# Core42 Lake Mariner SI Data Center, Barker, NY | $SIS

> Core42 Lake Mariner is an SI data center in Barker, New York, owned by Core42. Epoch AI puts its IT power at 58 MW (Jul 23, 2026). Map, timeline and sources.

Source: https://siscto.si/power-map/core42-lake-mariner/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Core42 Lake Mariner

Power Map · Operating

# Core42 Lake Mariner, Barker

Core42 Lake Mariner is an SI data center in Barker, New York, United States, owned by Core42 and used by G42 (Epoch AI rates this likely). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 58 MW as of July 23, 2026, with 2 buildings operating. Its public timeline starts on October 1, 2024.

IT power
:   58 MW (Jul 23, 2026)

Facility power
:   58 MW

Status
:   Operating

Buildings operating
:   2

Where it is

## The site and its facts

Core42 Lake Mariner on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Barker, New York, United States

Address
:   7725 Lake Rd, Barker, NY 14012

Coordinates
:   43.3549° N, 78.6060° W

Owner
:   Core42

Users
:   G42 (Epoch AI rates this likely)

Chips
:   B200

Compute
:   About 71,753 H100 equivalents (Epoch AI estimate, Jul 23, 2026)

Timeline

### The Gigawatt Ledger

Lake Mariner: 440 MW was announced for this project. Public evidence puts 268 MW in operation as of October 31, 2026, against 440 MW announced: 61%. The announcement states IT load, so it is set against the IT load running.

[Open it in the Ledger](https://siscto.si/ledger/lake-mariner/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/core42-lake-mariner/)

### Lights On

NASA's night imagery read 27.9 of 100 over this site in October 2026, against 2.8 in October 2018, the first month read. Against a year before: +20.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=core42-lake-mariner#view)

## Dated, from the public record

Epoch AI's dated notes on Core42 Lake Mariner, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 1, 2024**

> Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.

No IT power yet (0 operating)

**Oct 1, 2025**

> Building 1 is operational. Based on Terawulf [saying](https://investors.terawulf.com/news-events/press-releases/detail/126/terawulf-reports-third-quarter-2025-results) "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was [said](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

16 MW (1 operating)

**Mar 2, 2026**

> Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's [statement](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2B is expected in March 2026, and is likely still in commissioning phase.

16 MW (1 operating)

**Mar 31, 2026**

> Building 2 is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from [RAAD](https://raad.com/) showed no cooling fan movement on May 8th, suggesting it was not in use. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

58 MW (2 operating)

**Jul 23, 2026**

> Both buildings still operational according to satellite imagery.

58 MW (2 operating)

Adopt a site

## Watch Core42 Lake Mariner

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Terawulf press release with details of Core42 lease for Buildings 1-2](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center)

- [Terawulf press release with details and timeline for Buildings 1-5](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results)

- [DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner](https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/)

- [Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York](https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Core42 Lake Mariner (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

0 km away

### Anthropic Lake Mariner

Barker, New York, United States

210 MW IT power

308 km away

### OpenAI Stargate Lordstown

Lordstown, Ohio, United States

IT power not stated

323 km away

### AWS Berwick

Berwick, Pennsylvania, United States

108 MW IT power

416 km away

### CoreWeave Lancaster Greenfield site

Lancaster, Pennsylvania, United States

IT power not stated

Questions

## Core42 Lake Mariner, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Core42 Lake Mariner?

Core42 Lake Mariner is in Barker, New York, United States, at 7725 Lake Rd, Barker, NY 14012. Epoch AI publishes its coordinates as 43.3549, -78.6060.

### Who owns Core42 Lake Mariner?

Epoch AI lists Core42 as its owner and G42 (Epoch AI rates this likely) as its user.

### How much power does Core42 Lake Mariner use?

Epoch AI estimates its IT power at 58 MW as of July 23, 2026, and its total facility power at 58 MW.

### Is Core42 Lake Mariner operating?

Yes. Epoch AI counts 2 buildings operating as of July 23, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).