# Colossus 1 SI Data Center, Memphis, TN | $SIS

> Colossus 1 is an SI data center in Memphis, Tennessee, owned by SpaceXAI. Epoch AI puts its IT power at 340 MW (Jun 15, 2026). Map, dated timeline and sources.

Source: https://siscto.si/power-map/colossus-1/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Colossus 1

Power Map · Operating

# Colossus 1, Memphis

Colossus 1 is an SI data center in Memphis, Tennessee, United States, owned by SpaceXAI and used by Anthropic. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 340 MW as of June 15, 2026, with 1 building operating. Its public timeline starts on April 24, 2024.

IT power
:   340 MW (Jun 15, 2026)

Facility power
:   425 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

Colossus 1 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Memphis, Tennessee, United States

Address
:   3231 Riverport Rd, Memphis, TN 38109

Coordinates
:   35.0602° N, 90.1555° W

Owner
:   SpaceXAI

Users
:   Anthropic

Chips
:   H100, H200, B200

Compute
:   About 275,796 H100 equivalents (Epoch AI estimate, Jun 15, 2026)

Energy
:   MLGW

Seen from orbit · Compute Watch

### The newest clear pass over Colossus 1

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### The Gigawatt Ledger

Colossus: 2 GW was announced for this project. Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below.

[Open it in the Ledger](https://siscto.si/ledger/colossus-memphis/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day, a change of -0.0 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/colossus-1/)

### Lights On

NASA's night imagery read 38.6 of 100 over this site in October 2026, against 34.4 in October 2018, the first month read. Against a year before: +2.2 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=colossus-1#view)

## Dated, from the public record

Epoch AI's dated notes on Colossus 1, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 24, 2024**

> Construction starts with a road added on site, retrofitting a former Electrolux building.

No IT power yet (0 operating)

**Aug 11, 2024**

> First [significant/useful training workload](https://x.ai/colossus) on 25k H100s.

35 MW (1 operating)

**Sep 2, 2024**

> [100k H100s online](https://archive.is/z39uN).

139 MW (1 operating)

**Feb 17, 2025**

> 150k H100s and 50k H200s online. This is roughly when [Musk](https://archive.is/z39uN) [said](https://archive.is/z39uN), plus on this date they reported "running jobs with 150K+ GPUs".

278 MW (1 operating)

**Mar 6, 2025**

> Second substation almost connected (red cables)

278 MW (1 operating)

**Jul 22, 2025**

> 30k B200s [added](https://archive.is/oHQSA) (in GB200 configuration).

340 MW (1 operating)

**Sep 17, 2025**

> Third substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added.

268 MW (1 operating)

**Oct 19, 2025**

> There is still construction visible in the third substation yard and next to the new cooling towers.

268 MW (1 operating)

**Nov 7, 2025**

> Third substation was expected to power the building in Fall.

340 MW (1 operating)

**Feb 11, 2026**

> All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.

340 MW (1 operating)

**May 6, 2026**

> Anthropic [announces](https://www.anthropic.com/news/higher-limits-spacex) their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates.

340 MW (1 operating)

**Jun 1, 2026**

> We assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May.

340 MW (1 operating)

**Jun 15, 2026**

> No major changes to the data center since February. Solar panels have been placed next to the facility.

340 MW (1 operating)

Adopt a site

## Watch Colossus 1

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [May 2025 Electricity Provider Disclosure](https://drive.google.com/file/d/17WAFThn95X85ebzA_e19R1zYycwFzAl2/view?usp=sharing)

- [July 2025 Permit for Gas Turbines](https://www.scribd.com/document/883601734/01156-01PC-070225-Permit)

- [Southern Environmental Law Center Gas Permit Appeal, with additional satellite images](https://cdn.arstechnica.net/wp-content/uploads/2025/07/NAACP-and-YGGs-xAI-Air-Permit-Appeal-7-15-2025.pdf)

- [Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUs](https://archive.is/oHQSA)

- [Anthropic announcement](https://www.anthropic.com/news/higher-limits-spacex)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Colossus 1 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

13 km away

### Colossus 2

Memphis, Tennessee, United States

946 MW IT power

274 km away

### Amazon Madison Mega Site

Canton, Mississippi, United States

284 MW IT power

295 km away

### Amazon Ridgeland

Ridgeland, Mississippi, United States

228 MW IT power

315 km away

### Meta Hyperion

Holly Ridge, Louisiana, United States

IT power not stated

Questions

## Colossus 1, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Colossus 1?

Colossus 1 is in Memphis, Tennessee, United States, at 3231 Riverport Rd, Memphis, TN 38109. Epoch AI publishes its coordinates as 35.0602, -90.1555.

### Who owns Colossus 1?

Epoch AI lists SpaceXAI as its owner and Anthropic as its user.

### How much power does Colossus 1 use?

Epoch AI estimates its IT power at 340 MW as of June 15, 2026, and its total facility power at 425 MW.

### Is Colossus 1 operating?

Yes. Epoch AI counts 1 building operating as of June 15, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).