Power Map · Operating

# CoreWeave Marble NC, Marble

CoreWeave Marble NC is an SI data center in Marble, North Carolina, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 65 MW as of May 6, 2026, with 1 building operating. Its public timeline starts on June 25, 2024.

IT power
:   65 MW (May 6, 2026)

Facility power
:   91 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

CoreWeave Marble NC on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Marble, North Carolina, United States

Address
:   155 Palmer Ln, Marble, NC 28905

Coordinates
:   35.1875° N, 83.9161° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   B200

Compute
:   About 78,828 H100 equivalents (Epoch AI estimate, May 6, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.9 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-marble-nc/)

### Lights On

NASA's night imagery read 8.6 of 100 over this site in October 2026, against 2.0 in October 2018, the first month read. Against a year before: -4.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-marble-nc#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Marble NC, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jun 25, 2024**

> Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.

No IT power yet (0 operating)

**Mar 13, 2026**

> The site has been energized. Two of three data halls had been delivered at [37 billable MW](https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm), supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning.

36 MW (1 operating)

**Apr 17, 2026**

> Satellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state.

36 MW (1 operating)

**May 6, 2026**

> Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.

65 MW (1 operating)

Adopt a site

## Watch CoreWeave Marble NC

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Core Scientific - Q1 2026 Fiscal Earnings Call](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm)

- [Core Scientific - Official Marble, NC Datacenter page](https://corescientific.com/high-density-data-centers/marble-nc/)

- [Core Scientific - Q1 2025 Earnings Presentation](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/exhibit992-q12025earning.htm)

- [Core Scientific - June 2024 Investor and Analyst Day](https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Marble NC (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

108 km away

### CoreWeave Dalton 1 & 2

Dalton, Georgia, United States

28 MW IT power

163 km away

### xAI QTS Atlanta

Atlanta, Georgia, United States

17.3 MW IT power

200 km away

### Microsoft Fairwater Atlanta

Fayetteville, Georgia, United States

636 MW IT power

250 km away

### Meta Huntsville

Huntsville, Alabama, United States

146 MW IT power

Questions

## CoreWeave Marble NC, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Marble NC?

CoreWeave Marble NC is in Marble, North Carolina, United States, at 155 Palmer Ln, Marble, NC 28905. Epoch AI publishes its coordinates as 35.1875, -83.9161.

### Who owns CoreWeave Marble NC?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Marble NC use?

Epoch AI estimates its IT power at 65 MW as of May 6, 2026, and its total facility power at 91 MW.

### Is CoreWeave Marble NC operating?

Yes. Epoch AI counts 1 building operating as of May 6, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).