# DayOne Nusajaya SI Data Center, Johor Bahru, Malaysia | $SIS

> DayOne Nusajaya is an SI data center in Johor Bahru, Johor, Malaysia. Epoch AI puts its IT power at 473 MW (Oct 2, 2026). Map, dated timeline and sources.

Source: https://siscto.si/power-map/dayone-nusajaya/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. DayOne Nusajaya

Power Map · Operating

# DayOne Nusajaya, Johor Bahru

DayOne Nusajaya is an SI data center in Johor Bahru, Johor, Malaysia. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 473 MW as of October 2, 2026, with 10 buildings operating. Its public timeline starts on October 1, 2023.

IT power
:   473 MW (Oct 2, 2026)

Facility power
:   662 MW

Status
:   Operating

Buildings operating
:   10

Where it is

## The site and its facts

DayOne Nusajaya on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Johor Bahru, Johor, Malaysia

Address
:   Not public

Coordinates
:   1.4294° N, 103.5978° E

Owner
:   Not public

Chips
:   H100, B300

Compute
:   About 583,837 H100 equivalents (Epoch AI estimate, Oct 2, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day, a change of -0.2 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/dayone-nusajaya/)

### Lights On

NASA's night imagery read 97.1 of 100 over this site in October 2026, against 58.9 in October 2018, the first month read. Against a year before: +9.6 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=dayone-nusajaya#view)

## Dated, from the public record

Epoch AI's dated notes on DayOne Nusajaya, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 1, 2023**

> Construction for Building 1-2 is underway.

No IT power yet (0 operating)

**Dec 31, 2024**

> Buildings 1-2 are fully operational. Based on DayOne [reporting](https://web.archive.org/web/20241231165420/https://dayonedc.com/) that 120 MW is in operation in Johor, with [50 MW](https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872) towards these two buildings. The date is based on the earliest available archived webpage, so this may have happened earlier.

50 MW (2 operating)

**Jan 22, 2026**

> Buildings 3-6 are operational, based on them looking complete. DayOne [reported](https://archive.is/8CFXN) that 390 MW is "in service" in Johor as of Jan 30. This is across both Nusajaya (including Phase 1, which we don't include here) and Kempas, but Nusajaya is the vast majority of capacity at this time. Building 7 and 8 look almost complete, while Building 9 and 10 shells are still under construction.

240 MW (6 operating)

**Apr 5, 2026**

> Buildings 7-10 look mostly complete, but there is still some construction work at the edges.

240 MW (6 operating)

**Oct 2, 2026**

> Buildings 7-10 are operational. Judging by their state in April 2026, we expect 3 months to finish construction and another 3 months to ramp to full capacity.

473 MW (10 operating)

Adopt a site

## Watch DayOne Nusajaya

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [News of Phase 2 operation](https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872)

- [Archived DayOne website - "120 MW in operation" in Johor](https://web.archive.org/web/20241231165420/https://dayonedc.com/)

- [Archived DayOne website - 390 MW "in service" in Johor](https://web.archive.org/web/20260314134756/https://dayonedc.com/market/johor)

- [Financial Times report that Alibaba and ByteDance are training AI models in southeast Asia](https://www.ft.com/content/96fe9898-a3a4-4a33-be1d-da06bdb6cb2b)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for DayOne Nusajaya (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

20 km away

### DayOne Kempas

Kempas, Johor, Malaysia

421.7 MW IT power

23 km away

### YTL Johor

Kulai, Johor, Malaysia

113 MW IT power

36 km away

### Bridge Data Centres MY06

Kulai, Johor, Malaysia

243 MW IT power

62 km away

### Oracle Batam

Batam, Riau Islands, Indonesia

72 MW IT power

Questions

## DayOne Nusajaya, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is DayOne Nusajaya?

DayOne Nusajaya is in Johor Bahru, Johor, Malaysia. Epoch AI publishes its coordinates as 1.4294, 103.5978.

### Who owns DayOne Nusajaya?

Epoch AI does not name an owner yet.

### How much power does DayOne Nusajaya use?

Epoch AI estimates its IT power at 473 MW as of October 2, 2026, and its total facility power at 662 MW.

### Is DayOne Nusajaya operating?

Yes. Epoch AI counts 10 buildings operating as of October 2, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).