Power Map · Operating, expanding

# CoreWeave Chester VA, Chester

CoreWeave Chester VA is an SI data center in Chester, Virginia, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 82 MW as of May 20, 2026, with 2 buildings operating, and projects 113 MW by June 30, 2027. Its public timeline starts on September 18, 2023.

IT power
:   82 MW (May 20, 2026)

Facility power
:   114 MW

Status
:   Operating, expanding

Buildings operating
:   2

Where it is

## The site and its facts

CoreWeave Chester VA on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Chester, Virginia, United States

Address
:   1401 Meadowville Technology Parkway, Chester, VA

Coordinates
:   37.3591° N, 77.3295° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   H100, B200

Compute
:   About 88,428 H100 equivalents (Epoch AI estimate, May 20, 2026)

Projected
:   113 MW IT power by June 30, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day, a change of +0.2 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-chester-va/)

### Lights On

NASA's night imagery read 46.6 of 100 over this site in October 2026, against 31.7 in October 2018, the first month read. Against a year before: +2.9 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-chester-va#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Chester VA, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Sep 18, 2023**

> Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/

No IT power yet (0 operating)

**Jan 31, 2024**

> Building 1's second data hall scheduled to come online this month.

18 MW (1 operating)

**Apr 30, 2024**

> Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.

27 MW (1 operating)

**Jan 22, 2025**

> Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there.

27 MW (1 operating)

**May 20, 2026**

> Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.

82 MW (2 operating)

**Jun 30, 2027 (Projection)**

> Buildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation.

113 MW (3 operating)

Adopt a site

## Watch CoreWeave Chester VA

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Chirisa secures $200 million loan to fit out VA Data center for CoreWeave](https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/)

- [Blue Owl-led JV secures $750m to build out data centers for CoreWeave](https://www.datacenterdynamics.com/en/news/blue-owl-led-jv-secures-750m-to-build-out-data-centers-for-coreweave/)

- [Chirisa offers former Capital One data center in Virginia to hyperscalers](https://www.datacenterdynamics.com/en/news/chirisa-offers-former-capital-one-data-center-in-virginia-to-hyperscalers/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Chester VA (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

15 km away

### QTS Richmond 3

Sandston, Virginia, United States

144 MW IT power

16 km away

### QTS Richmond 1

Sandston, Virginia, United States

238 MW IT power

16 km away

### QTS Richmond 2

Sandston, Virginia, United States

180 MW IT power

155 km away

### STACK Infrastructure NVA02

Manassas, Virginia, United States

85 MW IT power

Questions

## CoreWeave Chester VA, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Chester VA?

CoreWeave Chester VA is in Chester, Virginia, United States, at 1401 Meadowville Technology Parkway, Chester, VA. Epoch AI publishes its coordinates as 37.3591, -77.3295.

### Who owns CoreWeave Chester VA?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Chester VA use?

Epoch AI estimates its IT power at 82 MW as of May 20, 2026, and its total facility power at 114 MW. It projects 113 MW of IT power by June 30, 2027.

### Is CoreWeave Chester VA operating?

Yes, and it is growing. Epoch AI counts 2 buildings operating as of May 20, 2026, with more capacity on its timeline.