# The Power Map: Every SI Data Center on Earth | $SIS

> Every SI data center that public data confirms, on one world map: 96 sites in 12 countries, with owner, town, status and IT power from Epoch AI.

Source: https://siscto.si/power-map/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. Power Map

The Power Map · SI data centers

# Every SI data center, on one map

The Power Map shows every SI data center that public data confirms: 96 sites in 12 countries, from Anthropic-Amazon New Carlisle in Indiana to the builds in Johor, Abu Dhabi and Ulanqab. Each site has its owner, its town, its status and its IT power where [Epoch AI](https://epoch.ai/data/ai-data-centers)'s public tracker states it, with the date and the sources. Drag, zoom and filter the map, open any site, and adopt one to watch it.

SI data centers
:   96

Countries
:   12

IT power
:   15,122 MW

Operating
:   76

Live map

## The SI compute race, mapped

Each dot is a site, sized by its IT power and colored by its status. Clusters open as you zoom. Pick an owner, a country or a status and the totals follow.

- [Anthropic-Amazon New Carlisle · Amazon · New Carlisle, Indiana, United States · 1,037 MW (Oct 19, 2026) · Operating, expanding](https://siscto.si/power-map/anthropic-amazon-new-carlisle/)

- [Colossus 2 · SpaceXAI · Memphis, Tennessee, United States · 946 MW (Jun 15, 2026) · Operating, expanding](https://siscto.si/power-map/colossus-2/)

- [OpenAI Stargate Abilene · Oracle · Abilene, Texas, United States · 824 MW (Nov 1, 2026) · Operating](https://siscto.si/power-map/openai-stargate-abilene/)

- [Microsoft Fairwater Atlanta · Microsoft · Fayetteville, Georgia, United States · 636 MW (Jun 14, 2026) · Operating](https://siscto.si/power-map/microsoft-fairwater-atlanta/)

- [DayOne Nusajaya · Not public · Johor Bahru, Johor, Malaysia · 473 MW (Oct 2, 2026) · Operating](https://siscto.si/power-map/dayone-nusajaya/)

- [Meta Prometheus · Meta · New Albany, Ohio, United States · 471 MW (Aug 31, 2026) · Operating, expanding](https://siscto.si/power-map/meta-prometheus/)

- [DayOne Kempas · Not public · Kempas, Johor, Malaysia · 421.7 MW (Oct 1, 2026) · Operating](https://siscto.si/power-map/dayone-kempas/)

- [Microsoft Fairwater Wisconsin · Microsoft · Mount Pleasant, Wisconsin, United States · 369 MW (May 15, 2026) · Operating, expanding](https://siscto.si/power-map/microsoft-fairwater-wisconsin/)

- [Google Pryor (North) · Google · Pryor, Oklahoma, United States · 368 MW (Sep 6, 2026) · Operating](https://siscto.si/power-map/google-pryor-north/)

- [Colossus 1 · SpaceXAI · Memphis, Tennessee, United States · 340 MW (Jun 15, 2026) · Operating](https://siscto.si/power-map/colossus-1/)

- [Google New Albany · Google · New Albany, Ohio, United States · 333 MW (May 18, 2026) · Operating](https://siscto.si/power-map/google-new-albany/)

- [Google Columbus · Google · Columbus, Ohio, United States · 303 MW (Aug 5, 2026) · Operating, expanding](https://siscto.si/power-map/google-columbus/)

- [Amazon Madison Mega Site · Amazon · Canton, Mississippi, United States · 284 MW (Jun 4, 2026) · Operating, expanding](https://siscto.si/power-map/amazon-madison-mega-site/)

- [CoreWeave Denton TX · CoreWeave · Denton, Texas, United States · 262 MW (Sep 1, 2026) · Operating, expanding](https://siscto.si/power-map/coreweave-denton-tx/)

- [Bridge Data Centres MY06 · ByteDance · Kulai, Johor, Malaysia · 243 MW (Sep 13, 2026) · Operating](https://siscto.si/power-map/bridge-data-centres-my06/)

- [Google Bristow · Google · Bristow, Virginia, United States · 238 MW (May 20, 2026) · Operating](https://siscto.si/power-map/google-bristow/)

- [QTS Richmond 1 · Not public · Sandston, Virginia, United States · 238 MW (Feb 13, 2026) · Operating](https://siscto.si/power-map/qts-richmond-1/)

- [Google Council Bluffs (East) · Google · Council Bluffs, Iowa, United States · 237 MW (Jul 7, 2026) · Operating](https://siscto.si/power-map/google-council-bluffs-east/)

