# Meta-QTS Hillsboro 2 SI Data Center, Hillsboro, OR | $SIS

> Meta-QTS Hillsboro 2 is an SI data center in Hillsboro, Oregon, owned by Meta. Epoch AI puts its IT power at 180 MW (Apr 17, 2026). Map, timeline and sources.

Source: https://siscto.si/power-map/meta-qts-hillsboro-2/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta-QTS Hillsboro 2

Power Map · Operating

# Meta-QTS Hillsboro 2, Hillsboro

Meta-QTS Hillsboro 2 is an SI data center in Hillsboro, Oregon, United States, owned by Meta (Epoch AI rates this likely) and used by Meta (Epoch AI rates this likely). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 180 MW as of April 17, 2026, with 4 buildings operating. Its public timeline starts on April 1, 2021.

IT power
:   180 MW (Apr 17, 2026)

Facility power
:   243 MW

Status
:   Operating

Buildings operating
:   4

Where it is

## The site and its facts

Meta-QTS Hillsboro 2 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Hillsboro, Oregon, United States

Address
:   4755 NE Huffman St, Hillsboro, OR 97124

Coordinates
:   45.5588° N, 122.9378° W

Owner
:   Meta (Epoch AI rates this likely)

Users
:   Meta (Epoch AI rates this likely)

Chips
:   H100

Compute
:   About 123,839 H100 equivalents (Epoch AI estimate, Apr 17, 2026)

Energy
:   Portland General Electric, Avangrid

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.2 °C against the land 5 to 10 km around it by day, a change of +1.2 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/meta-qts-hillsboro-2/)

### Lights On

NASA's night imagery read 46.5 of 100 over this site in October 2026, against 30.7 in October 2018, the first month read. Against a year before: -1.2 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-qts-hillsboro-2#view)

## Dated, from the public record

Epoch AI's dated notes on Meta-QTS Hillsboro 2, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 1, 2021**

> First signs of site land clearing appear on satellite imagery.

No IT power yet (0 operating)

**Apr 29, 2023**

> Satellite imagery shows Building 3 and 4 cooling start to go on.

No IT power yet (0 operating)

**Aug 2, 2023**

> Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of construction equipment on or immediately around the building.

45 MW (1 operating)

**Nov 8, 2024**

> We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.

180 MW (4 operating)

**Apr 14, 2025**

> All four buildings are operational

180 MW (4 operating)

**Apr 17, 2026**

> All four buildings are operational.

180 MW (4 operating)

Adopt a site

## Watch Meta-QTS Hillsboro 2

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [QTS Hillsboro 2 data center announcement](https://q.com/data-centers/hillsboro-2/)

- [QTS and Meta sign an agreement with PGE for a 120MWac solar installation](https://q.com/news/avangrid-and-portland-general-electric-collaborate-with-qts-and-meta-to-build-120-mwac-solar-project-in-oregon/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta-QTS Hillsboro 2 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

135 km away

### Google The Dalles

The Dalles, Oregon, United States

154 MW IT power

577 km away

### Meta Kuna

Kuna, Idaho, United States

152 MW IT power

733 km away

### Google Storey County

Clark, Nevada, United States

161 MW IT power

1,064 km away

### QTS Eagle Mountain

Eagle Mountain, Utah, United States

IT power not stated

Questions

## Meta-QTS Hillsboro 2, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta-QTS Hillsboro 2?

Meta-QTS Hillsboro 2 is in Hillsboro, Oregon, United States, at 4755 NE Huffman St, Hillsboro, OR 97124. Epoch AI publishes its coordinates as 45.5588, -122.9378.

### Who owns Meta-QTS Hillsboro 2?

Epoch AI lists Meta (Epoch AI rates this likely) as its owner and Meta (Epoch AI rates this likely) as its user.

### How much power does Meta-QTS Hillsboro 2 use?

Epoch AI estimates its IT power at 180 MW as of April 17, 2026, and its total facility power at 243 MW.

### Is Meta-QTS Hillsboro 2 operating?

Yes. Epoch AI counts 4 buildings operating as of April 17, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).