# Meta Huntsville SI Data Center, Huntsville, AL | $SIS

> Meta Huntsville is an SI data center in Huntsville, Alabama, owned by Meta. Epoch AI puts its IT power at 146 MW (Jun 2, 2026). Map, dated timeline and sources.

Source: https://siscto.si/power-map/meta-huntsville/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta Huntsville

Power Map · Operating

# Meta Huntsville, Huntsville

Meta Huntsville is an SI data center in Huntsville, Alabama, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 146 MW as of June 2, 2026, with 2 buildings operating. Its public timeline starts on December 13, 2021.

IT power
:   146 MW (Jun 2, 2026)

Facility power
:   198 MW

Status
:   Operating

Buildings operating
:   2

Where it is

## The site and its facts

Meta Huntsville on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Huntsville, Alabama, United States

Address
:   5400 Prosperity Dr NW, Toney, AL

Coordinates
:   34.8539° N, 86.6262° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 166,761 H100 equivalents (Epoch AI estimate, Jun 2, 2026)

Energy
:   Tennessee Valley Authority, NextEra Energy Resources, First Solar

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-huntsville/)

### Lights On

NASA's night imagery read 26.0 of 100 over this site in October 2026, against 2.9 in October 2018, the first month read. Against a year before: -2.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-huntsville#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Huntsville, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Dec 13, 2021**

> Building 1 land clearing begins.

No IT power yet (0 operating)

**Mar 3, 2025**

> Building 2 roof starts to go on and its cooling installation is in progress.

No IT power yet (0 operating)

**Nov 4, 2025**

> We believe Building 1 and 2 are still being finished due to continued construction vehicles and unfinished land around the data center sites.

No IT power yet (0 operating)

**Feb 2, 2026**

> Color artifacts appear on small number of Building 1 fans. Continued presence of construction equipment and unfinished land around Building 2 suggests the final phase of construction.

No IT power yet (0 operating)

**Mar 4, 2026**

> We estimate that Building 1 is operational 30 days after the appearance of color artifacts on the fans.

78 MW (1 operating)

**Jun 2, 2026**

> We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.

146 MW (2 operating)

Adopt a site

## Watch Meta Huntsville

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Announcement of expansion completing in 2026](https://plateauexcavation.com/projects/huntsville-meta-data-center-meta-project-ferris/)

- [TVA solar installation announcements](https://www.prnewswire.com/news-releases/tva-announces-largest-valley-solar-installations--built-for-facebook-300743255.html)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Huntsville (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

154 km away

### CoreWeave Dalton 1 & 2

Dalton, Georgia, United States

28 MW IT power

174 km away

### Meta Gallatin

Gallatin, Tennessee, United States

87 MW IT power

235 km away

### xAI QTS Atlanta

Atlanta, Georgia, United States

17.3 MW IT power

248 km away

### Microsoft Fairwater Atlanta

Fayetteville, Georgia, United States

636 MW IT power

Questions

## Meta Huntsville, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Huntsville?

Meta Huntsville is in Huntsville, Alabama, United States, at 5400 Prosperity Dr NW, Toney, AL. Epoch AI publishes its coordinates as 34.8539, -86.6262.

### Who owns Meta Huntsville?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Huntsville use?

Epoch AI estimates its IT power at 146 MW as of June 2, 2026, and its total facility power at 198 MW.

### Is Meta Huntsville operating?

Yes. Epoch AI counts 2 buildings operating as of June 2, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).