# Anthropic Barber Lake SI Data Center, Colorado City, TX

> Anthropic Barber Lake is an SI data center in Colorado City, Texas, owned by Cipher Mining. Epoch AI tracks it as under construction. Map, timeline and sources.

Source: https://siscto.si/power-map/anthropic-barber-lake/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Anthropic Barber Lake

Power Map · Under construction

# Anthropic Barber Lake, Colorado City

Anthropic Barber Lake is an SI data center in Colorado City, Texas, United States, owned by Cipher Mining and used by Anthropic. [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of July 30, 2026, and projects 207 MW by April 30, 2027. Its public timeline starts on September 18, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Anthropic Barber Lake on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Colorado City, Texas, United States

Address
:   Not public

Coordinates
:   32.3981° N, 100.9198° W

Owner
:   Cipher Mining

Users
:   Anthropic

Projected
:   207 MW IT power by April 30, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Barber Lake: 207 MW was announced for this project. Cipher said it expected to deliver 168 MW of critical IT load by September 2026. Epoch AI's entry of July 30, 2026 reads "still under construction and not yet energized", and Epoch AI estimates the first phase for about December 2026, "about 3 months later than the disclosed target".

[Open it in the Ledger](https://siscto.si/ledger/barber-lake/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/anthropic-barber-lake/)

### Lights On

NASA's night imagery read 24.0 of 100 over this site in October 2026, against 1.2 in October 2018, the first month read. Against a year before: +21.0 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=anthropic-barber-lake#view)

## Dated, from the public record

Epoch AI's dated notes on Anthropic Barber Lake, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Sep 18, 2025**

> Site grading and civil works begin.

No IT power yet (0 operating)

**Nov 29, 2025**

> Foundations of Building 1 are visible.

No IT power yet (0 operating)

**Jul 30, 2026**

> Building 1 shell is complete, with rooftop units installed, and most air-cooled chillers in place in a ground yard to the north. Most of the 120 backup diesel generators are also in place. Substantial progress since Nov 2025, still under construction and not yet energized.

No IT power yet (0 operating)

**Dec 30, 2026 (Projection)**

> Building 1 Phase I is operational: 168 MW critical IT power (244 MW gross), running Google TPU v7 (chip type inferred, tagged likely). We estimate ~Dec 2026, about 3 months later than the disclosed target, because the site is shell-complete but not yet energized as of the Jul 2026 image. Disclosed target: [Cipher 2025-09-25 PR](https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html) states the 168 MW critical IT load is "expected to be delivered by September 2026."

168 MW (1 operating)

**Apr 30, 2027 (Projection)**

> Building 1 Phase II is operational: 207 MW total critical IT (300 MW gross). Phase II adds 39 MW critical IT (see [Cipher 2025-11-20 PR](https://www.globenewswire.com/news-release/2025/11/20/3191801/0/en/Cipher-Mining-Signs-Additional-56-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html)). We estimate ~Apr 2027, about 3 months later than the ~Q1 2027 target, based on construction progress.

207 MW (1 operating)

Adopt a site

## Watch Anthropic Barber Lake

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025)](https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html)

- [Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025)](https://www.globenewswire.com/news-release/2025/11/20/3191801/0/en/Cipher-Mining-Signs-Additional-56-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html)

- [Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025)](https://www.sec.gov/Archives/edgar/data/1819989/000095010325015073/dp237633_ex9901.htm)

- [Anthropic to expand use of Google Cloud TPUs (Oct 2025)](https://www.googlecloudpresscorner.com/2025-10-23-Anthropic-to-Expand-Use-of-Google-Cloud-TPUs-and-Services)

- [Anthropic $50B US AI infrastructure with Fluidstack (Nov 2025)](https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure)

- [DCD: Cipher secures Fluidstack as customer, Google as investor](https://www.datacenterdynamics.com/en/news/cipher-mining-secures-fluidstack-as-a-customer-and-google-as-an-investor/)

- [Air quality permit listing 60 x 3 MW plus 60 x 3.1MW backup generators](https://drive.google.com/file/d/1hzNlH8549ppuCwvKfMo--3PsD-hYBJDa/view?usp=sharing)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Anthropic Barber Lake (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

107 km away

### OpenAI Stargate Abilene

Abilene, Texas, United States

824 MW IT power

107 km away

### Crusoe Abilene Expansion

Abilene, Texas, United States

IT power not stated

130 km away

### OpenAI Stargate Shackelford

Abilene, Texas, United States

IT power not stated

153 km away

### Coreweave Helios

Afton, Texas, United States

132 MW IT power

Questions

## Anthropic Barber Lake, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Anthropic Barber Lake?

Anthropic Barber Lake is in Colorado City, Texas, United States. Epoch AI publishes its coordinates as 32.3981, -100.9198.

### Who owns Anthropic Barber Lake?

Epoch AI lists Cipher Mining as its owner and Anthropic as its user.

### How much power does Anthropic Barber Lake use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 207 MW of IT power by April 30, 2027.

### Is Anthropic Barber Lake operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).