- [Google Omaha · Google · Omaha, Nebraska, United States · 237 MW (Jun 30, 2026) · Operating, expanding](https://siscto.si/power-map/google-omaha/)

- [Google Papillion · Google · Papillion, Nebraska, United States · 237 MW (May 4, 2026) · Operating](https://siscto.si/power-map/google-papillion/)

- [Amazon Ridgeland · Amazon · Ridgeland, Mississippi, United States · 228 MW (May 15, 2026) · Operating, expanding](https://siscto.si/power-map/amazon-ridgeland/)

- [VNET Bayin Ulanqab · ByteDance · Ulanqab, Inner Mongolia, China · 221 MW (May 6, 2026) · Operating, expanding](https://siscto.si/power-map/vnet-bayin-ulanqab/)

- [AWS New Albany · Amazon · New Albany, Ohio, United States · 213 MW (May 18, 2026) · Operating, expanding](https://siscto.si/power-map/aws-new-albany/)

- [Anthropic Lake Mariner · AI XPV Platform · Barker, New York, United States · 210 MW (Oct 31, 2026) · Operating, expanding](https://siscto.si/power-map/anthropic-lake-mariner/)

- [Microsoft Goodyear · Microsoft · Goodyear, Arizona, United States · 202 MW (Apr 27, 2026) · Operating](https://siscto.si/power-map/microsoft-goodyear/)

- [Huawei Wuhu · Huawei · Wuhu, Anhui, China · 197 MW (Nov 1, 2026) · Operating, expanding](https://siscto.si/power-map/huawei-wuhu/)

- [Microsoft Project Osmium · Microsoft · Cumming, Iowa, United States · 190 MW (Jun 16, 2026) · Operating](https://siscto.si/power-map/microsoft-project-osmium/)

- [Google Mesa · Google · Mesa, Arizona, United States · 183 MW (Aug 15, 2026) · Operating](https://siscto.si/power-map/google-mesa/)

- [Meta-QTS Hillsboro 2 · Meta · Hillsboro, Oregon, United States · 180 MW (Apr 17, 2026) · Operating](https://siscto.si/power-map/meta-qts-hillsboro-2/)

- [QTS Richmond 2 · Not public · Sandston, Virginia, United States · 180 MW (May 14, 2026) · Operating](https://siscto.si/power-map/qts-richmond-2/)

- [Meta Jeffersonville · Meta · Jeffersonville, Indiana, United States · 178 MW (Jun 4, 2026) · Operating](https://siscto.si/power-map/meta-jeffersonville/)

- [Meta Rosemount · Meta · Rosemount, Minnesota, United States · 178 MW (Jun 19, 2026) · Operating](https://siscto.si/power-map/meta-rosemount/)

- [Meta Temple · Meta · Temple, Texas, United States · 178 MW (Sep 30, 2026) · Operating](https://siscto.si/power-map/meta-temple/)

- [Huawei Horinger · Huawei · Hohhot, Inner Mongolia, China · 169.9 MW (Aug 18, 2026) · Operating, expanding](https://siscto.si/power-map/huawei-horinger/)

- [Alibaba Zhangbei · Alibaba · Zhangbei, Hebei, China · 169 MW (Jan 3, 2026) · Operating](https://siscto.si/power-map/alibaba-zhangbei/)

- [Google Storey County · Google · Clark, Nevada, United States · 161 MW (Apr 13, 2026) · Operating, expanding](https://siscto.si/power-map/google-storey-county/)

- [Google The Dalles · Google · The Dalles, Oregon, United States · 154 MW (Apr 29, 2026) · Operating](https://siscto.si/power-map/google-the-dalles/)

- [Meta Montgomery · Meta · Montgomery, Alabama, United States · 153 MW (Jun 18, 2026) · Operating, expanding](https://siscto.si/power-map/meta-montgomery/)

- [Meta Cheyenne · Meta · Cheyenne, Wyoming, United States · 152 MW (Jul 25, 2026) · Operating, expanding](https://siscto.si/power-map/meta-cheyenne/)

- [Meta Kuna · Meta · Kuna, Idaho, United States · 152 MW (Jun 1, 2026) · Operating](https://siscto.si/power-map/meta-kuna/)

- [Meta Huntsville · Meta · Huntsville, Alabama, United States · 146 MW (Jun 2, 2026) · Operating](https://siscto.si/power-map/meta-huntsville/)

