# CoreWeave Muskogee OK, Muskogee

CoreWeave Muskogee OK is an SI data center in Muskogee, Oklahoma, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of June 13, 2026, and projects 153 MW by December 31, 2027. Its public timeline starts on November 18, 2024.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

CoreWeave Muskogee OK on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Muskogee, Oklahoma, United States

Address
:   1525 W 43rd St S, Muskogee, OK 74401, USA

Coordinates
:   35.6936° N, 95.3885° W

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Projected
:   153 MW IT power by December 31, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Muskogee: 100 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of June 13, 2026.

[Open it in the Ledger](https://siscto.si/ledger/muskogee/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here 0.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-muskogee-ok/)

### Lights On

NASA's night imagery read 41.9 of 100 over this site in October 2026, against 15.2 in October 2018, the first month read. Against a year before: +17.6 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-muskogee-ok#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Muskogee OK, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Nov 18, 2024**

> Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific [says](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center) the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs.

No IT power yet (0 operating)

**Apr 9, 2026**

> Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning. Not much progress has happened in the past 4 months, and a Q2 2026 finish seems unlikely.

No IT power yet (0 operating)

**Jun 13, 2026**

> Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators. We can assume Building 1 is not operational from all the yard work directly surrounding it, and the lack of a parking lot. Building 2 (The one not leased to CoreWeave) is still in land clearing phase.

No IT power yet (0 operating)

**Dec 31, 2026 (Projection)**

> Estimating building 1 is operational by the end of the year, judging from the building currently completed, the completed power substation to the southwest. The surrounding yard work/construction will likely still take several months, judging from the slow pace.

70 MW (1 operating)

**Dec 31, 2027 (Projection)**

> Core Scientific expects initial delivery of the second, unleased 82.5 MW Muskogee building in Q4 2027. Not signed to have CoreWeave GPUs as of yet, but may change in the future. Source: https://www.sec.gov/Archives/edgar/data/1839341/000162828026030918/exhibit991polarispressre.htm

153 MW (2 operating)

Adopt a site

## Watch CoreWeave Muskogee OK

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Core Scientific ground breaking announcement](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center)

- [Port Muskogee ground breaking announcement](https://www.portmuskogee.com/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/)

- [Air quality permit application](https://applications.deq.ok.gov/permitspublic/storedpermits/9138.pdf)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Muskogee OK (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

62 km away

### Google Pryor (North)

Pryor, Oklahoma, United States

368 MW IT power

322 km away

### CoreWeave Denton TX

Denton, Texas, United States

262 MW IT power

374 km away

### Google Red Oak

Red Oak, Texas, United States

77 MW IT power

393 km away

### Google Midlothian

Midlothian, Texas, United States

103 MW IT power

Questions

## CoreWeave Muskogee OK, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Muskogee OK?

CoreWeave Muskogee OK is in Muskogee, Oklahoma, United States, at 1525 W 43rd St S, Muskogee, OK 74401, USA. Epoch AI publishes its coordinates as 35.6936, -95.3885.

### Who owns CoreWeave Muskogee OK?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Muskogee OK use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 153 MW of IT power by December 31, 2027.

### Is CoreWeave Muskogee OK operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).