLC, beside the plant in Wood County, Ohio. Status: permitted, as of February 3, 2026. Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

Size
:   [350 MW](https://siscto.si/onsite-power/apollo/#facts)

Fuel
:   [Gas](https://siscto.si/onsite-power/#totals)

Status
:   [Permitted](https://siscto.si/onsite-power/apollo/#filing)

As of
:   [Feb 3, 2026](https://siscto.si/onsite-power/apollo/#sources)

The facts

## What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

- The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).

- Epoch AI's record of Meta Bowling Green, which the Power Map uses, lists the Apollo project and the Siting Board announcement among its sources.

The filing

## The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Permitted · Feb 3, 2026

Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

[Open the filing](https://content.govdelivery.com/accounts/OHPUC/bulletins/4077fa5)

The site

## The data center it serves

Linked to the Power Map only where a source ties the two.

[Meta Bowling Green](https://siscto.si/power-map/meta-bowling-green/) on the Power Map: Bowling Green, Ohio.

Sources

## Where every fact comes from

Each source was opened and read on November 23, 2026.

Feb 3, 2026, read Nov 23, 2026

### Ohio Power Siting Board

OPSB authorizes construction of Wood County power plant

[Open the source](https://content.govdelivery.com/accounts/OHPUC/bulletins/4077fa5)

retrieved Nov 10, 2026

### Epoch AI

The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

[Open the source](https://epoch.ai/data/ai-data-centers)

Keep going

## The grid around it

The same place, other records.

### The Queue: PJM

How much power data centers are asking PJM for.

### Onsite Power Watch

Every plant built to run a data center directly.

### Grid Watch

Live demand on the grids that host the most sites.

### Gigawatt Ledger

What was announced against what is confirmed energized.

Questions

## Apollo Power Generation Facility, answered

The plant, its status and the sources.

### What is Apollo Power Generation Facility?

Gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries, built to serve The data center campus of Liames, LLC, beside the plant in Wood County, Ohio. On site, behind the meter or beside the campus.

### What is its status?

Permitted, as of February 3, 2026: Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

### Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).

Join the takeover

## Watch the plants with us

Found a newer permit or filing for this plant? Bring it to the $SIS Telegram with its link.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)