# CoreWeave Ellendale ND SI Data Center, Ellendale, ND | $SIS

> CoreWeave Ellendale ND is an SI data center in Ellendale, North Dakota, owned by CoreWeave. Epoch AI puts its IT power at 68 MW (Jun 30, 2026).

Source: https://siscto.si/power-map/coreweave-ellendale-nd/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. CoreWeave Ellendale ND

Power Map · Operating, expanding

# CoreWeave Ellendale ND, Ellendale

CoreWeave Ellendale ND is an SI data center in Ellendale, North Dakota, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 68 MW as of June 30, 2026, with 1 building operating, and projects 400 MW by June 1, 2027. Its public timeline starts on October 31, 2023.

IT power
:   68 MW (Jun 30, 2026)

Facility power
:   88 MW

Status
:   Operating, expanding

Buildings operating
:   1

Where it is

## The site and its facts

CoreWeave Ellendale ND on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Ellendale, North Dakota, United States

Address
:   9685 87th Ave SE, Ellendale, ND 58436

Coordinates
:   46.0153° N, 98.5725° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   B200

Compute
:   About 93,482 H100 equivalents (Epoch AI estimate, Jun 30, 2026)

Projected
:   400 MW IT power by June 1, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Polaris Forge 1: 400 MW was announced for this project. Public evidence puts 68 to 175 MW in operation as of June 30, 2026, against 400 MW announced: 17% to 44%. The range covers every figure listed below.

[Open it in the Ledger](https://siscto.si/ledger/polaris-forge-1/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-ellendale-nd/)

### Lights On

NASA's night imagery read 26.0 of 100 over this site in October 2026, against 0.2 in October 2018, the first month read. Against a year before: +9.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-ellendale-nd#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Ellendale ND, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 31, 2023**

> Start of construction for the first building, according to [Applied Digital](https://ir.applieddigital.com/news-events/press-releases/detail/75/applied-digital-announces-groundbreaking-of). CoreWeave was not leased yet at this site, but this is the construction start date we're using for relevance.

No IT power yet (0 operating)

**May 28, 2025**

> CoreWeave signed the first lease package for 250 MW. No buildings online yet. This is according to an [SEC 8-k filing](https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm) from this date.

No IT power yet (0 operating)

**Aug 29, 2025**

> [A new 150 MW lease](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with) brings CoreWeave to 400 MW total contracted. The project is now clearly scheduled to be a three-building CoreWeave campus.

No IT power yet (0 operating)

**Oct 27, 2025**

> The first 50 MW slice of Building 1 has reached Ready for Service status according to [this report](https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at). This is the first point where we would count any CoreWeave capacity as operational.

50 MW (1 operating)

**Nov 24, 2025**

> [This Applied Digital report](https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at) says the rest of Building 1 has reached Ready for Service, bringing the first building to its expected 100 MW. We can treat this as the first completed data center building.

68 MW (1 operating)

**Mar 27, 2026**

> According to satellite imagery, Building 1 looks complete and in service, with the surrounding power/cooling equipment also operational. (Note: this image doesn't provide a view of buildings 2 or 3, though it's very safe to assume they're under construction at this stage, considering they're still under construction in the satellite image 3 months from now.)

68 MW (1 operating)

**Jun 30, 2026**

> According to satellite imagery, Building 2 is fully roofed and shell complete, with rooftop chillers mostly installed. Building 3 construction is well underway, with about 1/4 of the roofing done and the foundation laid out.

68 MW (1 operating)

**Dec 31, 2026 (Projection)**

> According to the [schedule](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with), Building 2 should be online sometime in the second half of 2026. We can estimate the end of 2026 for 250 MW operational.

88 MW (2 operating)

**Jun 1, 2027 (Projection)**

> According to [schedule](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with), Building 3 should come online in the first half of 2027. That would bring the full PF1 campus to 400 MW, according to the contract.

400 MW (3 operating)

Adopt a site

## Watch CoreWeave Ellendale ND

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Applied Digital Announces 250MW AI Data Center Lease With CoreWeave](https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with)

- [SEC 8k Filing with Applied Digital](https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001641172-25-013199/form8-k.htm)

- [Applied Digital Delivers Second Building at Polaris Forge 1](https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Ellendale ND (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

453 km away

### Meta Rosemount

Rosemount, Minnesota, United States

178 MW IT power

557 km away

### Google Omaha

Omaha, Nebraska, United States

237 MW IT power

577 km away

### Google Papillion

Papillion, Nebraska, United States

237 MW IT power

579 km away

### Meta Sarpy

Springfield, Nebraska, United States

80 MW IT power

Questions

## CoreWeave Ellendale ND, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Ellendale ND?

CoreWeave Ellendale ND is in Ellendale, North Dakota, United States, at 9685 87th Ave SE, Ellendale, ND 58436. Epoch AI publishes its coordinates as 46.0153, -98.5725.

### Who owns CoreWeave Ellendale ND?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Ellendale ND use?

Epoch AI estimates its IT power at 68 MW as of June 30, 2026, and its total facility power at 88 MW. It projects 400 MW of IT power by June 1, 2027.

### Is CoreWeave Ellendale ND operating?

Yes, and it is growing. Epoch AI counts 1 building operating as of June 30, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).