- [QTS Richmond 3 · Not public · Sandston, Virginia, United States · 144 MW (May 14, 2026) · Operating, expanding](https://siscto.si/power-map/qts-richmond-3/)

- [Google Lincoln · Google · Lincoln, Nebraska, United States · 141 MW (May 12, 2026) · Operating, expanding](https://siscto.si/power-map/google-lincoln/)

- [Google Lancaster · Google · Lancaster, Ohio, United States · 137 MW (Mar 12, 2026) · Operating](https://siscto.si/power-map/google-lancaster/)

- [Meta Eagle Mountain · Meta · Eagle Mountain, Utah, United States · 133 MW (May 2, 2026) · Operating](https://siscto.si/power-map/meta-eagle-mountain/)

- [Coreweave Helios · CoreWeave · Afton, Texas, United States · 132 MW (Aug 30, 2026) · Operating, expanding](https://siscto.si/power-map/coreweave-helios/)

- [Meta Aiken · Meta · Aiken, South Carolina, United States · 129 MW (Nov 5, 2026) · Operating](https://siscto.si/power-map/meta-aiken/)

- [Envision Galaxy Ulanqab · Not public · Ulanqab, Inner Mongolia, China · 118 MW (Nov 1, 2026) · Operating, expanding](https://siscto.si/power-map/envision-galaxy-ulanqab/)

- [Meta Los Lunas · Meta · Los Lunas, New Mexico, United States · 118 MW (Oct 26, 2026) · Operating, expanding](https://siscto.si/power-map/meta-los-lunas/)

- [YTL Johor · Not public · Kulai, Johor, Malaysia · 113 MW (Jul 13, 2026) · Operating, expanding](https://siscto.si/power-map/ytl-johor/)

- [AWS Berwick · Amazon · Berwick, Pennsylvania, United States · 108 MW (Aug 1, 2026) · Operating, expanding](https://siscto.si/power-map/aws-berwick/)

- [Google Kansas City East · Google · Kansas City, Missouri, United States · 105 MW (Aug 1, 2026) · Operating](https://siscto.si/power-map/google-kansas-city-east/)

- [Google Midlothian · Google · Midlothian, Texas, United States · 103 MW (Jul 1, 2026) · Operating](https://siscto.si/power-map/google-midlothian/)

- [Google Waltham Cross · Google · Cheshunt, Hertfordshire, United Kingdom · 88 MW (Apr 23, 2026) · Operating](https://siscto.si/power-map/google-waltham-cross/)

- [Meta Gallatin · Meta · Gallatin, Tennessee, United States · 87 MW (Aug 24, 2026) · Operating](https://siscto.si/power-map/meta-gallatin/)

- [STACK Infrastructure NVA02 · Not public · Manassas, Virginia, United States · 85 MW (Feb 14, 2026) · Operating, expanding](https://siscto.si/power-map/stack-infrastructure-nva02/)

- [CoreWeave Chester VA · CoreWeave · Chester, Virginia, United States · 82 MW (May 20, 2026) · Operating, expanding](https://siscto.si/power-map/coreweave-chester-va/)

- [Meta Sarpy · Meta · Springfield, Nebraska, United States · 80 MW (Aug 2, 2026) · Operating](https://siscto.si/power-map/meta-sarpy/)

- [Google Arcola · Google · Arcola, Virginia, United States · 77 MW (Jun 16, 2026) · Operating](https://siscto.si/power-map/google-arcola/)

- [Google Red Oak · Google · Red Oak, Texas, United States · 77 MW (Feb 6, 2026) · Operating, expanding](https://siscto.si/power-map/google-red-oak/)

- [Microsoft SAT40 · Microsoft · San Antonio, Texas, United States · 75 MW (Feb 4, 2026) · Operating](https://siscto.si/power-map/microsoft-sat40/)

- [Nebius Mantsala · Nebius · Mantsala, Uusimaa, Finland · 75 MW (Jun 29, 2026) · Operating, expanding](https://siscto.si/power-map/nebius-mantsala/)

- [Oracle Batam · Oracle · Batam, Riau Islands, Indonesia · 72 MW (May 6, 2026) · Operating](https://siscto.si/power-map/oracle-batam/)

- [CoreWeave Ellendale ND · CoreWeave · Ellendale, North Dakota, United States · 68 MW (Jun 30, 2026) · Operating, expanding](https://siscto.si/power-map/coreweave-ellendale-nd/)

