# Meta Jeffersonville SI Data Center, Jeffersonville, IN

> Meta Jeffersonville is an SI data center in Jeffersonville, Indiana, owned by Meta. Epoch AI puts its IT power at 178 MW (Jun 4, 2026). Map and timeline.

Source: https://siscto.si/power-map/meta-jeffersonville/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta Jeffersonville

Power Map · Operating

# Meta Jeffersonville, Jeffersonville

Meta Jeffersonville is an SI data center in Jeffersonville, Indiana, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 178 MW as of June 4, 2026, with 2 buildings operating. Its public timeline starts on February 1, 2024.

IT power
:   178 MW (Jun 4, 2026)

Facility power
:   241 MW

Status
:   Operating

Buildings operating
:   2

Where it is

## The site and its facts

Meta Jeffersonville on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Jeffersonville, Indiana, United States

Address
:   500 8th St, Jeffersonville, IN 47130, USA

Coordinates
:   38.3695° N, 85.6643° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 203,133 H100 equivalents (Epoch AI estimate, Jun 4, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.2 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-jeffersonville/)

### Lights On

NASA's night imagery read 69.3 of 100 over this site in October 2026, against 29.4 in October 2018, the first month read. Against a year before: +4.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-jeffersonville#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Jeffersonville, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Feb 1, 2024**

> Land clearing begins.

No IT power yet (0 operating)

**Mar 6, 2026**

> Building 1 and 2 shell and cooling look complete, but there's still construction activity. We give it another 3 months to operational.

No IT power yet (0 operating)

**Jun 4, 2026**

> Building 1 and 2 are operational.

178 MW (2 operating)

Adopt a site

## Watch Meta Jeffersonville

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Official Meta Fact Sheet](https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Jeffersonville-Data-Center.pdf)

- [Turner Construction contractor presenting their involvement in the project.](https://www.turnerconstruction.com/insights/turner-construction-company-to-build-hyperscale-data-center-for-meta-in-indiana)

- [Air Quality Permit for initial buildout](https://drive.google.com/file/d/1RpOCS_z32qaWskhhAJL8_QjU9VSz5Eqh/view?usp=sharing)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Jeffersonville (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

227 km away

### Meta Gallatin

Gallatin, Tennessee, United States

87 MW IT power

283 km away

### Google Columbus

Columbus, Ohio, United States

303 MW IT power

298 km away

### Google Lancaster

Lancaster, Ohio, United States

137 MW IT power

301 km away

### Google Fort Wayne

Fort Wayne, Indiana, United States

IT power not stated

Questions

## Meta Jeffersonville, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Jeffersonville?

Meta Jeffersonville is in Jeffersonville, Indiana, United States, at 500 8th St, Jeffersonville, IN 47130, USA. Epoch AI publishes its coordinates as 38.3695, -85.6643.

### Who owns Meta Jeffersonville?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Jeffersonville use?

Epoch AI estimates its IT power at 178 MW as of June 4, 2026, and its total facility power at 241 MW.

### Is Meta Jeffersonville operating?

Yes. Epoch AI counts 2 buildings operating as of June 4, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).
