# Meta Gallatin SI Data Center, Gallatin, TN | $SIS

> Meta Gallatin is an SI data center in Gallatin, Tennessee, owned by Meta. Epoch AI puts its IT power at 87 MW (Aug 24, 2026). Map, dated timeline and sources.

Source: https://siscto.si/power-map/meta-gallatin/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta Gallatin

Power Map · Operating

# Meta Gallatin, Gallatin

Meta Gallatin is an SI data center in Gallatin, Tennessee, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 87 MW as of August 24, 2026, with 1 building operating. Its public timeline starts on September 11, 2023.

IT power
:   87 MW (Aug 24, 2026)

Facility power
:   114 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

Meta Gallatin on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Gallatin, Tennessee, United States

Address
:   1 Meta Lp, Gallatin, TN 37066

Coordinates
:   36.4071° N, 86.3685° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 99,545 H100 equivalents (Epoch AI estimate, Aug 24, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-gallatin/)

### Lights On

NASA's night imagery read 18.1 of 100 over this site in October 2026, against 3.8 in October 2018, the first month read. Against a year before: +2.5 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-gallatin#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Gallatin, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Sep 11, 2023**

> Land clearing starts for Building 1.

No IT power yet (0 operating)

**Feb 9, 2026**

> Building 1 shell and cooling looks complete, but construction equipment is still seen around cooling and building.

No IT power yet (0 operating)

**Aug 24, 2026**

> Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.

87 MW (1 operating)

Adopt a site

## Watch Meta Gallatin

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Meta fact sheet](https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf)

- [Campus extension announcement](https://www.gallatingetsit.com/newsroom/meta-approved-for-another-data-center-on-gallatin-campus)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Gallatin (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

174 km away

### Meta Huntsville

Huntsville, Alabama, United States

146 MW IT power

227 km away

### Meta Jeffersonville

Jeffersonville, Indiana, United States

178 MW IT power

228 km away

### CoreWeave Dalton 1 & 2

Dalton, Georgia, United States

28 MW IT power

259 km away

### CoreWeave Marble NC

Marble, North Carolina, United States

65 MW IT power

Questions

## Meta Gallatin, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Gallatin?

Meta Gallatin is in Gallatin, Tennessee, United States, at 1 Meta Lp, Gallatin, TN 37066. Epoch AI publishes its coordinates as 36.4071, -86.3685.

### Who owns Meta Gallatin?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Gallatin use?

Epoch AI estimates its IT power at 87 MW as of August 24, 2026, and its total facility power at 114 MW.

### Is Meta Gallatin operating?

Yes. Epoch AI counts 1 building operating as of August 24, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).