# Google Council Bluffs (East), Council Bluffs, IA | $SIS

> Google Council Bluffs (East) is an SI data center in Council Bluffs, Iowa, owned by Google. Epoch AI puts its IT power at 237 MW (Jul 7, 2026).

Source: https://siscto.si/power-map/google-council-bluffs-east/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Google Council Bluffs (East)

Power Map · Operating

# Google Council Bluffs (East), Council Bluffs

Google Council Bluffs (East) is an SI data center in Council Bluffs, Iowa, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 237 MW as of July 7, 2026, with 3 buildings operating. Its public timeline starts on September 6, 2022.

IT power
:   237 MW (Jul 7, 2026)

Facility power
:   284 MW

Status
:   Operating

Buildings operating
:   3

Where it is

## The site and its facts

Google Council Bluffs (East) on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Council Bluffs, Iowa, United States

Address
:   10410 Bunge Ave, Council Bluffs, IA 51503

Coordinates
:   41.1728° N, 95.7969° W

Owner
:   Google

Users
:   Google DeepMind (Epoch AI rates this speculative)

Chips
:   TPU v5e, TPU v6e, TPU v5p, TPU v7

Compute
:   About 255,685 H100 equivalents (Epoch AI estimate, Jul 7, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day, a change of -0.7 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/google-council-bluffs-east/)

### Lights On

NASA's night imagery read 34.9 of 100 over this site in October 2026, against 29.2 in October 2018, the first month read. Against a year before: +0.7 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=google-council-bluffs-east#view)

## Dated, from the public record

Epoch AI's dated notes on Google Council Bluffs (East), quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Sep 6, 2022**

> Land clearing begins for east buildings

No IT power yet (0 operating)

**Nov 19, 2024**

> Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete.

79 MW (1 operating)

**Jun 15, 2025**

> Building 2 is operational. Assuming it takes 3 months after generators and cooling towers are finished, similar to Building 1.

158 MW (2 operating)

**Jul 19, 2025**

> Land clearing begins in the southwest, suggesting more buildings are planned.

158 MW (2 operating)

**Jan 11, 2026**

> Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction. There are gaps between cooling towers suggesting that more could be added. Buildings 1 and 2 are running close to full capacity, given that water vapor is coming out of 5 of 7 cooling towers for each building. The land cleared in the southwest appears to be shaped for two more similar buildings, with notches for substations.

158 MW (2 operating)

**Jul 7, 2026**

> Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.

237 MW (3 operating)

Adopt a site

## Watch Google Council Bluffs (East)

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Construction permit application form with site address](https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_A_GEN&SUBMISSION_RID=67330&SUB_FORM_RID=148293)

- [Construction permit application form with backup generator data](https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_E_EU&SUBMISSION_RID=67330&SUB_FORM_RID=148297)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Google Council Bluffs (East) (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

30 km away

### Google Papillion

Papillion, Nebraska, United States

237 MW IT power

30 km away

### Meta Sarpy

Springfield, Nebraska, United States

80 MW IT power

31 km away

### Google Omaha

Omaha, Nebraska, United States

237 MW IT power

78 km away

### Google Lincoln

Lincoln, Nebraska, United States

141 MW IT power

Questions

## Google Council Bluffs (East), answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Google Council Bluffs (East)?

Google Council Bluffs (East) is in Council Bluffs, Iowa, United States, at 10410 Bunge Ave, Council Bluffs, IA 51503. Epoch AI publishes its coordinates as 41.1728, -95.7969.

### Who owns Google Council Bluffs (East)?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

### How much power does Google Council Bluffs (East) use?

Epoch AI estimates its IT power at 237 MW as of July 7, 2026, and its total facility power at 284 MW.

### Is Google Council Bluffs (East) operating?

Yes. Epoch AI counts 3 buildings operating as of July 7, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).