# Gas plant for Meta in El Paso: Onsite Power Watch

> Gas plant for Meta in El Paso: 366 MW of gas power for a meta data center in el paso, proposed. The permit or filing behind it, dated and linked.

Source: https://siscto.si/onsite-power/meta-el-paso-gas/
Updated: 2026-11-26

1. [Home](https://siscto.si/)
2. [Onsite Power Watch](https://siscto.si/onsite-power/)
3. Gas plant for Meta in El Paso

Onsite Power Watch · Gas

# Gas plant for Meta in El Paso

Gas plant for Meta in El Paso: gas plant, 366 MW. It serves a Meta data center in El Paso, Texas. Status: proposed, as of July 9, 2026. Planned; no permit named in the source read.

Size
:   [366 MW](https://siscto.si/onsite-power/meta-el-paso-gas/#facts)

Fuel
:   [Gas](https://siscto.si/onsite-power/#totals)

Status
:   [Proposed](https://siscto.si/onsite-power/meta-el-paso-gas/#filing)

As of
:   [Jul 9, 2026](https://siscto.si/onsite-power/meta-el-paso-gas/#sources)

The facts

## What the public record shows

A plant planned for one data center. Each fact below names its source.

- The report lists a planned 366 MW gas plant for a Meta data center in El Paso (The Texas Tribune and Floodlight, July 9, 2026). The permit is on the monthly recheck list.

The filing

## The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Proposed · Jul 9, 2026

Planned; no permit named in the source read.

[Open the filing](https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/)

The site

## The data center it serves

Linked to the Power Map only where a source ties the two.

A Meta data center in El Paso, Texas. Not on the Power Map.

Sources

## Where every fact comes from

Each source was opened and read on November 23, 2026.

Jul 9, 2026, read Nov 23, 2026

### The Texas Tribune and Floodlight

Planned Texas data centers could emit more greenhouse gases than many countries

[Open the source](https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/)

Keep going

## The grid around it

The same place, other records.

### The Queue: ERCOT

How much power data centers are asking ERCOT for.

### Onsite Power Watch

Every plant built to run a data center directly.

### Grid Watch

Live demand on the grids that host the most sites.

### Gigawatt Ledger

What was announced against what is confirmed energized.

Questions

## Gas plant for Meta in El Paso, answered

The plant, its status and the sources.

### What is Gas plant for Meta in El Paso?

Gas plant, 366 MW, built to serve A Meta data center in El Paso, Texas. A plant planned for one data center.

### What is its status?

Proposed, as of July 9, 2026: Planned; no permit named in the source read.

### Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The report lists a planned 366 MW gas plant for a Meta data center in El Paso (The Texas Tribune and Floodlight, July 9, 2026). The permit is on the monthly recheck list.

Join the takeover

## Watch the plants with us

Found a newer permit or filing for this plant? Bring it to the $SIS Telegram with its link.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)