# CoreWeave Norway SI Data Center, Øvrebø, Norway | $SIS

> CoreWeave Norway is an SI data center in Øvrebø, Agder, Norway, owned by CoreWeave. Epoch AI puts its IT power at 42 MW (Aug 15, 2026). Map and timeline.

Source: https://siscto.si/power-map/coreweave-norway/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. CoreWeave Norway

Power Map · Operating

# CoreWeave Norway, Øvrebø

CoreWeave Norway is an SI data center in Øvrebø, Agder, Norway, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 42 MW as of August 15, 2026, with 1 building operating. Its public timeline starts on January 23, 2024.

IT power
:   42 MW (Aug 15, 2026)

Facility power
:   55 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

CoreWeave Norway on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Øvrebø, Agder, Norway

Address
:   Stølevegen 39, 4715 Øvrebø, Norway

Coordinates
:   58.2588° N, 7.8984° E

Owner
:   CoreWeave

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   B200

Compute
:   About 50,773 H100 equivalents (Epoch AI estimate, Aug 15, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here 0.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/coreweave-norway/)

### Lights On

NASA's night imagery read 2.8 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +1.3 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=coreweave-norway#view)

## Dated, from the public record

Epoch AI's dated notes on CoreWeave Norway, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jan 23, 2024**

> [This article](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand) from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here.

No IT power yet (0 operating)

**Jul 27, 2025**

> Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, [Bulk](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure) said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave.

42 MW (1 operating)

**Apr 25, 2026**

> Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image.

42 MW (1 operating)

**Aug 15, 2026**

> Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. [Bulk](https://bulkinfrastructure.com/newsroom/bulk-infrastructure-secures-410-million-for-n01-data-center-campus-expansion) is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet.

42 MW (1 operating)

Adopt a site

## Watch CoreWeave Norway

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [CoreWeave/Bulk N01 partnership announcement](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure)

- [Bulk N01 expansion announcement](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand)

- [Bulk N01 campus brochure with 5-data-center plan](https://bulkinfrastructure.com/uploads/N01-Campus_Brochure_May24.pdf)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for CoreWeave Norway (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

494 km away

### EcoDataCenter 2

Borlänge, Dalarna County, Sweden

IT power not stated

887 km away

### Google Waltham Cross

Cheshunt, Hertfordshire, United Kingdom

88 MW IT power

1,013 km away

### Nebius Mantsala

Mantsala, Uusimaa, Finland

75 MW IT power

1,241 km away

### Microsoft Narvik Norway

Bjerkvik, Narvik, Norway

IT power not stated

Questions

## CoreWeave Norway, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is CoreWeave Norway?

CoreWeave Norway is in Øvrebø, Agder, Norway, at Stølevegen 39, 4715 Øvrebø, Norway. Epoch AI publishes its coordinates as 58.2588, 7.8984.

### Who owns CoreWeave Norway?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does CoreWeave Norway use?

Epoch AI estimates its IT power at 42 MW as of August 15, 2026, and its total facility power at 55 MW.

### Is CoreWeave Norway operating?

Yes. Epoch AI counts 1 building operating as of August 15, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).