- [CoreWeave Marble NC · CoreWeave · Marble, North Carolina, United States · 65 MW (May 6, 2026) · Operating](https://siscto.si/power-map/coreweave-marble-nc/)

- [Stream Phoenix · Not public · Goodyear, Arizona, United States · 64 MW (May 1, 2026) · Operating, expanding](https://siscto.si/power-map/stream-phoenix/)

- [Core42 Lake Mariner · Core42 · Barker, New York, United States · 58 MW (Jul 23, 2026) · Operating](https://siscto.si/power-map/core42-lake-mariner/)

- [Microsoft-Nebius New Jersey · Nebius · Vineland, New Jersey, United States · 50 MW (Jul 12, 2026) · Operating](https://siscto.si/power-map/microsoft-nebius-new-jersey/)

- [Microsoft SAT14 · Microsoft · San Antonio, Texas, United States · 47 MW (Mar 31, 2026) · Operating](https://siscto.si/power-map/microsoft-sat14/)

- [CoreWeave Norway · CoreWeave · Øvrebø, Agder, Norway · 42 MW (Aug 15, 2026) · Operating](https://siscto.si/power-map/coreweave-norway/)

- [Southgate Melbourne · Firmus · Melbourne, Victoria, Australia · 41 MW (Aug 9, 2026) · Operating](https://siscto.si/power-map/southgate-melbourne/)

- [Start Campus Sines Data Campus · Nscale · Sines, Setúbal, Portugal · 33 MW (Aug 16, 2026) · Operating, expanding](https://siscto.si/power-map/start-campus-sines-data-campus/)

- [Vantage TX1 · Not public · San Antonio, Texas, United States · 32 MW (Feb 15, 2026) · Operating, expanding](https://siscto.si/power-map/vantage-tx1/)

- [CoreWeave Dalton 1 & 2 · CoreWeave · Dalton, Georgia, United States · 28 MW (Feb 20, 2026) · Operating](https://siscto.si/power-map/coreweave-dalton-1-and-2/)

- [xAI QTS Atlanta · SpaceXAI · Atlanta, Georgia, United States · 17.3 MW (Jul 10, 2026) · Operating](https://siscto.si/power-map/xai-qts-atlanta/)

- [Nscale Keflavik · Nscale · Reykjanesbær, Suðurnes, Iceland · 5.1 MW (Jul 27, 2026) · Operating, expanding](https://siscto.si/power-map/nscale-keflavik/)

- [Anthropic Barber Lake · Cipher Mining · Colorado City, Texas, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/anthropic-barber-lake/)

- [CoreWeave Lancaster Greenfield site · CoreWeave · Lancaster, Pennsylvania, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/coreweave-lancaster-greenfield-site/)

- [CoreWeave Muskogee OK · CoreWeave · Muskogee, Oklahoma, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/coreweave-muskogee-ok/)

- [Crusoe Abilene Expansion · Microsoft · Abilene, Texas, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/crusoe-abilene-expansion/)

- [EcoDataCenter 2 · Mistral AI · Borlänge, Dalarna County, Sweden · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/ecodatacenter-2/)

- [Goodnight · Google · Claude, Texas, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/goodnight/)

- [Google Cedar Rapids · Google · Cedar Rapids, Iowa, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/google-cedar-rapids/)

- [Google Fort Wayne · Google · Fort Wayne, Indiana, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/google-fort-wayne/)

- [Meta Bowling Green · Meta · Bowling Green, Ohio, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/meta-bowling-green/)

- [Meta Hyperion · Meta · Holly Ridge, Louisiana, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/meta-hyperion/)

- [Microsoft Narvik Norway · Nscale · Bjerkvik, Narvik, Norway · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/microsoft-narvik-norway/)

- [OpenAI Stargate Lordstown · Softbank · Lordstown, Ohio, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-lordstown/)

- [OpenAI Stargate Michigan · Oracle · Benton, Michigan, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-michigan/)

- [OpenAI Stargate Milam · Softbank · Burlington, Texas, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-milam/)

- [OpenAI Stargate New Mexico · Oracle · Santa Teresa, New Mexico, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-new-mexico/)

- [OpenAI Stargate Shackelford · Oracle · Abilene, Texas, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-shackelford/)

- [OpenAI Stargate UAE · G42 · Abu Dhabi, Abu Dhabi, United Arab Emirates · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-uae/)

- [OpenAI Stargate Wisconsin · Oracle · Port Washington, Wisconsin, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/openai-stargate-wisconsin/)

- [QTS Cedar Rapids · Meta · Cedar Rapids, Iowa, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/qts-cedar-rapids/)

- [QTS Eagle Mountain · Meta · Eagle Mountain, Utah, United States · Not stated (Epoch AI) · Under construction](https://siscto.si/power-map/qts-eagle-mountain/)

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain). [Download the data (JSON)](https://siscto.si/assets/data/power-sites.json)

How it knows

## Public data, never a guess

Every number on the Power Map comes from a public source with a date. Where a source states nothing, the map says so.

