# CoreWeave Denton TX, Denton

CoreWeave Denton TX is an SI data center in Denton, Texas, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this likely). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 262 MW as of September 1, 2026, with 7 buildings operating, and projects 282 MW by May 31, 2027. Its public timeline starts on November 1, 2024.

IT power
:   262 MW (Sep 1, 2026)

Facility power
:   367 MW

Status
:   Operating, expanding

Buildings operating
:   7

Where it is

## The site and its facts

CoreWeave Denton TX on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Denton, Texas, United States

Address
:   8171 Jim Christal Rd, Denton, TX 76207

Coordinates
:   33.2148° N, 97.2100° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this likely)

Chips
:   B200

Compute
:   About 252,653 H100 equivalents (Epoch AI estimate, Sep 1, 2026)

Projected
:   282 MW IT power by May 31, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Denton: 260 MW was announced for this project. Public evidence puts 262 MW in operation as of September 1, 2026, against 260 MW announced: 100%. The announcement states IT load, so it is set against the IT load running.

[Open it in the Ledger](https://siscto.si/ledger/denton/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day, a change of +0.3 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-denton-tx/)

### Lights On

NASA's night imagery read 38.2 of 100 over this site in October 2026, against 12.9 in October 2018, the first month read. Against a year before: -4.7 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-denton-tx#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Denton TX, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Nov 1, 2024**

> Construction start - The [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706) reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.

No IT power yet (0 operating)

**May 31, 2025**

> First 8 MW billable tranche dedicated to AI [starts running at the site](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/q12025corescientificinc-ea.htm), with another 40 scheduled by the end of the quarter.

8 MW (1 operating)

**Dec 31, 2025**

> Half the campus energized. 67 billable MW [are now dedicated](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf) to CoreWeave's GPUs across three buildings.

67 MW (3 operating)

**Feb 23, 2026**

> Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.

131 MW (4 operating)

**Mar 2, 2026**

> Buildings 1-3 (Denton North) are fully operational running AI (Denton North at 90 MW, Denton South partially running at 41). This is according to an [earnings call](https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/) from this date.

131 MW (4 operating)

**Jul 3, 2026**

> Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the [Q2 2026 Earnings call](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf) stating the campus was operational by midyear 2026.

262 MW (7 operating)

**Sep 1, 2026**

> Building 8 interior fit-out scheduled to begin. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026.

262 MW (7 operating)

**May 31, 2027 (Projection)**

> Building 8 projected operational. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules Building A's data-hall fit-out for completion by this date.

282 MW (8 operating)

Adopt a site

## Watch CoreWeave Denton TX

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TX](https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site)

- [Core Scientific - Denton Datacenter Official Site](https://corescientific.com/high-density-data-centers/denton-texas/)

- [TMF - Core Scientific Q4 2025 Earnings Transcript](https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/)

- [WSJ - plans to rent to OpenAI](https://www.wsj.com/tech/ai/coreweave-stock-market-ai-bubble-a3c8c321)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Denton TX (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

85 km away

### Google Red Oak

Red Oak, Texas, United States

77 MW IT power

87 km away

### Google Midlothian

Midlothian, Texas, United States

103 MW IT power

231 km away

### OpenAI Stargate Shackelford

Abilene, Texas, United States

IT power not stated

232 km away

### Meta Temple

Temple, Texas, United States

178 MW IT power

Questions

## CoreWeave Denton TX, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Denton TX?

CoreWeave Denton TX is in Denton, Texas, United States, at 8171 Jim Christal Rd, Denton, TX 76207. Epoch AI publishes its coordinates as 33.2148, -97.2100.

### Who owns CoreWeave Denton TX?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this likely) as its user.

### How much power does CoreWeave Denton TX use?

Epoch AI estimates its IT power at 262 MW as of September 1, 2026, and its total facility power at 367 MW. It projects 282 MW of IT power by May 31, 2027.

### Is CoreWeave Denton TX operating?

Yes, and it is growing. Epoch AI counts 7 buildings operating as of September 1, 2026, with more capacity on its timeline.