# Google Cedar Rapids, Cedar Rapids

Google Cedar Rapids is an SI data center in Cedar Rapids, Iowa, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of April 16, 2026, and projects 261 MW by May 23, 2027. Its public timeline starts on June 14, 2024.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Google Cedar Rapids on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Cedar Rapids, Iowa, United States

Address
:   5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404

Coordinates
:   41.9170° N, 91.7224° W

Owner
:   Google

Users
:   Google DeepMind (Epoch AI rates this speculative)

Projected
:   261 MW IT power by May 23, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.4 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/google-cedar-rapids/)

### Lights On

NASA's night imagery read 59.4 of 100 over this site in October 2026, against 16.3 in October 2018, the first month read. Against a year before: +22.3 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=google-cedar-rapids#view)

## Dated, from the public record

Epoch AI's dated notes on Google Cedar Rapids, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jun 14, 2024**

> Land clearing begins.

No IT power yet (0 operating)

**Oct 27, 2025**

> Building 1 cooling towers and generators starting to be put in place. There's a foundation for Building 2 and 3.

No IT power yet (0 operating)

**Dec 29, 2025**

> About half of Building 1 generators are in place. Building 2 roofing has started - about where Google Omaha Building 3 was on 2025-03-16.

No IT power yet (0 operating)

**Apr 16, 2026**

> Building 1's generators are still only about halfway in place, and ~1/2 the cooling towers are still under construction. Building 2 roofing has been completed, and visible foundations have been built for cooling towers and generators.

No IT power yet (0 operating)

**Dec 31, 2026 (Projection)**

> Building 1 is operational. There is still work to be done since April, and Q4 2026 operational estimate was based on visible progress then.

87 MW (1 operating)

**Feb 22, 2027 (Projection)**

> Building 2 is operational. Based on Google Omaha Building 3 taking about 14 months from starting the roof to operation.

174 MW (2 operating)

**May 23, 2027 (Projection)**

> Building 3 is operational. Earlier satellite images suggest it was about 3 months behind Building 2.

261 MW (3 operating)

Adopt a site

## Watch Google Cedar Rapids

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [MISO new load announcements](https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf)

- [Permit application](https://www.govonlinesaas.com/LCPH/EasyAir/Public/EnSuite/Shared/Pages/util/StreamDoc.ashx?id=260&type=attachment)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Google Cedar Rapids (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

2 km away

### QTS Cedar Rapids

Cedar Rapids, Iowa, United States

IT power not stated

178 km away

### Microsoft Project Osmium

Cumming, Iowa, United States

190 MW IT power

324 km away

### Microsoft Fairwater Wisconsin

Mount Pleasant, Wisconsin, United States

369 MW IT power

331 km away

### Meta Rosemount

Rosemount, Minnesota, United States

178 MW IT power

Questions

## Google Cedar Rapids, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Google Cedar Rapids?

Google Cedar Rapids is in Cedar Rapids, Iowa, United States, at 5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404. Epoch AI publishes its coordinates as 41.9170, -91.7224.

### Who owns Google Cedar Rapids?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

### How much power does Google Cedar Rapids use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 261 MW of IT power by May 23, 2027.

### Is Google Cedar Rapids operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).