# Google Waltham Cross, Cheshunt, United Kingdom | $SIS

> Google Waltham Cross is an SI data center in Cheshunt, Hertfordshire, United Kingdom, owned by Google. Epoch AI puts its IT power at 88 MW (Apr 23, 2026).

Source: https://siscto.si/power-map/google-waltham-cross/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Google Waltham Cross

Power Map · Operating

# Google Waltham Cross, Cheshunt

Google Waltham Cross is an SI data center in Cheshunt, Hertfordshire, United Kingdom, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 88 MW as of April 23, 2026, with 1 building operating. Its public timeline starts on January 1, 2024.

IT power
:   88 MW (Apr 23, 2026)

Facility power
:   124 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

Google Waltham Cross on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Cheshunt, Hertfordshire, United Kingdom

Address
:   Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH

Coordinates
:   51.6954° N, 0.0490° W

Owner
:   Google

Users
:   Google DeepMind (Epoch AI rates this speculative)

Chips
:   TPU v6e

Compute
:   About 123,800 H100 equivalents (Epoch AI estimate, Apr 23, 2026)

Energy
:   Shell Energy Europe, Engie

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/google-waltham-cross/)

### Lights On

NASA's night imagery read 34.1 of 100 over this site in October 2026, against 26.6 in October 2018, the first month read. Against a year before: +0.7 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=google-waltham-cross#view)

## Dated, from the public record

Epoch AI's dated notes on Google Waltham Cross, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jan 1, 2024**

> Land clearing begins (Sentinel-2 imagery).

No IT power yet (0 operating)

**Sep 1, 2025**

> Building complete and operational; full buildout reached. Sentinel-2 imagery shows the building finished with components installed and cars in the car park. Confirmed by Google's official blog post announcing the Waltham Cross data centre opening (https://blog.google/company-news/inside-google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/).

88 MW (1 operating)

**Apr 23, 2026**

> Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image; no capacity change since September 2025.

88 MW (1 operating)

Adopt a site

## Watch Google Waltham Cross

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Google, Waltham Cross data centre page](https://datacenters.google/locations/waltham-cross/)

- [Google opening announcement (Sept 2025)](https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy)

- [Project Saracen scoping report (Broxbourne planning application ref 07/18/1181/O)](https://www.broxbourne.gov.uk/downloads/file/51/project-saracen-scoping-report-for-submission-full-13-08-18-compressed-v2)

- [Planning application description (CPRE Hertfordshire)](https://www.cpreherts.org.uk/resources/land-at-maxwells-farm-west-great-cambridge-road-cheshunt-hertfordshire/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Google Waltham Cross (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

887 km away

### CoreWeave Norway

Øvrebø, Agder, Norway

42 MW IT power

1,366 km away

### EcoDataCenter 2

Borlänge, Dalarna County, Sweden

IT power not stated

1,676 km away

### Start Campus Sines Data Campus

Sines, Setúbal, Portugal

33 MW IT power

1,838 km away

### Nebius Mantsala

Mantsala, Uusimaa, Finland

75 MW IT power

Questions

## Google Waltham Cross, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Google Waltham Cross?

Google Waltham Cross is in Cheshunt, Hertfordshire, United Kingdom, at Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH. Epoch AI publishes its coordinates as 51.6954, -0.0490.

### Who owns Google Waltham Cross?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

### How much power does Google Waltham Cross use?

Epoch AI estimates its IT power at 88 MW as of April 23, 2026, and its total facility power at 124 MW.

### Is Google Waltham Cross operating?

Yes. Epoch AI counts 1 building operating as of April 23, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).
