# Goodnight SI Data Center, Claude, TX | $SIS

> Goodnight is an SI data center in Claude, Texas, owned by Google. Epoch AI tracks it as under construction. Map, timeline, sources and its watcher.

Source: https://siscto.si/power-map/goodnight/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Goodnight

Power Map · Under construction

# Goodnight, Claude

Goodnight is an SI data center in Claude, Texas, United States, owned by Google (Epoch AI rates this speculative) and used by Google DeepMind (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of April 16, 2026, and projects 1,006 MW by October 1, 2027. Its public timeline starts on May 19, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Goodnight on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Claude, Texas, United States

Address
:   10001 Lima Rd, Claude, TX 79019

Coordinates
:   35.0197° N, 101.3086° W

Owner
:   Google (Epoch AI rates this speculative)

Users
:   Google DeepMind (Epoch AI rates this speculative)

Energy
:   Serena

Builders
:   Crusoe, Hoffman

Projected
:   1,006 MW IT power by October 1, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/goodnight/)

### Lights On

NASA's night imagery read 80.5 of 100 over this site in October 2026, against 0.3 in October 2018, the first month read. Against a year before: +53.9 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=goodnight#view)

## Dated, from the public record

Epoch AI's dated notes on Goodnight, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**May 19, 2025**

> Land clearing begins

No IT power yet (0 operating)

**Oct 16, 2025**

> Building 1 and 2 under construction.

No IT power yet (0 operating)

**Dec 23, 2025**

> Construction on Building 1 and 2 looks about halfway to completion. Foundations and utility trenches are visible for Building 3-4. Building 5-6 have an outline. The substation appears to be expanding.

No IT power yet (0 operating)

**Apr 16, 2026**

> Progress is made on all buildings, Building 1 and 2 specically have begun to install cooling structures. The substation expansion seems to be nearing completion.

No IT power yet (0 operating)

**Mar 15, 2027 (Projection)**

> Building 1 operational. This [regulatory document](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025027064) lists the completion date for Building 1 as 2026-09-12, the current status suggests this estimate will not be met. Based on the timeline seen at the Abilene,Texas site for the same building styles and the most recent imaged status, we estimate operability to occur 6 months after the state seen in Sept 2026.

103 MW (1 operating)

**May 15, 2027 (Projection)**

> Building 2 operational. The completion date for [Building 2 Tenant Improvement](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025027065) is 2026-11-07, about 2 months later than Building 1. We therefore add 2 months to the Building 1 operational date.

206 MW (2 operating)

**Oct 1, 2027 (Projection)**

> 6 buildings are operational. This is based on: 1. A [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026010861) for Building 6 with a completion date of 2027-07-30. Normally there is a follow-up filing for "tenant improvement" which involves building the interior, with a completion date 1-3 months after the initial filing. 2. A project deadline of EOY 2027 in the [original tax abatement agreement](https://www.co.armstrong.tx.us/upload/page/5361/Phase%201%20Tax%20Abatement%20Agreement%20-%20Signed.pdf) 3. The similar 8-building project in Abilene taking an estimated 2 years and 2 months.

1,006 MW (6 operating)

Adopt a site

## Watch Goodnight

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Amended tax abatement agreement, with updated blueprints on p.46](https://www.co.armstrong.tx.us/upload/page/5361/Amended_Restated_Consolidated%20Second%20Property%20Tax%20Abatement%20Agreement%20%20GNDC1_ArmstrongCounty.pdf)

- [Original tax abatement agreement, with original blueprints and specs on the last page](https://drive.google.com/file/d/1ky5HhuhU8_JADNB2GziWa4WDRbTU4qtO/view?usp=sharing)

- [TABS database, with "Llano" data centers in the city of Claude](https://www.tdlr.texas.gov/TABS/Search/)

- [Press release reports Google investing in a new data center in Armstrong County](https://www.reuters.com/business/google-invest-40-billion-new-data-centers-texas-bloomberg-news-reports-2025-11-14/)

- [Clean Air Act Initial Prevention of Significant Deterioration permit application.](https://drive.google.com/file/d/1sI8t1MzjDTAEnn-yY4zv3SiiTCpruzSQ/view?usp=drive_link)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Goodnight (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

144 km away

### Coreweave Helios

Afton, Texas, United States

132 MW IT power

294 km away

### Anthropic Barber Lake

Colorado City, Texas, United States

IT power not stated

313 km away

### OpenAI Stargate Abilene

Abilene, Texas, United States

824 MW IT power

315 km away

### Crusoe Abilene Expansion

Abilene, Texas, United States

IT power not stated

Questions

## Goodnight, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Goodnight?

Goodnight is in Claude, Texas, United States, at 10001 Lima Rd, Claude, TX 79019. Epoch AI publishes its coordinates as 35.0197, -101.3086.

### Who owns Goodnight?

Epoch AI lists Google (Epoch AI rates this speculative) as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

### How much power does Goodnight use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,006 MW of IT power by October 1, 2027.

### Is Goodnight operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).
