# Coreweave Helios, Afton

Coreweave Helios is an SI data center in Afton, Texas, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 132 MW as of August 30, 2026, with 1 building operating, and projects 528 MW by January 1, 2029. Its public timeline starts on May 31, 2025.

IT power
:   132 MW (Aug 30, 2026)

Facility power
:   200 MW

Status
:   Operating, expanding

Buildings operating
:   1

Where it is

## The site and its facts

Coreweave Helios on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Afton, Texas, United States

Address
:   984 County Road 112, Afton, TX 79220

Coordinates
:   33.7751° N, 100.8698° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   B200

Compute
:   About 159,552 H100 equivalents (Epoch AI estimate, Aug 30, 2026)

Projected
:   528 MW IT power by January 1, 2029 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-helios/)

### Lights On

NASA's night imagery read 33.1 of 100 over this site in October 2026, against 0.4 in October 2018, the first month read. Against a year before: +12.0 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-helios#view)

## Dated, from the public record

Epoch AI's dated notes on Coreweave Helios, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**May 31, 2025**

> The former [crypto mining](https://web.archive.org/web/20250423225644/https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Commitment-with-CoreWeave-to-Host-Additional-Artificial-Intelligence-and-High-Performance-Computing-Infrastructure-at-Helios-Data-Center-Campus/default.aspx) Helios site begins converting the first building and expanding, with land cleared for additional buildings.

No IT power yet (0 operating)

**Aug 27, 2025**

> Backup generator pads and steel framing for chillers are visible, similar to the [3D renderings](https://www.galaxy.com/data-centers).

No IT power yet (0 operating)

**Apr 4, 2026**

> Building 1 appears substantially complete. The main white-roofed data hall is visible with exterior mechanical/electrical equipment rows installed on both sides, and adjacent generator/equipment pads plus laydown yards are active. A large graded pad north of Building 1 suggests preparation for the next phase/building. No clear satellite evidence that the AI/HPC facility is operational yet.

No IT power yet (0 operating)

**Jun 17, 2026**

> Building 1 appears externally complete and likely Ready for Service, with all cooling/roofing/generators in place, but we're not labeling it operational yet due to visible surrounding yard/construction work. CoreWeave likely still needs time to install chips and use all their designated chip capacity. The pad to the northeast has foundations being laid out for Building 2.

No IT power yet (0 operating)

**Aug 30, 2026**

> Building 1 operational at full capacity. This is based on "Phase I", which is [expected](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx) to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/or installation of CoreWeave's chips, since the June 17 image still showed active minor construction around the building.

132 MW (1 operating)

**Jan 1, 2028 (Projection)**

> Building 2 and 3 are operational at full capacity. This corresponds to "Phase II", which is [expected](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx) to be delivered "throughout 2027". We assume it takes until the end of 2027 to reach full capacity.

396 MW (3 operating)

**Jan 1, 2029 (Projection)**

> Building 4 operational at full capacity. This corresponds to "Phase III", which is [expected](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx) to be delivered "starting in 2028". We assume it takes until the end of 2028 to reach full capacity.

528 MW (4 operating)

Adopt a site

## Watch Coreweave Helios

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Galaxy Q3 financial results with power capacity timeline](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx)

- [Permit review with details on backup generators and power capacity](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8711478&Rendition=Web#:~:text=Galaxy%20Helios%20I%20LLC%20owns,are%20the%20basis%20of%20the)

- [3D renderings of Helios Building 1 on Galaxy's website, showing generators and chillers](https://www.galaxy.com/data-centers)

- [TDLR record with Building 1 construction costs and end date](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012175)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Coreweave Helios (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

144 km away

### Goodnight

Claude, Texas, United States

IT power not stated

153 km away

### Anthropic Barber Lake

Colorado City, Texas, United States

IT power not stated

174 km away

### OpenAI Stargate Abilene

Abilene, Texas, United States

824 MW IT power

175 km away

### Crusoe Abilene Expansion

Abilene, Texas, United States

IT power not stated

Questions

## Coreweave Helios, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Coreweave Helios?

Coreweave Helios is in Afton, Texas, United States, at 984 County Road 112, Afton, TX 79220. Epoch AI publishes its coordinates as 33.7751, -100.8698.

### Who owns Coreweave Helios?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does Coreweave Helios use?

Epoch AI estimates its IT power at 132 MW as of August 30, 2026, and its total facility power at 200 MW. It projects 528 MW of IT power by January 1, 2029.

### Is Coreweave Helios operating?

Yes, and it is growing. Epoch AI counts 1 building operating as of August 30, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).