### One public tracker

[Epoch AI](https://epoch.ai/data/ai-data-centers) follows the largest SI data centers on Earth through permits, filings, company reports and satellite images, and publishes it under CC BY.

### Real coordinates

Each dot sits on the coordinates Epoch AI publishes with its own map, in the town and region it names.

### Power with a date

IT power is Epoch AI's estimate on its latest dated entry for the site. The date is always shown next to the figure.

### A dated timeline

Every site page lists Epoch AI's dated notes, from land clearing to the last building, and its projections, marked as such.

Adopt a site

### The Gigawatt Ledger

What each operator announced, set against the power public evidence confirms as running: 14.8 GW announced, 3.3 to 4.25 GW confirmed energized across 18 projects, every row with its source.

[Open the Ledger](https://siscto.si/ledger/)

### SI Next Door

Enter a ZIP code to see the SI data centers within reach, builds on the way, hearings, your state's home power price and sourced facts on what data center demand adds to costs.

[Look up your ZIP code](https://siscto.si/next-door/)

### Heat Watch

Every site's summer land heat from NASA's MODIS satellites against the land 5 to 10 km around it: +0.5 °C on average by day over the last three summers. One public signal, next to what is built.

[See the heat](https://siscto.si/heat-watch/)

### Lights On

NASA's night-light imagery over all 96 sites, month by month since 2018, beside what is announced and what is built. In October 2026, 66 of 96 sites were brighter than a year before. Light is one public signal, never proof a site is running.

[See the lights](https://siscto.si/lights-on/)

## Watch a site, sign your updates

Every site can have one named watcher: an SI Passport holder who files dated updates from public sources and their own eyes. The team reviews each update before it shows.

### Sign in

Use your SI Passport: a free message signature with your Solana wallet. It never moves tokens.

### Adopt

Open a site without a watcher and adopt it. Your Passport name shows on the site page as its watcher.

### File dated updates

A short note, an optional link to a public source and an optional photo. Photos are made fresh on the server, without their metadata.

### Reviewed first

Nothing a watcher files shows publicly until the team approves it. Approved updates stay on the page with their date.

Questions

## The Power Map, answered

Where the data comes from, what the numbers mean and how watching a site works.

### What is the Power Map?

A world map of every SI data center that public data confirms, with a page for each site. It draws on [Epoch AI](https://epoch.ai/data/ai-data-centers)'s public tracker "AI data centers", which follows the largest SI data centers on Earth through permits, filings, company reports and satellite images. Each site shows its owner, its town, its status and its IT power where Epoch AI states it, with the date and the sources.

### Where do the numbers come from?

Every fact comes from Epoch AI's public data (CC BY 4.0): the site list, the owners, the coordinates Epoch publishes with its own map, and a dated timeline for each site. The power figure is Epoch AI's estimate of IT power on the latest timeline date, shown with that date. Nothing on the map is guessed: a site without a stated figure says so.

### What is IT power?

The power that reaches the computers themselves: servers, accelerators, storage and networking. A whole site draws more than that, because cooling and power conversion take their share. Where Epoch AI states the whole site's draw too, the site page shows it as facility power.

### How is a site's status decided?

From Epoch AI's dated timeline. Operating means Epoch AI counts at least one building running; operating and expanding means more capacity is on the timeline for a later date; under construction means no building is running yet. Epoch AI adds planned sites only once they are under construction.

### How do I adopt a site?

Open a site page and sign in with your SI Passport, a free message signature with your Solana wallet that never moves tokens. If the site has no watcher yet, you become its named watcher and can file dated updates: a short note, a link to a public source and a photo. The team reviews every update before it shows on the page. One Passport watches up to three sites.

### Is $SIS linked to these companies?

No. $SIS is a community meme token with no affiliation with, or endorsement from, any company named on the map or with Epoch AI. The map shows public data with its sources.

Join the takeover

## Watch the race on the ground

Open any site on the map, adopt it and file what you see. Follow the build race in the Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)
