# CoreWeave Dalton 1 & 2 SI Data Center, Dalton, GA | $SIS

> CoreWeave Dalton 1 & 2 is an SI data center in Dalton, Georgia, owned by CoreWeave. Epoch AI puts its IT power at 28 MW (Feb 20, 2026). Map and timeline.

Source: https://siscto.si/power-map/coreweave-dalton-1-and-2/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. CoreWeave Dalton 1 & 2

Power Map · Operating

# CoreWeave Dalton 1 & 2, Dalton

CoreWeave Dalton 1 & 2 is an SI data center in Dalton, Georgia, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 28 MW as of February 20, 2026, with 1 building operating. Its public timeline starts on June 3, 2024.

IT power
:   28 MW (Feb 20, 2026)

Facility power
:   40 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

CoreWeave Dalton 1 & 2 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Dalton, Georgia, United States

Address
:   2205 Industrial South Rd, Dalton, GA, 30721

Coordinates
:   34.7132° N, 84.9510° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   B300

Compute
:   About 32,239 H100 equivalents (Epoch AI estimate, Feb 20, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +3.2 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-dalton-1-and-2/)

### Lights On

NASA's night imagery read 49.6 of 100 over this site in October 2026, against 43.8 in October 2018, the first month read. Against a year before: +11.3 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-dalton-1-and-2#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Dalton 1 & 2, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jun 3, 2024**

> According to a [few](https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-high-performance-computing-services-capturing-significant-ai-compute-opportunity) [sources](https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm), Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, "The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025."

No IT power yet (0 operating)

**May 1, 2025**

> Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction. Source: https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf

No IT power yet (0 operating)

**Aug 29, 2025**

> Based on Satellite imagery, Dalton 1 is still under construction. The building appears mostly roofed except for the entrance area, and there are no cooling units or backup generators installed yet.

No IT power yet (0 operating)

**Feb 20, 2026**

> Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.

28 MW (1 operating)

Adopt a site

## Watch CoreWeave Dalton 1 & 2

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Core Scientific page](https://corescientific.com/high-density-data-centers/dalton-ga-dnn1-2/)

- [SEC filing with power utility information](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf)

- [DCD article](https://www.datacenterdynamics.com/en/news/core-scientific-plans-new-ai-data-centers-in-dalton-georgia/)

- [Core Scientific presentation](https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Dalton 1 & 2 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

108 km away

### CoreWeave Marble NC

Marble, North Carolina, United States

65 MW IT power

115 km away

### xAI QTS Atlanta

Atlanta, Georgia, United States

17.3 MW IT power

145 km away

### Microsoft Fairwater Atlanta

Fayetteville, Georgia, United States

636 MW IT power

154 km away

### Meta Huntsville

Huntsville, Alabama, United States

146 MW IT power

Questions

## CoreWeave Dalton 1 & 2, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Dalton 1 & 2?

CoreWeave Dalton 1 & 2 is in Dalton, Georgia, United States, at 2205 Industrial South Rd, Dalton, GA, 30721. Epoch AI publishes its coordinates as 34.7132, -84.9510.

### Who owns CoreWeave Dalton 1 & 2?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Dalton 1 & 2 use?

Epoch AI estimates its IT power at 28 MW as of February 20, 2026, and its total facility power at 40 MW.

### Is CoreWeave Dalton 1 & 2 operating?

Yes. Epoch AI counts 1 building operating as of February 20, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).