Power Map · Operating

# Meta Aiken, Aiken

Meta Aiken is an SI data center in Aiken, South Carolina, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 129 MW as of November 5, 2026, with 2 buildings operating. Its public timeline starts on May 30, 2024.

IT power
:   129 MW (Nov 5, 2026)

Facility power
:   168 MW

Status
:   Operating

Buildings operating
:   2

Where it is

## The site and its facts

Meta Aiken on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Aiken, South Carolina, United States

Address
:   7601 State Hwy 105, Trenton, SC 29847, USA

Coordinates
:   33.6424° N, 81.8428° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 147,044 H100 equivalents (Epoch AI estimate, Nov 5, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.4 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-aiken/)

### Lights On

NASA's night imagery read 26.9 of 100 over this site in October 2026, against 9.8 in October 2018, the first month read. Against a year before: -2.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-aiken#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Aiken, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**May 30, 2024**

> Land clearing begins

No IT power yet (0 operating)

**Apr 8, 2026**

> Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation.

No IT power yet (0 operating)

**Aug 7, 2026**

> Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.

69 MW (1 operating)

**Nov 5, 2026**

> Building 2 is operational assuming a 3 month lag compared to Building 1.

129 MW (2 operating)

Adopt a site

## Watch Meta Aiken

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Meta Introduction to the Aiken Project](https://datacenters.atmeta.com/2024/08/hello-south-carolina/)

- [DPR Construction project page](https://www.dpr.com/projects/meta-aiken-data-center-aiken-sc)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Aiken (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

239 km away

### xAI QTS Atlanta

Atlanta, Georgia, United States

17.3 MW IT power

249 km away

### Microsoft Fairwater Atlanta

Fayetteville, Georgia, United States

636 MW IT power

256 km away

### CoreWeave Marble NC

Marble, North Carolina, United States

65 MW IT power

310 km away

### CoreWeave Dalton 1 & 2

Dalton, Georgia, United States

28 MW IT power

Questions

## Meta Aiken, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Aiken?

Meta Aiken is in Aiken, South Carolina, United States, at 7601 State Hwy 105, Trenton, SC 29847, USA. Epoch AI publishes its coordinates as 33.6424, -81.8428.

### Who owns Meta Aiken?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Aiken use?

Epoch AI estimates its IT power at 129 MW as of November 5, 2026, and its total facility power at 168 MW.

### Is Meta Aiken operating?

Yes. Epoch AI counts 2 buildings operating as of November 5, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).