# EcoDataCenter 2 SI Data Center, Borlänge, Sweden | $SIS

> EcoDataCenter 2 is an SI data center in Borlänge, Dalarna County, Sweden, owned by Mistral AI. Epoch AI tracks it as under construction. Map and timeline.

Source: https://siscto.si/power-map/ecodatacenter-2/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. EcoDataCenter 2

Power Map · Under construction

# EcoDataCenter 2, Borlänge

EcoDataCenter 2 is an SI data center in Borlänge, Dalarna County, Sweden, owned by Mistral AI and used by Mistral AI. [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of August 17, 2026, and projects 48 MW by June 30, 2028. Its public timeline starts on September 1, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

EcoDataCenter 2 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Borlänge, Dalarna County, Sweden

Address
:   Kvarnsvedsvägen 420, 784 66 Borlänge, Sweden

Coordinates
:   60.5263° N, 15.4170° E

Owner
:   Mistral AI

Users
:   Mistral AI

Projected
:   48 MW IT power by June 30, 2028 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

EcoDataCenter 2, Borlänge: No power figure was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of August 17, 2026.

[Open it in the Ledger](https://siscto.si/ledger/ecodatacenter-2-borlange/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.1 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/ecodatacenter-2/)

### Lights On

NASA's night imagery read 12.3 of 100 over this site in October 2026, against 15.1 in October 2018, the first month read. Against a year before: +0.5 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=ecodatacenter-2#view)

## Dated, from the public record

Epoch AI's dated notes on EcoDataCenter 2, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Sep 1, 2025**

> Land clearing begins. [EcoDataCenter](https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556) announces on September 24th that construction has started on EcoDataCenter 2, so we model it as started from the beginning of the month.

No IT power yet (0 operating)

**May 9, 2026**

> Buildings 1 and 2 still under construction. The first two building shells are visibly well into construction, with lots of additional ground work visible all across the campus. Based on high-resolution satellite imagery from this date.

No IT power yet (0 operating)

**Aug 17, 2026**

> Buildings 1 and 2 look fully roofed, with active construction showing cooling and power equipment still being installed. Buildings 3-4 look like their foundations have been laid out and are early in construction.

No IT power yet (0 operating)

**Jun 30, 2027 (Projection)**

> Buildings 1-2 operational. Based on [Bravida](https://www.bravida.se/en/press/press-releases/2026/bravida-carries-out-installations-in-two-data-centres-for-around-sek-200-million/) stating that installation work in two EcoDataCenter data centers in Borlänge is expected to be completed by mid-2027, together with [EcoDataCenter Annual Report 2025](https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf) identifying B1 and B2 as the first two buildings under construction.

24 MW (2 operating)

**Jun 30, 2028 (Projection)**

> Buildings 3-4 operational. Based on [Bravida](https://www.bravida.se/en/press/press-releases/2026/bravida-awarded-sek-650-million-installation-contract-in-borlange-by-ecodatacenter/) stating that installation work in another EcoDataCenter data center continues through Q1 2028, combined with permit documentation showing four data center buildings under construction by May 2026.

48 MW (4 operating)

Adopt a site

## Watch EcoDataCenter 2

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [EcoDataCenter 2 campus overview](https://ecodatacenter.tech/data-center/ecodatacenter2)

- [EcoDataCenter 2025 Annual Report](https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf)

- [EcoDataCenter groundbreaking announcement](https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556)

- [Mistral AI partnership announcement](https://ecodatacenter.tech/press/mistral-ai-and-ecodatacenter-partner-to-build-ai-focused-data-center-in-sweden-3431886)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for EcoDataCenter 2 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

494 km away

### CoreWeave Norway

Øvrebø, Agder, Norway

42 MW IT power

537 km away

### Nebius Mantsala

Mantsala, Uusimaa, Finland

75 MW IT power

901 km away

### Microsoft Narvik Norway

Bjerkvik, Narvik, Norway

IT power not stated

1,366 km away

### Google Waltham Cross

Cheshunt, Hertfordshire, United Kingdom

88 MW IT power

Questions

## EcoDataCenter 2, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is EcoDataCenter 2?

EcoDataCenter 2 is in Borlänge, Dalarna County, Sweden, at Kvarnsvedsvägen 420, 784 66 Borlänge, Sweden. Epoch AI publishes its coordinates as 60.5263, 15.4170.

### Who owns EcoDataCenter 2?

Epoch AI lists Mistral AI as its owner and Mistral AI as its user.

### How much power does EcoDataCenter 2 use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 48 MW of IT power by June 30, 2028.

### Is EcoDataCenter 2 operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).