# Crusoe Abilene Expansion, Abilene

Crusoe Abilene Expansion is an SI data center in Abilene, Texas, United States, owned by Microsoft and used by Microsoft (Epoch AI rates this likely). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of January 15, 2026, and projects 672 MW by November 11, 2027. Its public timeline starts on November 2, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Crusoe Abilene Expansion on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Abilene, Texas, United States

Address
:   5502 Spinks Rd, Abilene, TX 79601

Coordinates
:   32.4919° N, 99.7820° W

Owner
:   Microsoft

Users
:   Microsoft (Epoch AI rates this likely)

Projected
:   672 MW IT power by November 11, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Abilene campus for Microsoft: 900 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of January 15, 2026.

[Open it in the Ledger](https://siscto.si/ledger/abilene-microsoft-campus/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/crusoe-abilene-expansion/)

### Lights On

NASA's night imagery read 70.2 of 100 over this site in October 2026, against 11.1 in October 2018, the first month read. Against a year before: +16.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=crusoe-abilene-expansion#view)

## Dated, from the public record

Epoch AI's dated notes on Crusoe Abilene Expansion, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Nov 2, 2025**

> Land clearing begins for Buildings 1-2.

No IT power yet (0 operating)

**Jan 15, 2026**

> Land clearing continues.

No IT power yet (0 operating)

**Sep 17, 2027 (Projection)**

> Building 1 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).

336 MW (1 operating)

**Nov 11, 2027 (Projection)**

> Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).

672 MW (2 operating)

Adopt a site

## Watch Crusoe Abilene Expansion

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them](https://www.bloomberg.com/news/articles/2026-03-06/oracle-and-openai-end-plans-to-expand-flagship-data-center)

- [Air Permit Application for the buildings, featuring blueprints on p.391](https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/400428-ac.pdf)

- [Aterio](https://www.aterio.io/blog/stargate-files-for-phase-3-expansion-in-abilene)

- [Partnership Announcement with Microsoft](https://x.com/mustafasuleyman/status/2037547756320141587)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Crusoe Abilene Expansion (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

1 km away

### OpenAI Stargate Abilene

Abilene, Texas, United States

824 MW IT power

23 km away

### OpenAI Stargate Shackelford

Abilene, Texas, United States

IT power not stated

107 km away

### Anthropic Barber Lake

Colorado City, Texas, United States

IT power not stated

175 km away

### Coreweave Helios

Afton, Texas, United States

132 MW IT power

Questions

## Crusoe Abilene Expansion, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Crusoe Abilene Expansion?

Crusoe Abilene Expansion is in Abilene, Texas, United States, at 5502 Spinks Rd, Abilene, TX 79601. Epoch AI publishes its coordinates as 32.4919, -99.7820.

### Who owns Crusoe Abilene Expansion?

Epoch AI lists Microsoft as its owner and Microsoft (Epoch AI rates this likely) as its user.

### How much power does Crusoe Abilene Expansion use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 672 MW of IT power by November 11, 2027.

### Is Crusoe Abilene Expansion operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).