> Meta Kuna is an SI data center in Kuna, Idaho, owned by Meta. Epoch AI puts its IT power at 152 MW (Jun 1, 2026). Map, timeline, sources and its watcher.

Source: https://siscto.si/power-map/meta-kuna/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta Kuna

Power Map · Operating

# Meta Kuna, Kuna

Meta Kuna is an SI data center in Kuna, Idaho, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 152 MW as of June 1, 2026, with 2 buildings operating. Its public timeline starts on July 1, 2022.

IT power
:   152 MW (Jun 1, 2026)

Facility power
:   198 MW

Status
:   Operating

Buildings operating
:   2

Where it is

## The site and its facts

Meta Kuna on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Kuna, Idaho, United States

Address
:   601 Kuna Mora Rd, Kuna ID 83634

Coordinates
:   43.4675° N, 116.2702° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 173,248 H100 equivalents (Epoch AI estimate, Jun 1, 2026)

Energy
:   Idaho Power Company

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +3.0 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-kuna/)

### Lights On

NASA's night imagery read 21.1 of 100 over this site in October 2026, against 1.7 in October 2018, the first month read. Against a year before: +10.9 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-kuna#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Kuna, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jul 1, 2022**

> Land clearing begins.

No IT power yet (0 operating)

**Mar 15, 2026**

> Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buildings to the north. Meta announced the arrival of the first server rack the following week.

No IT power yet (0 operating)

**Jun 1, 2026**

> Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.

152 MW (2 operating)

Adopt a site

## Watch Meta Kuna

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Official Pamphlet from Meta](https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Kuna-Data-Center.pdf)

- [Application for Power Purchase Agreement, Pleasant Valley Solar 1](https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2229/CaseFiles/20221114Application.pdf)

- [Application for Power Purchase Agreement, Pleasant Valley Solar 2](https://lf-puc.idaho.gov/WebLink/DocView.aspx?dbid=0&id=73294)

- [Approval to move start date of Solar 2 to May 31, 2026](https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2420/OrdNotc/20240913Final_Order_No_36322.pdf)

- [staff comments](https://lf-puc.idaho.gov/WebLink/DocView.aspx?dbid=0&id=135751)

- [Notice of Application for 3rd PPA (Blacks Creek Energy Center)](https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2442/OrdNotc/20241210Notice_of_Application_Order_No_36419.pdf)

- [Idaho Statesman: Peak construction reached in March 2025](https://www.idahostatesman.com/news/business/article304464416.html)

- [Idaho Statesman: Expected water usage reported in 2022](https://www.idahostatesman.com/opinion/from-the-opinion-editor/article259250030.html)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Kuna (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

459 km away

### Google The Dalles

The Dalles, Oregon, United States

154 MW IT power

500 km away

### QTS Eagle Mountain

Eagle Mountain, Utah, United States

IT power not stated

501 km away

### Meta Eagle Mountain

Eagle Mountain, Utah, United States

133 MW IT power

514 km away

### Google Storey County

Clark, Nevada, United States

161 MW IT power

Questions

## Meta Kuna, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Kuna?

Meta Kuna is in Kuna, Idaho, United States, at 601 Kuna Mora Rd, Kuna ID 83634. Epoch AI publishes its coordinates as 43.4675, -116.2702.

### Who owns Meta Kuna?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Kuna use?

Epoch AI estimates its IT power at 152 MW as of June 1, 2026, and its total facility power at 198 MW.

### Is Meta Kuna operating?

Yes. Epoch AI counts 2 buildings operating as of June 1, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).