# Google New Albany SI Data Center, New Albany, OH | $SIS

> Google New Albany is an SI data center in New Albany, Ohio, owned by Google. Epoch AI puts its IT power at 333 MW (May 18, 2026). Map, timeline and sources.

Source: https://siscto.si/power-map/google-new-albany/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Google New Albany

Power Map · Operating

# Google New Albany, New Albany

Google New Albany is an SI data center in New Albany, Ohio, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 333 MW as of May 18, 2026, with 4 buildings operating. Its public timeline starts on April 20, 2024.

IT power
:   333 MW (May 18, 2026)

Facility power
:   400 MW

Status
:   Operating

Buildings operating
:   4

Where it is

## The site and its facts

Google New Albany on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   New Albany, Ohio, United States

Address
:   1101 Beech Rd SW, New Albany, OH 43054

Coordinates
:   40.0568° N, 82.7677° W

Owner
:   Google

Users
:   Google DeepMind (Epoch AI rates this speculative)

Chips
:   TPU v5e, TPU v5p, TPU v6e

Compute
:   About 323,901 H100 equivalents (Epoch AI estimate, May 18, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.6 °C against the land 5 to 10 km around it by day, a change of +0.4 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/google-new-albany/)

### Lights On

NASA's night imagery read 58.1 of 100 over this site in October 2026, against 12.1 in October 2018, the first month read. Against a year before: -6.6 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=google-new-albany#view)

## Dated, from the public record

Epoch AI's dated notes on Google New Albany, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 20, 2024**

> Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.

67 MW (1 operating)

**Sep 13, 2024**

> Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete.

144 MW (2 operating)

**Jun 1, 2025**

> Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.

222 MW (3 operating)

**Oct 14, 2025**

> Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.

333 MW (4 operating)

**Jan 18, 2026**

> Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed.

333 MW (4 operating)

**Mar 12, 2026**

> Building 5 has more cooling towers installed but not complete, and the roof is almost complete.

333 MW (4 operating)

**May 18, 2026**

> Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational.

333 MW (4 operating)

Adopt a site

## Watch Google New Albany

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Draft basis of air permit for Google Omaha, a similar data center](https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing)

- [2025 Environmental Report](https://sustainability.google/reports/google-2025-environmental-report/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Google New Albany (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

4 km away

### Meta Prometheus

New Albany, Ohio, United States

471 MW IT power

6 km away

### AWS New Albany

New Albany, Ohio, United States

213 MW IT power

30 km away

### Google Columbus

Columbus, Ohio, United States

303 MW IT power

37 km away

### Google Lancaster

Lancaster, Ohio, United States

137 MW IT power

Questions

## Google New Albany, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Google New Albany?

Google New Albany is in New Albany, Ohio, United States, at 1101 Beech Rd SW, New Albany, OH 43054. Epoch AI publishes its coordinates as 40.0568, -82.7677.

### Who owns Google New Albany?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

### How much power does Google New Albany use?

Epoch AI estimates its IT power at 333 MW as of May 18, 2026, and its total facility power at 400 MW.

### Is Google New Albany operating?

Yes. Epoch AI counts 4 buildings operating as of May 18, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).