# Amazon Ridgeland SI Data Center, Ridgeland, MS | $SIS

> Amazon Ridgeland is an SI data center in Ridgeland, Mississippi, owned by Amazon. Epoch AI puts its IT power at 228 MW (May 15, 2026). Map and timeline.

Source: https://siscto.si/power-map/amazon-ridgeland/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Amazon Ridgeland

Power Map · Operating, expanding

# Amazon Ridgeland, Ridgeland

Amazon Ridgeland is an SI data center in Ridgeland, Mississippi, United States, owned by Amazon and used by Anthropic (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 228 MW as of May 15, 2026, with 4 buildings operating, and projects 840 MW by September 29, 2028. Its public timeline starts on February 24, 2024.

IT power
:   228 MW (May 15, 2026)

Facility power
:   273 MW

Status
:   Operating, expanding

Buildings operating
:   4

Where it is

## The site and its facts

Amazon Ridgeland on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Ridgeland, Mississippi, United States

Address
:   1626 County Line Road Ridgeland, Mississippi

Coordinates
:   32.4105° N, 90.1898° W

Owner
:   Amazon

Users
:   Anthropic (Epoch AI rates this speculative)

Project
:   Project Rainier

Chips
:   Trainium2

Compute
:   About 171,299 H100 equivalents (Epoch AI estimate, May 15, 2026)

Energy
:   Entergy

Projected
:   840 MW IT power by September 29, 2028 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.9 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/amazon-ridgeland/)

### Lights On

NASA's night imagery read 39.2 of 100 over this site in October 2026, against 17.1 in October 2018, the first month read. Against a year before: +9.5 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=amazon-ridgeland#view)

## Dated, from the public record

Epoch AI's dated notes on Amazon Ridgeland, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Feb 24, 2024**

> Land clearing begins

No IT power yet (0 operating)

**Oct 4, 2025**

> Roof complete on Buildings 3

No IT power yet (0 operating)

**May 15, 2026**

> Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.

228 MW (4 operating)

**Feb 9, 2027 (Projection)**

> Building 5 is operational (estimate).

284 MW (5 operating)

**Sep 29, 2028 (Projection)**

> Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/).

840 MW (14 operating)

Adopt a site

## Watch Amazon Ridgeland

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Air Construction Permit](https://drive.google.com/file/d/1dQ5Pxl7rQAHLvHoTYrpOX32WAolo46d7/view?usp=sharing)

- [Permit review document](https://drive.google.com/file/d/1myQ6BYqqzcfsWwv41tufHobvA8T3qo_d/view?usp=sharing)

- [Backup diesel generator referenced in the permit](https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html)

- [New York Times article on Project Rainier](https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Amazon Ridgeland (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

23 km away

### Amazon Madison Mega Site

Canton, Mississippi, United States

284 MW IT power

136 km away

### Meta Hyperion

Holly Ridge, Louisiana, United States

IT power not stated

287 km away

### Colossus 2

Memphis, Tennessee, United States

946 MW IT power

295 km away

### Colossus 1

Memphis, Tennessee, United States

340 MW IT power

Questions

## Amazon Ridgeland, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Amazon Ridgeland?

Amazon Ridgeland is in Ridgeland, Mississippi, United States, at 1626 County Line Road Ridgeland, Mississippi. Epoch AI publishes its coordinates as 32.4105, -90.1898.

### Who owns Amazon Ridgeland?

Epoch AI lists Amazon as its owner and Anthropic (Epoch AI rates this speculative) as its user.

### How much power does Amazon Ridgeland use?

Epoch AI estimates its IT power at 228 MW as of May 15, 2026, and its total facility power at 273 MW. It projects 840 MW of IT power by September 29, 2028.

### Is Amazon Ridgeland operating?

Yes, and it is growing. Epoch AI counts 4 buildings operating as of May 15, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).