# Meta Hyperion, Holly Ridge

Meta Hyperion is an SI data center in Holly Ridge, Louisiana, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of April 19, 2026, and projects 1,632 MW by January 1, 2028. Its public timeline starts on December 20, 2024.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Meta Hyperion on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Holly Ridge, Louisiana, United States

Address
:   Holly Ridge, LA 71269

Coordinates
:   32.5106° N, 91.6360° W

Owner
:   Meta

Users
:   Meta

Project
:   Hyperion

Energy
:   Entergy

Builders
:   Mortenson

Projected
:   1,632 MW IT power by January 1, 2028 (Epoch AI projection, not a fact yet)

Seen from orbit · Compute Watch

### The newest clear pass over Meta Hyperion

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

[Open Compute Watch](https://siscto.si/compute/)

Timeline

### The Gigawatt Ledger

Meta Hyperion: 2 GW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of April 19, 2026.

[Open it in the Ledger](https://siscto.si/ledger/meta-hyperion/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.6 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-hyperion/)

### Lights On

NASA's night imagery read 64.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +34.3 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-hyperion#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Hyperion, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Dec 20, 2024**

> Land clearing begins.

No IT power yet (0 operating)

**Oct 19, 2025**

> Foundations are underway for the main buildings, and the overall layout aligns with the [architectural renderings](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) published in 2025.

No IT power yet (0 operating)

**Apr 19, 2026**

> Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.

No IT power yet (0 operating)

**Dec 1, 2026 (Projection)**

> New [power stations](https://drive.google.com/file/d/1D4eUHwEuirNi0g3IU_xGOti3PcC8fcXi/view?usp=sharing) are in service for a 1.8 GW load at Holly Ridge. However, the data center is still not operational.

No IT power yet (0 operating)

**Jan 1, 2028 (Projection)**

> First phase is operational, based on a [Meta blog post](https://drive.google.com/file/d/1PmFNgOwkPepwjpGIbNUuPJP0LNgIqe7l/view?usp=sharing). We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta [claims](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidence for this happening at the Holly Ridge site alone.

1,632 MW (9 operating)

Adopt a site

## Watch Meta Hyperion

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Data center profile by Meta](https://datacenters.atmeta.com/richland-parish-data-center/)

- [Entergy's application for generation and transmission resources](https://drive.google.com/file/d/1FLY13apaHy4hI8RNVk9n_nlJpwFHtBrB/view?usp=sharing)

- [MISO update with 1.8 GW substation plan](https://drive.google.com/file/d/1D4eUHwEuirNi0g3IU_xGOti3PcC8fcXi/view?usp=sharing)

- [S&P Global ratings research with 2.064 GW campus details](https://www.spglobal.com/ratings/en/regulatory/article/-/view/sourceId/101653176)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Hyperion (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

136 km away

### Amazon Ridgeland

Ridgeland, Mississippi, United States

228 MW IT power

145 km away

### Amazon Madison Mega Site

Canton, Mississippi, United States

284 MW IT power

313 km away

### Colossus 2

Memphis, Tennessee, United States

946 MW IT power

315 km away

### Colossus 1

Memphis, Tennessee, United States

340 MW IT power

Questions

## Meta Hyperion, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Hyperion?

Meta Hyperion is in Holly Ridge, Louisiana, United States, at Holly Ridge, LA 71269. Epoch AI publishes its coordinates as 32.5106, -91.6360.

### Who owns Meta Hyperion?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Hyperion use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,632 MW of IT power by January 1, 2028.

### Is Meta Hyperion operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).