# AWS Berwick, Berwick

AWS Berwick is an SI data center in Berwick, Pennsylvania, United States, owned by Amazon and used by Anthropic (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 108 MW as of August 1, 2026, with 3 buildings operating, and projects 169 MW by August 1, 2027. Its public timeline starts on July 1, 2021.

IT power
:   108 MW (Aug 1, 2026)

Facility power
:   139 MW

Status
:   Operating, expanding

Buildings operating
:   3

Where it is

## The site and its facts

AWS Berwick on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Berwick, Pennsylvania, United States

Address
:   1125 Electron Ave, Berwick, PA 18603

Coordinates
:   41.0851° N, 76.1488° W

Owner
:   Amazon

Users
:   Anthropic (Epoch AI rates this speculative)

Project
:   Project Rainier

Chips
:   Trainium2

Compute
:   About 81,354 H100 equivalents (Epoch AI estimate, Aug 1, 2026)

Projected
:   169 MW IT power by August 1, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/aws-berwick/)

### Lights On

NASA's night imagery read 29.3 of 100 over this site in October 2026, against 20.9 in October 2018, the first month read. Against a year before: -0.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=aws-berwick#view)

## Dated, from the public record

Epoch AI's dated notes on AWS Berwick, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jul 1, 2021**

> Land clearing begins. [Talen Energy](https://www.datacenterdynamics.com/en/news/talen-energy-to-build-300mw-nuclear-powered-cryptomining-facility-and-data-center-in-us/) reported on July 12, 2021 that site-preparation permits had already been obtained and site work was underway, while permits for construction of the first building were still being pursued. We model land clearing as starting from the beginning of the month.

No IT power yet (0 operating)

**Jan 17, 2023**

> [Cumulus](https://www.prnewswire.com/news-releases/cumulus-data-completes-key-milestones-in-construction-of-its-flagship-zero-carbon-susquehanna-data-center-campus-301722751.html) completes a 48 MW, 300,000 sq ft powered shell for the first data center at the Susquehanna campus. The shell is available for lease, with the campus still awaiting its first tenant and commercial operations.

No IT power yet (0 operating)

**Mar 4, 2024**

> [AWS](https://www.sec.gov/Archives/edgar/data/1622536/000162828025023501/tln-20250331.htm) acquires the Cumulus/Talen building campus for $650M.

No IT power yet (0 operating)

**Jun 1, 2024**

> Building 1 fit out and related construction begins under Amazon, based on the [Susquehanna River Basin Commission](https://www.srbc.gov/waav/search/GetPending?documentType=Application&isABRe=false&projectNumber=2024-056) (SRBC) schedule.

No IT power yet (0 operating)

**Sep 9, 2025**

> Building 1 operational estimate. According to [Google Earth Satellite Imagery](https://earth.google.com/web/search/Berwick,+PA/@41.08459175,-76.14321499,203.05778839a,756.59305105d,35y,0h,0t,0r/data=CiwiJgokCYCDFkPTLDRAEX6DFkPTLDTAGUGoL_2-pEVAIRNn30rGL03AQgIIAUICCABKDQj___________8BEAA) from this date, Building 1 appears structurally complete and likely operational, while Building 2 is still missing two generators.

47 MW (1 operating)

**Jan 7, 2026**

> Building 2 operational estimate. This is based on the progress visible in the September 2025 image. [The DEP](https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-4/56-4.pdf) also issues an air plan approval to add 48 more emergency generators on this date.

77 MW (2 operating)

**Mar 12, 2026**

> [The SRBC](https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301) increases approved water use from 0.060 MGD to 0.129 MGD. This supports that some expansion is happening, but does not explicitly prove a third operational building.

77 MW (2 operating)

**May 5, 2026**

> Buildings 1 and 2 visibly complete and operational. Building 3 appears complete and may be commissioning, but it's likely not operational yet given the immediate surrounding construction work. Several additional building shells and pads are still in construction, but none are assumed operational due to all the construction work visible. This is based on satellite imagery from this date.

77 MW (2 operating)

**Aug 1, 2026**

> Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a reference.

108 MW (3 operating)

**Aug 1, 2027 (Projection)**

> Building 4 expected to come online around August 2027, judging from prior satellite imagery. Modeled at twice Building 2's capacity because Building 4 is approximately twice its size.

169 MW (4 operating)

Adopt a site

## Watch AWS Berwick

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [NYT reporting that one of the Project Rainier sites may be in Pennsylvania](https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html)

- [Talen SEC filing detailing the $650M sale of the Cumulus data center campus to AWS](https://www.sec.gov/Archives/edgar/data/1622536/000162828024036935/tln-20240630.htm)

- [Pennsylvania PUC filing describing the planned 16-building AWS data center development](https://www.puc.pa.gov/pcdocs/1861638.pdf)

- [SRBC filing covering AWS campus expansion and water-use plans](https://www.srbc.gov/about/news/docs/2025-159-final-public-comment-responses-20260128.pdf)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for AWS Berwick (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

116 km away

### CoreWeave Lancaster Greenfield site

Lancaster, Pennsylvania, United States

IT power not stated

208 km away

### Microsoft-Nebius New Jersey

Vineland, New Jersey, United States

50 MW IT power

266 km away

### Google Arcola

Arcola, Virginia, United States

77 MW IT power

284 km away

### Google Bristow

Bristow, Virginia, United States

238 MW IT power

Questions

## AWS Berwick, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is AWS Berwick?

AWS Berwick is in Berwick, Pennsylvania, United States, at 1125 Electron Ave, Berwick, PA 18603. Epoch AI publishes its coordinates as 41.0851, -76.1488.

### Who owns AWS Berwick?

Epoch AI lists Amazon as its owner and Anthropic (Epoch AI rates this speculative) as its user.

### How much power does AWS Berwick use?

Epoch AI estimates its IT power at 108 MW as of August 1, 2026, and its total facility power at 139 MW. It projects 169 MW of IT power by August 1, 2027.

### Is AWS Berwick operating?

Yes, and it is growing. Epoch AI counts 3 buildings operating as of August 1, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).