# Google Kansas City East, Kansas City, Missouri | $SIS

> Google Kansas City East is an SI data center in Kansas City, Missouri, owned by Google. Epoch AI puts its IT power at 105 MW (Aug 1, 2026). Map and timeline.

Source: https://siscto.si/power-map/google-kansas-city-east/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Google Kansas City East

Power Map · Operating

# Google Kansas City East, Kansas City

Google Kansas City East is an SI data center in Kansas City, Missouri, United States, owned by Google. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 105 MW as of August 1, 2026, with 1 building operating. Its public timeline starts on January 1, 2024.

IT power
:   105 MW (Aug 1, 2026)

Facility power
:   126 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

Google Kansas City East on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Kansas City, Missouri, United States

Address
:   Not public

Coordinates
:   39.1796° N, 94.4642° W

Owner
:   Google

Compute
:   About 202,628 H100 equivalents (Epoch AI estimate, Aug 1, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.8 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/google-kansas-city-east/)

### Lights On

NASA's night imagery read 64.6 of 100 over this site in October 2026, against 40.0 in October 2018, the first month read. Against a year before: -1.5 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=google-kansas-city-east#view)

## Dated, from the public record

Epoch AI's dated notes on Google Kansas City East, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jan 1, 2024**

> Land clearing has begun for the site

No IT power yet (0 operating)

**Mar 1, 2024**

> Foundation work begins on Building 1

No IT power yet (0 operating)

**Oct 1, 2024**

> Foundation work begins on Building 2. Building 1 roof is fully black.

No IT power yet (0 operating)

**Jul 1, 2025**

> Foundation work begins for Building 3. Building 1 generators seem complete.

No IT power yet (0 operating)

**Nov 1, 2025**

> Foundation work begins for Building 4. Building 2 roof is almost complete, and construction appears to have started on cooling. Building 1 cooling construction continues, and the substation right next to it seems finished as well.

No IT power yet (0 operating)

**Apr 16, 2026**

> Building 1 is almost complete, with only cooling needing 4 more fans. Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete. Building 3's roof is almost complete, and construction has started on generators and cooling. A clear foundation has been cleared for Building 4, though no construction has begun.

No IT power yet (0 operating)

**Aug 1, 2026**

> Building 1 operational. Estimated based on present construction progress and typical timelines.

105 MW (1 operating)

Adopt a site

## Watch Google Kansas City East

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Hunt Midwest Business Center press release linking data center with Google](https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/)

- [DCD article on the site](https://www.datacenterdynamics.com/en/news/google-files-project-plan-for-data-center-in-kansas-city-missouri/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Google Kansas City East (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

249 km away

### Google Council Bluffs (East)

Council Bluffs, Iowa, United States

237 MW IT power

258 km away

### Meta Sarpy

Springfield, Nebraska, United States

80 MW IT power

260 km away

### Google Papillion

Papillion, Nebraska, United States

237 MW IT power

264 km away

### Microsoft Project Osmium

Cumming, Iowa, United States

190 MW IT power

Questions

## Google Kansas City East, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Google Kansas City East?

Google Kansas City East is in Kansas City, Missouri, United States. Epoch AI publishes its coordinates as 39.1796, -94.4642.

### Who owns Google Kansas City East?

Epoch AI lists Google as its owner.

### How much power does Google Kansas City East use?

Epoch AI estimates its IT power at 105 MW as of August 1, 2026, and its total facility power at 126 MW.

### Is Google Kansas City East operating?

Yes. Epoch AI counts 1 building operating as of August 1, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).